koyo torrington seven step

Post on 01-Feb-2016

30 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Koyo Torrington Seven Step. Abel Acuña January 21 th 2010. Data. Paynter. Pareto. Prioritize. Closure. Solve. Scorecard. Top level Seven Step process. Development Process Koyo Seven Step. Supplier process “Gain Control” Seven Step focuses supplier and SQD /SQA resources - PowerPoint PPT Presentation

TRANSCRIPT

NRB

Koyo Torrington Seven Step

Abel Acuña January 21th 2010

2NRB

Data

Pareto

Prioritize

Scorecard

Closure

Paynter

Solve

Step 7 Paynter AnalysisProcess

(Effective)

Step 6 Corrective

Action ReviewProcess(Mgmt

Review)

Step 1Data

CollectionProcess Step 2

Pareto AnalysisProcess

Step 3 Prioritization

Process

Step 5 ScorecardProcess

(Exit Criteria)

Step 4Problem SolvingProcess

(Six Sigma)

Top level Seven Step process

3NRB

Development Process Koyo Seven Step

● Supplier process “Gain Control” ● Seven Step focuses supplier and SQD /SQA resources● Utilize the data effectively Pareto high impact

● Establish supplier commitment to “Improve”● The supplier is part of the Value Stream within

Koyo’s manufacturing operations

● Standardize lessons learned● Develop a close loop● Read across commodity

● Eradicate defects● Focus on prevention vs. detection in the process● Sorting alone will not achieve a stable process● Errors can occur and will escape

● Integrate into the APQP model● Go back to the PFMEA and control plan and build on

known risk factors

Data

Pareto

Prioritize

Scorecard

Closure

Paynter

Solve

Step 7 Paynter AnalysisProcess

(Effective )

Step 6 Corrective

Action ReviewProcess(Mgmt

Review)

Step 1Data

CollectionProcess Step 2

Pareto AnalysisProcess

Step 3Prioritization

Process

Step 5 ScorecardProcess

(Exit Criteria )

Step 4Problem SolvingProcess

(Six Sigma)

Data

Pareto

Prioritize

Scorecard

Closure

Paynter

Solve

Step 7 Paynter AnalysisProcess

(Effective )

Step 6 Corrective

Action ReviewProcess(Mgmt

Review)

Step 1Data

CollectionProcess Step 2

Pareto AnalysisProcess

Step 3Prioritization

Process

Step 5 ScorecardProcess

(Exit Criteria )

Step 4Problem SolvingProcess

(Six Sigma)

4NRB

Development Process- Raise the bar

Summary● Build accountability

● It takes leadership at all levels● Protect the supply chain, while your process

is being stabilized

● Leverage value stream network● SQD focus is to work with other functional areas to

balance the “production cell” in the value stream● Treat the supplier as if the Value Stream was within

Koyo’s manufacturing plant● We are dependent on our suppliers performance to

quality and service

5NRB

0

1

1

2

2

3

3

4

Jan

Feb Mar Apr

May Ju

nJu

lAug Sep Oct

Nov DecYTD

DMR

Monthly DMR

2008 Performance = DMR 172009 Performance = DMR 7

Supplier 2010 Performance DMR

6NRB

0%

10%

20%

30%

40%

50%

60%

70%

Defect 1 Defect 2 Defect 3 Defect 4 Defect 5 Defect 6

Supplier – Name Quality Analysis Process Pareto

7NRB

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Defect 1 Defect 2 Defect 3

#1 Issue – DefectPareto Level II

8NRB

Root Cause Analysis -

Action Target

Date

Responsibility Effect

Issue Root Cause Verification – Proof

Actions -

#1 Issue – Defect

9NRB

0

5

10

15

20

25

30

DMR

Mo. DMR

Deployed CS1Deployed CS1

2007 Forecast of C/A Impact2007 Forecast of C/A Impact

Establish Predictive Tool Establish Predictive Tool Maintenance SchedulesMaintenance Schedules

Installed Level 2 Poka-yokeInstalled Level 2 Poka-yoke

#1 Issue – Defect

10NRB

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Defect 2 Defect 3 Defect 4

#2 Issue – Defect

11NRB

Root Cause Analysis -

Action Target

Date

Responsibility Effect

Issue Root Cause Verification – Proof

Actions -

#2 Issue – Defect

12NRB

0

5

10

15

20

25

30

DMR

Mo. DMR

2007 Forecast of C/A Impact2007 Forecast of C/A Impact

#2 Issue – Defect

13NRB

0

10

20

30

40

50

60

DMR

Mo. DMR Goal

CS1 ContainmentCS1 Containment

Level 2 Poka-yokesLevel 2 Poka-yokes

New lever packagingNew lever packaging

Overall Waterfall

14NRB

Defect \ Month Total

0 0 0 0 0 0

0 0 0 0 0 0

0

0

0

0

TOTAL 0 0 0 0 0 0 0 0 0

Corrective Action ImplementedCorrective Action Implemented

Corrective Action Not EffectiveCorrective Action Not Effective

Corrective Action EffectiveCorrective Action Effective

2007 Supplier Effectiveness Paynter Chart

top related