KYIV METRO

4-Line

Ukraine

Population – 46 314 736; Number of regions – 25;Capital – Kyiv

City of Kyiv

Kyiv Metro operational database

The first section of Kyiv Metro first line has been opened in 1960;

At our days operates three lines

with 46 stations;

3 interchanges;

3 depots;

Operational length of lines - 59,9 km;

Operational length of tunnels - 51,9 km;

Rolling Stock– 689 metro cars, 5 of them are special.

Metro line section from “Hlybochitskaya” metro station to

“Raduzhnaya” metro station

Metro line section from “Ulitsa Miloslavskaya” metro station to

“Prospect Vatutina” metro station

Troeschyna depot

Metro line section from “Hlybochitskaya” metro station to “Ulitsa Miloslavskaya” metro station

with Troeschyna depot

Podolsko-Vygurovskaya and Levoberezhnaya lines

OPERATIONAL DATABASE

Podolsko-Vygurovskaya and Levoberezhnaya lines Construction cost – 7386,96 million UAH (prices of 2007–2008 years).

Construction length – 18,25 km (10,9 km + 7,35 km).

Operational length – 11,99 km (7,03 km + 4,96 km).

Number of stations – 12 (6 stations + 6 stations), including 2 interchanges.

Carrying capacity – 40,8 thousands passengers per hour on Podilsko-

Vygurivska line (PVL) and 42,0 thousands passengers per hour on

Livoberezhna line (LTO).

Rolling Stock capacity – 40,0 pairs of metro-cars per hour.

Rolling Stock - 6 metro cars in metro train.

Job opportunities – 1 280 (PVL - 570, LTO - 710)

Construction works – 2010 - 2017 years. (PVL – 62 months , LTO – 48 months).

PODOLSKO-VYGUROVSKAYA LINE

“Hlybochitskaya” metro station(deep foundation)

Metro line section from “Hlybochitskaya” metro station to “Ulitsa Miloslavskaya” metro station

PODOLSKO-VYGUROVSKAYA LINE

“Podolskaya” station (trestle version)

Metro line section from “Hlybochitskaya” metro station to “Ulitsa Miloslavskaya” metro station

PODOLSKO-VYGUROVSKAYA LINE

“Sudnostroitelnaya” station(trestle version)

Metro line section from “Hlybochitskaya” metro station to “Ulitsa Miloslavskaya” metro station

PODOLSKO-VYGUROVSKAYA LINE

“Trukhanov ostrov” station (trestle version)

Metro line section from “Hlybochitskaya” metro station to “Ulitsa Miloslavskaya” metro station

PODOLSKO-VYGUROVSKAYA LINE“Raduzhnaya” station

(shallow station)

Metro line section from “Hlybochitskaya” metro station to “Ulitsa Miloslavskaya” metro station

LEVOBEREZHNAYA LINE Variants of stations, covers and interchanges

Metro line section from “Hlybochitskaya” metro station to “Ulitsa Miloslavskaya” metro station

LEVOBEREZHNAYA LINE“Prospect Vatutina” station (ground station)

Metro line section from “Hlybochitskaya” metro station to “Ulitsa Miloslavskaya” metro station

LEVOBEREZHNAYA LINE

“Ulitsa Kashtanovaya” station (ground station)

Metro line section from “Hlybochitskaya” metro station to “Ulitsa Miloslavskaya” metro station

LEVOBEREZHNAYA LINE

“Ulitsa Saburova”station (ground station)

Metro line section from “Hlybochitskaya” metro station to “Ulitsa Miloslavskaya” metro station

LEVOBEREZHNAYA LINE

“Ulitsa Mariny Tsvetaievoi” (ground station)

Metro line section from “Hlybochitskaya” metro station to “Ulitsa Miloslavskaya” metro station

TROESCHYNA DEPOTConstruction cost – 2 359,47 million UAH (prices of 2007)Land area – 18,66 haBuilding area – 64,000 m2Rolling stock capasity – 300 metro-carsJob opportunities – 1219Construction works – 2010 - 2019 years. (103 months)

NEED FOR ROLLING STOCK

(Ukraine)(Russia)

Estimated funding – 4000,0 million UAHNumber of metro-cars – 250 (6 carriages )

Perspective is rolling with asynchronous traction drive

(Other countries )