kuseleka opencast

Post on 03-Jul-2015

47 Views

Category:

Business

6 Downloads

Preview:

Click to see full reader

DESCRIPTION

Opencast Contract Mining, Drill, Blast, Load, Haul, Crushing

TRANSCRIPT

www.construction.murrob.com

KHUSELEKA North-West, Rustenburg

PROJECT TYPE: OPENCAST MINING

CLIENT:

Anglo Platinum Limited

VALUE:

R109 Million

CONSULTANTS:

None

PROJECT DURATION:

24 Months

DATE OF PROJECT:

1 November 2011

PROJECT DESCRIPTION:

Opencast Mining of Merensky Reef to a depth of

20m.

Approximate volumes mined for the project :-

• Topsoil 384,428m³

• Overburden 1,342,440m³

• Ore 169,878m³

• Topsoil Rehab 337,189m³

• Filling Void 1,039,109m³