DESIGNED IN FOUR STAGES

STAGE I 2*110 MWSTAGE II 2*210 MWSTAGE III 1*210 MWSTAGE IV 1*195 MW

TOTAL GENERATION 1045 MW

MAIN PARTS OF KTPS

FUEL & ASH PLANTAIR& GAS PLANTFEED WATER & STEAM PLANTCOOLING WATER PLANT

TURBO GENERATOR

TECHNICAL SPECIFICATIONS KW 210000 P.F. 0.85 KVA 247000

STATOR VOLTS 15750 AMPS 9050 ROTOR VOLTS 310 AMPS 2600 R.P.M. 3000 FREQ. 50 HZ PHASE 3 COOLING HYDROGEN COOLED

STEAM TURBINE WORKS IN THREE STAGES :-• HP (HIGH PRESSURE)• IP (INTERMEDIATE PRESSURE)• LP (LOW PRESSURE) RATED SPEED - 3000 r.p.m MAIN STEAM TEMP. - 535 ° C MAIN STEAM PRESSURE - 150 Kg/Cm2

RATED O/P - 210 MW

BOILER• TYPE : TANGENTIALLY FIRED,NATURAL

CIRCULATION BALANCED DRAFT WATER TUBE BOILER.

• NO. OF UNITS : 2

• STEAM PRESSURE : 139 Kg/Cm2

• EFFICIENCY : 86.6 %

• MEANS OF COAL INPUT : P.A. FANS

• TEMP. IN BOILER : 1500-20000C

PRIMARY AIR SYSTEM

TURBINE – GENERATOR VIEW

COAL HANDLING PLANT

• SOURCE OF COAL : COAL INDIA LTD. BCCL,SECL & ECL• MEANS OF TRANSPORTATION: - RAILWAY

WAGONS • TYPE OF COAL : BITUMINOUS TAKEN TO COAL MILLS THROUGH

CONVEYOUR BELTS. CRUSHED INTO POWDERED FORM IN COAL

MILLS. WITH THE HELP OF PRIMARY AIR FANS IT IS TAKEN TO BOILER.

ASH HANDLING PLANT

THE WATER COMPOUNDED BOTTOM ASH RECEIVED IN ASH HOPPERS FROM FURNACE.

THEN DISCHARGED THROUGH CLINKER GRINDER

TWO SLURRY PUMPS FOR EACH BOILER. SLURRY IS DISCHARGED THROUGH PIPE

LINES.

WATER TREATMENT PLANT

• SOURCE OF WATER :- CHAMBAL RIVER• DIVIDED IN TWO PARTS :- 1. FILTERATION PLANT 2. DEMINERALISED WATER PLANT SUSPENDED PARTICLES ARE SEPARATED WATER IS TREATED WITH ALUM &

CHLORINE . THEN WATER IS PASSED THROUGH FILTER

BEDS. NOW WATER IS SEND TO D.M. PLANT.

WATER TREATEMENT PLANT

IN D.M. PLANT :- 1.) TREATED WITH CARBON FILTER 2.) ANION EXCHANGER 3.) CATION EXCHANGER 4.) MIXED BED 5.) DEGASIFIER 6.) DOSED WITH AMMONIA TO SET pH VALUE.

TRANSFORMERS

GENERATING TRANSFORMERSUNIT AUXILARY TRANSFORMERSSTATION TRONSFORMERS INSTRUMENT TRANSFORMERS EXCITING TRANSFORMERS

TRANSFORMERS • GENERATING TRANSFORMERS :- # FOR UNIT 1&2: PHASES :- 3 CONNECTION :- H.V –STAR; L.V – DELTA. RATING :- 125 MVA, 11/240 KV# FOR UNIT 3,4,5&6: RATING :-250 MVA TRANSFORMATION RATIO :- 15.75/220 KV CONNECTION :- DELTA – L.V; STAR – H.V . TRIP TEMP. :- 1.) OIL - 100 2.) WDG. – 125

TRANSFORMERS

• U.A.T SPECIFICATION : RATING : - 15 MVA RATED PRIMARY VOLTAGE :- 11 KV RATED SEC. VOLTAGE :- 6.6 KV PHASES :- 3 RATED CURRENT :- HV – 787 A LV – 1237 A• C.T :- RATED VOL. - 220 KV • P.T :- RATED VOL. - 220/110 KV