kb home february 2015. nexus & kb 2 year history 2 demos commissioned in 2014 lancaster...
Post on 20-Jan-2016
213 Views
Preview:
TRANSCRIPT
KB HomeFebruary 2015
Nexus & KB
2 year history
2 demos commissioned in 2014Lancaster “Double ZeroHouse”El Dorado Hills “ZeroHouse 3.0”
Current active projectsPomona MWD demonstration programProspective San Diego ZeroHouse
Great press coverage in California
City of Lancaster Better Built Homes Program
Lancaster Dawn Creek
Built late 2013
Launched February 2014
ExposureKTLA Water WednesdayNational GeographicCEC request for
Sacramento siteWatersmart PresentationLancaster BBHP
El Dorado Hills
Built mid 2014
Launched September 2014
ExposureSacramento BeeKCRADecember VIP Tour January VIP Tour
Water Recycling EquipmentThrough our own internal R&D efforts, filed trials with KB Home in El Dorado Hills and Lancaster, and discussion with 3rd parties (including production home plumbers, electricians and structural engineers)
Equipment Layout
Optional tank location for narrow side
yards
Updated Platform Layout
To ease accessAll connections
moved outboardSupport material
minimized on connection end
Height remains adjustable (±3”)
Functionally the same
Temporary cover protects connections
System, when added, is supported on platform
Connections provided:Drains – ABS gluePressure – NPT
threadElec. – PVC conduit
Connections
Details in following slides
Sewer Plan
Raw Grey Water Plan
Treated Water Plan
Potable Water Plan
Power Plan
Optional Rain Water
eReay: Recycle Ready Solution
NEXtreater
User Access
Consumables and Filters
Repair and Maintenance
Overall Vision
top related