JPA Designer
Solar Panel and Wind TurbinePayback Calculation Module
ISSUE FEBRUARY 2012
JPA TL Ltd.Newcastle Business Vil lage ,
33 Bell ingham Dr ive ,Nor th Tyneside Ind. Est. ,
Newcastle upon Tyne NE12 9SZ
T: 0191 270 5138E: sales@techlit .co.ukW: www.techlit .co.uk
Contents
Contents ii
1 IntroducingtheJPA Designerpaybackmodule 11.1 Quickstart . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2 Gettingstarted 32.1 Gettinghelp . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32.2 Systemrequirements . . . . . . . . . . . . . . . . . . . . . . . . . . 42.3 Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42.4 Userregistration . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52.5 On-linelicencechecking . . . . . . . . . . . . . . . . . . . . . . . 62.6 Updates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62.7 StartingJPA Designer . . . . . . . . . . . . . . . . . . . . . . . . . 72.8 UninstallingJPA Designer . . . . . . . . . . . . . . . . . . . . . . . 7
3 Managingprojectsandcalculations 83.1 Startinganewproject . . . . . . . . . . . . . . . . . . . . . . . . . 83.2 Addingprojectaddressdetails . . . . . . . . . . . . . . . . . . . . 93.3 Savingprojects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 103.4 Openingprojects . . . . . . . . . . . . . . . . . . . . . . . . . . . 103.5 Addingcalculationstoaproject . . . . . . . . . . . . . . . . . . . 113.6 Openingandclosingcalculations . . . . . . . . . . . . . . . . . . 113.7 Duplicatingcalculations . . . . . . . . . . . . . . . . . . . . . . . 113.8 Renamingcalculationsandprojects . . . . . . . . . . . . . . . . . 123.9 Deletingcalculations . . . . . . . . . . . . . . . . . . . . . . . . . 123.10 Programoptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
4 Paybackcalculations 144.1 Projectinformation . . . . . . . . . . . . . . . . . . . . . . . . . . 154.2 Solarpanelsandwindturbines . . . . . . . . . . . . . . . . . . . . 164.3 Paybackresults . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 184.4 Outputtingpaybackresults . . . . . . . . . . . . . . . . . . . . . . 19
ii
1 IntroducingtheJPA Designerpaybackmodule
Thismanualexplainshowtouse JPA Designer tocarryoutsolarpanelandwindturbinepaybackcalculationsfortheFeed-InTariff(FIT).
Thepaybackmodule in JPA Designeruse themethods inSAP 2009 todetermine theamountofelectricitygeneratedbyphotovoltaicpanelsandsmall-scalewindturbines1.
Themodulethenestimatesthepaybackperiodfortheinstallation, takingaccountof:
• theinitialcostoftheinstallationandtheinterestonanyloan;
• theincomefromthefeed-intariff;
• savingsonelectricitybills;
• incomefromsaleofelectricitytothegrid;
• generalinflation(whichaffectstheFIT rate)andenergypriceinflation.
TheQuickStart guideinthenextsectiontakesyouthroughthemainstepsininstallingtheprogramandcarryingoutabasicpaybackcalculation. Therestofthemanualcontainsin-depthinformationtohelpyougetthemostoutofthesoftware.
WehopeyoufindJPA Designerausefulcalculationtool. Wearealwayshappytoreceivecomments, suggestionsforimprovementsornewfeatures.
1.1 Quickstart
Thissectionguidesyouthroughthemainstepsofthepaybackcalculationandtellsyouwherecanfindmoreinformationoneachofthosestepslateroninthemanual.
Thefirstthingtodoistoinstallandregistertheprogram:
1. DownloadandinstallJPA Designer(see chapter 2).1ThegenerationfigurebasedonSAP 2009isanestimatedvalue. AstheMCS disclaimerstates: the
performanceofsolarPV systemsisimpossibletopredictwithcertaintyduetothevariabilityintheamountofsolarradiation(sunlight)fromlocationtolocationandfromyeartoyear. ThisestimateisbaedontheGovernment'sstandardassessmentprocedureforenergyratingofbuildings(SAP) andisgivenasguidanceonly. Itshouldnotbeconsideredasaguaranteeofperformance.
1
CHAPTER1. INTRODUCING THE JPA DESIGNER PAYBACK MODULE 2
2. SelectJPA Designerfromthe Start button(see section 2.7). Theprogramopens.
3. Onthetoolbarclick EditUser&SecurityCodes. Thisopensthe UserRegistrationdialoguebox(see section 2.4).
4. Inthe PV productdetails area, inthe Yourcompanyname box, entertheusernameyoureceivedinyourregistrationemail.
5. Nowcopythetwentycharactercodefromtheemailandpasteitintothetextboxnexttothe Apply buttons. Click ApplyPV keycode. ThecodeiscopiedintothePV keycode boxes. Click OK.
Nowyoucanstartapaybackcalculation:
1. Onthe Insert menu, click SolarPanel&WindTurbinepaybackcalculation.
2. Onthe Description dialogueboxclick OK.Theprogramaddsanewpaybackcal-culationtothelist, named SolarPayback1.
3. Inthe ProgramManager window, doubleclickon SolarPayback1. The Paybackwindowopens(see chapter 4).
4. Onthe Edit menu, click SolarPanel&WindTurbinedetails. The SolarPanel&WindTurbines dialogueboxopens(see section 4.2).
5. Inthe Photovoltaics section, onthefirstrow(row1)set
• PeakkW to 4.
• Pitch to 30º.
• Direction to South.
• Overshading to Noneorverylittle.
6. Inthe Costs section, setthe Totalinstalledcostsofsystem to10000.
7. Click OK.
8. The PaybackwindownowshowsthePV output, theincomeandsavingsfiguresandthepaybackperiod. The Paybackgraph andthe Electricitygeneration graphshowpaybackperiodsandmonthlygenerationfigures.
Andthat'sit: acompletedpaybackcalculation. Ifyouwantto, youcanprinttheresultsofthiscalculation(see section 4.4):
1. Onthetoolbar, click Print.
2. The Printpreview opens. Youcanmovethroughthepreviewusingthearrowkeysatthetopofthewindowtomovebetweenpagesandthescrollbartothesidetomoveupanddownthepages.
3. Whenyouaresatisfiedwiththeresults, clickthe Print button.
2 Gettingstarted
ThissectionofthemanualdescribeshowtoinstallJPA DesigneronyourPC andexplainshowtheuserregistrationandon-linelicencecheckingsystemswork. ItalsoincludesinstructionsonupdatingyourcopyofJPA Designer.
2.1 Gettinghelp
Thismanualusesthefollowingconventions:
• <angledbrackets> forkeysonthecomputerkeyboard, e.g. the <Enter> key.
• the + signindicatesyoushouldholddownonekeywhilepressinganother, e.g.<Alt+F> means‘holddownthe <Alt> keywhilepressingthe <F> key’.
• Boldtype indicatespartsofJPA Designer’sscreendisplays, e.g. the SolarPanelsandWindTurbines dialoguebox.
• Menu>option indicatestheoptioninthemenuontheprogram’smenubar, e.g. Se-lect Edit>Primaryheatingsystem means selectthe Primaryheatingsystem optionfromthe Edit menu.
Thismanualusesthefollowingspecialterms:
• dialoguebox: asmallwindowwhichdisplaysboxesorbuttonsforenteringdata.
• Optionbutton: asetofroundbuttons. Youcanonlyselectoneatatime.
• Tickbox: aboxwhichshowswhetherornotaparticularsettingison(ticked)oroff(notticked).
• Textbox: anareaonadialogueboxinwhichyoucantypewordsornumbers.
• List: aboxwhichcanbeexpandedtoshowanumberofpre-setoptions, usuallybyclickinganarrowontheright-handsideofthebox.
Ifyouhaveaproblemwiththe functioning ofthesoftwarepleasefollowthesesteps:
• Downloadand install the latestversionof JPA Designer fromourwebsite (sec-tion 2.3 forinstructions)andseeifthatresolvestheproblem.
3
CHAPTER2. GETTING STARTED 4
• ChecktheforumandFAQ onourwebsite(http://forum.techlit.co.uk)toseeiftheproblemisaddressedthere.
• Iftheproblempersists, emaildetailsoftheproblemto support@techlit.co.uk. PleaseincludedetailsofyourcomputersystemandattachsamplefilesorPDF outputswherepossible. Wewillrespondassoonaswecan.
2.2 Systemrequirements
JPA Designer requires a PC runningWindows XP or later. JPA Designer can run onIntel-basedAppleMacintoshcomputersusingvirtualisationsoftware(suchasParallelsorVMWare), orthroughBootcamp. However, wedonotguaranteetheprogramwillrunonsuchsystems, nordoweoffertechnicalsupport.
The computermust have an internet connection to enable theprogram to check thevalidityofyourlicencewheneveritstarts.
2.3 Installation
ToinstallJPA DesigneronyourPC:
1. Gotoourwebsiteatwww.techlit.co.ukandrightclickonDownloadJPA Designer:select Savelinkas (forFirefox)or Savetargetas (forInternetExplorer).
2. Downloadtheinstallerfile jsetup990.exe toyourPC (werecommenddownloadingthefiletotheDesktop). Thedownloadisabout12MB.
3. Doubleclickonthefile jsetup990.exe. AfterafewmomentstheInstallShieldWiz-ardopens.
Youmayseeasecuritywarningthatthepublisherofthefilecouldnotbeidentified.Ifyoudo, click Run tocontinuetheinstallationprocess.
4. Click Next tocontinuewithinstallation. Theinstallerdisplaysthe LicenceAgree-ment. Tocontinuewith the installationclick I accept the termsof the licenceagreement, thenclick Next.
5. Atthe Customerinformation screenenteryournameandcompanyname. UsetheoptionsbuttonstoselectwhetheryouwantJPA Designertobeavailabletoalluseraccountsonthecomputer, orjustone. (Werecommendyouselect all.) ClickNext.
6. Atthe ChooseDestinationLocation screenwerecommendyouacceptthedefaultsettingsandinstallJPA Designerintothefolder c:\programfiles\jpatl\jpadesigner981. Click Next. The installerwillnowcopy the JPA Designerfilesontoyourcomputer.
7. Wheninstallationhasfinishedthe SetupComplete screenisdisplayed. Tick Launchtheprogram andclick Finish. Theinstallerwillcloseand JPA Designer willopen,showingyouthe ProjectManager window.
CHAPTER2. GETTING STARTED 5
Figure 2.1: TheEditUser&securitycodesbutton
Figure 2.2: TheUserRegistrationdialoguebox
2.4 Userregistration
WhenyoufirstinstallJPA Designertheprogramrunsin demonstrationmode anddoesnotdisplaytheresultsofcalculations. Youmustunlocktheprogramwithyourkeycodetoaccessthefullfunctionalityofthesoftware.
Toenterthekeycodefora PV andWindTurbines licence:
1. Onthetoolbar, click User&securitycodes (Figure 2.1).
2. Copytheusernamefromtheregistrationemail. Inthe PV productdetails area,pastetheusernameinthe Yourcompanyname box. (Figure 2.2).
3. Copythe keycode fromtheregistrationemailandpasteitintotheboxatthebottomofthe UserRegistration dialoguebox.
CHAPTER2. GETTING STARTED 6
4. Click ApplyPV keycode. Theprogramwillnowpastethecodeintothe U-valuekeycode boxes.
5. Click OK.Thesoftwareisnowunlocked
2.5 On-linelicencechecking
JPA Designerwilltrytocheckthethevalidityofyourlicenceagainstouron-linelicensingdatabasethefirsttimeyouopenaPV calculationafterstartingtheprogram.
• Ifthecheckissuccessfulandthelicenceisvalidthemodulewillopen(theprogramwillrecordthedateandtimeofthatsuccessfulcheck).
• Ifthecheckissuccessfulandthelicenceisnotvalidthecalculationwillnotopen.
• Iftheprogramisunabletoconnectwiththedatabase(forexample, becauseyouareusingyour lap-topaway fromyouroffice) itwill lookat thedateof the lastsuccessfulcheck: ifthatislessthansevendaysagothenitwillopenthemodule.
• Iftheprogramisunabletoconnectwiththedatabaseandthelastsuccessfulcheckismorethansevendaysagothenitwill not openthemodule.
IfyouoftenuseJPA Designerawayfromtheofficeyoucanusethe Checklicenceon-linebuttononthetoolbarwillforcealicencecheckandre-setthetimesincethelastchecktozero. Youshouldforceacheckifyouexpectnottohaveaninternetconnectionforafewdays.
2.6 Updates
JPA Designeriscontinuallybeingdevelopedtointroducenewfeatures: togetthebestfrom theprogram it isworthmaking sureyouareusing the latest version. Tocheckwhetherthereisalaterversionavailableyoushouldcomparetheversionnumbershownonourwebsite(www.techlit.co.uk)withthatoftheprogramyouareusing. Onthe Helpmenu, click About toseetheversionnumber.Highernumbersandlettersindicatelaterreleases, withcharacterscomingearlierinthenamebeingmoreimportantthatlaterones: so4.05a1willbemorerecentthan4.04c2,and4.05b1morerecentthan4.04a4. Thethreedigit Build numberindicatesaminorchangeinaversion. Figure 2.3 showsthe About messageforJPA Designertogetherwiththeversionnumberonthewebsite: inthiscasethesoftwareisuptodate, asbothversionnumbersarethesame.Theprocessforupdatingthesoftwareisidenticaltothatoforiginallyinstallingit, butwiththeadditionalstepof uninstalling yourcurrentversionofJPA Designerbeforeinstallingthenewversion.ToupdateJPA Designer:
1. UsetheWindows Add/RemovePrograms or Uninstallprograms controlpaneltouninstallthecurrentversionofJPA Designer.
Uninstallingthecurrentversionwillnotaffectyourcalculationfiles.
2. DownloadandinstallthenewversionofJPA Designerfollowingtheinstructionsinsection 2.3.
CHAPTER2. GETTING STARTED 7
Figure 2.3: TheversionnumberintheAboutdialogueboxshownoverthewebsite
2.7 StartingJPA Designer
TostartJPA Designer:
• Click Start, andthenpoint to Allprograms. Click JPA Designer, thenclick JPADesignerEPC SAP 9.81.
TocloseJPA Designer:
• Onthe File menu, click Exit. Theprogramwillpromptyoutocloseanyfileswhichhavenotbeensaved.
2.8 UninstallingJPA Designer
TouninstallJPA Designer:
1. Click Start, thenclick ControlPanel.
2. InControlPanel, double-click Uninstallaprogram.
3. Inthelistofprograms, double-click JPA Designer.
4. Atthemessage AreyousureyouwanttouninstallJPA Designer9.90, click Yes.
5. Theprogramisuninstalled.
ThatwillnotremoveanyJPA Designerprojectfiles.
3 Managingprojectsandcalculations
Figure 3.1: TheProjectManagerwindowshowthecalculationsinaproject
JPA Designerorganisesandsavescalculationsinprojectfiles, whichhavetheextensionJDP.YoucansaveanumberofPV calculationsinthesamefile.
Youcancreate, saveandmanagecalculationsintheJPA Designer ProjectManager win-dow(Figure 3.1), whichlistsallthecalculationsinthecurrentproject.
3.1 Startinganewproject
WheneveryoustartJPA Designertheprogramcreatesanewblankprojectwhichyoucanstartusingstraightaway. Youcanalsocreateanewprojectatanytime.
Tocreateanewproject:
• Onthe File menu, click NewProject.
Youcanchangethedefaultprojectname A blankproject tosomethingmoreuseful:
1. Clickontheprojectname, thenonthe Edit menuclick Renameselecteditem.
2. Inthe Projectname dialoguebox(Figure 3.6)typethenewnameforyourproject.
Theprojectnamedoesnotaffectthecalculationsinanyway.
8
CHAPTER3. MANAGING PROJECTS AND CALCULATIONS 9
Figure 3.2: Changingthenameofaproject
3.2 Addingprojectaddressdetails
JPA Designercanstoreclientandsitedetailsforaproject, whichyoucanthencopytoalltheindividualcalculationswithinthatproject. Youcanenterandeditthatinformationusingthe ProjectAddress dialoguebox(Figure 3.3). Youcanalsosaveclientinformationtoreuseitlater.
Figure 3.3: TheProjectAddressdialoguebox
Toaddorchangeprojectinformation:
1. Onthe Edit menu, click ProjectAddress.
2. Inthe ProjectAddress dialoguebox, enterthedatabytypingitintotheappropriateboxes. Usethe <Tab> keytomovebetweenboxes.
Donot try toenterdata in thetop lefthandbox: thisbox isusedforretrievingdetailsyouhavepreviouslystored.
3. Ifyouwanttostoretheclientdetailstore-uselater, click Addtoclients.
CHAPTER3. MANAGING PROJECTS AND CALCULATIONS 10
Tore-useexistingclientdatasimplyclickonthedrop-downinthe Projectinformationdialogueboxandselectaclientfromthelist(Figure 3.4).
Ifyouneedtoeditthestoreddetailsclick Editclientslist thenmakethechangesintheEditClients dialoguebox.
Figure 3.4: Theclientnameandaddressdrop-down
3.3 Savingprojects
JPA Designerprojectaresavedinthesamewayasanyotherfile:
1. Onthe File menu, click SaveProject.
2. In the SaveAs dialoguebox, select the folder intowhich theproject shouldbesaved. Enteranamefortheprojectfile.
BydefaultJPA Designerwilladdtheextension JDP toallfilenames.
3. Click Save. JPADesignersavestheprojectanddisplaysthefilenameontheprogramtitlebar.
BydefaultJPA DesignerwillsavefilesintotheJPA Designerfolder(usually c:\ProgramFiles\JPATL\JPA Designer981). Youcanspecifyadifferentdefaultfolderusingthe Op-tions dialoguebox(see section 3.10).
Werecommendyouhaveadailyback-upscheduleforyourdata.
3.4 Openingprojects
Toopenanexistingproject:
1. Fromthe File menu, click Openproject.
2. Inthe Open dialoguebox, clickthefileyouwanttoworkwith. Click Open.
3. Theprojectopensinthe ProjectManager window.
CHAPTER3. MANAGING PROJECTS AND CALCULATIONS 11
Figure 3.5: TheDescriptiondialoguebox
3.5 Addingcalculationstoaproject
YoucanaddnewPV calculationstoaprojectinthe ProjectManager window.
ToaddanewU-valuecalculationtoaproject:
1. Onthe Insert menu, click SolarPanel&WindTurbinepaybackcalculation.
2. In Description dialoguebox(Figure 3.5)typeanameforthecalculation, e.g. 23NewRow.
3. Thenewcalculationisaddedtotheproject.
3.6 Openingandclosingcalculations
Toopenanexistingpaybackcalculationinthe ProjectManager window, either:
• double-clickonthecalculationname; or,
• clickonthecalculationname, thenonthe Edit menu, click Editselecteditem.
Tocloseacalculationandreturntothe Projectmanager window, onthetoolbar, clickProjectmanager.
3.7 Duplicatingcalculations
Ifyouwanttoprepareacalculationwhichisverysimilartoanexistingcalculationinaprojectyoucanduplicatethecalculationandthenmakeyourchangesto thecopy,withoutaffectingtheoriginalcalculation. Toduplicateacalculation:
1. Inthe ProjectManager windowclickonthecalculation.
2. On the Edit menu, select Edit>Duplicate item. The Description dialogue boxopens.
3. Typeanamefortheduplicatecalculation.
4. A copyoftheoriginalcalculationisaddedtotheproject. Youcannowworkwiththeduplicatecalculationintheusualwaywithoutalteringtheoriginal.
CHAPTER3. MANAGING PROJECTS AND CALCULATIONS 12
3.8 Renamingcalculationsandprojects
Tochangethenameofacalculation:
1. Inthe ProjectManager windowclickonthecalculation.
2. Onthe Edit menu, click Renameselecteditem.
3. Inthe Name dialoguebox, enteranewnameforthecalculation.
4. The ProjectManager windowshowsthenewname.
Figure 3.6: Changingthenameofaproject
Youcanchange thedefaultproject title A blankproject to somethingmoreuseful inexactlythesameway.
Changingthenameofacalculationorprojectwillnotaffectthecalculationresults.
3.9 Deletingcalculations
YoucandeletecalculationsfromJPA Designerprojects.
WARNING:thereisnowayofrecoveringadeletedcalculation.
Todeleteacalculation:
1. Inthe ProjectManager windowclickonthecalculation.
2. Onthe Edit menu, click Deleteselecteditem.
3. At theconfirmationmessage Areyousureyouwanttodeletetheselecteditem,click Yes.
4. Thecalculationisremovedfromtheproject.
CHAPTER3. MANAGING PROJECTS AND CALCULATIONS 13
3.10 Programoptions
YoucancustomisetheperformanceandoutputsofJPA Designerinmanyways. Mostoftheoptionsarecontrolledfromthe Options dialoguebox.
Toopenthe Options dialoguebox:
• Clickthe Options menu.
The Options dialogueboxboxhasfourtabs:
General:
• Printermargins: changesthepagemarginsforprinting.
Ifyouareusingheadedpaperyoucansetthetopmarginforthefirstpagetobegreaterthanthatofthesecondpage, whichcanbeprintedoncontinuationpaperorblankpaper.
• Companynameandaddress: thedetailsyouenterhereareusedonprint-outsofpaybackcalculations.
• Options: usethesecheckboxestoselectwhichitemswhichshouldappearontheprint-outsandtomakeback-upcopiesofJDP projectfiles.
• Start-upfolder: setsthedefaultfolderforsavingandopeningprojectfiles.
• Checkforprogrammeupdates: letsyouspecifywhetherornotthesoftwarewillcheckforupdatedversionsofJPA Designer. Formoreinformationsee section 2.6.
Theotheritemsonthistabdonotaffectpaybackcalculations.
Logoandsignature:
• Logoposition: youcanincludeyourcompanylogoonprint-outs. Usethesesettingstodeterminethepositionofthelogo. Thelogofilemustbea256colourbitmapwiththefileextensionBMP,anditmustbeintheJPA Designerfolder. Enterthenameofthefileinthetextbox, butdonotincludethepath(e.g. enter logo.bmpnot c:\Programfiles\JPATL\JPA Designer981\logo.bmp).
• Addressposition: ThesesettingsdeterminethepositionofyourcompanyaddressonprintoutsandPDFs. Entertheaddressitselfinthe General tab.
Youcanignorethe Certificatesignatureposition andthe TIMSA logoposition options:theydonotaffectpaybackcalculations.
Email:
Therearenooptionsforpaybackcalculationsonthistab.
Other:
Therearenooptionsforpaybackcalculationsonthistab.
4 Paybackcalculations
Figure 4.1: ThePaybackwindow
Paybackcalculationsarecarriedoutfromthe Payback window(Figure 4.1), whichcon-sistsof:
14
CHAPTER4. PAYBACK CALCULATIONS 15
1. The Menu.
2. The Toolbar.
3. Theresultssummary.
4. Thepaybackandgenerationgraphs.
Therearefivemainstepstocarryingoutapaybackcalculation:
1. Createandopenanewpaybackcalculation(see section 3.5 and section 3.6).
2. Settheprojectinformation(section 4.1).
3. EnterthePV panelandturbinedata, togetherwiththefinancialassumptions(sec-tion 4.2).
4. Reviewtheresults(section 4.3). Ifnecessaryyoucanrevisethe
5. Printtheresults(section 4.4).
4.1 Projectinformation
Youcanenterclientandlocationdetailsfortheprojectwhichwillappearonthepay-backcalculationprint-outs.
Toaddclientandlocationdetails:
1. Onthe Edit menu, click ProjectInformation.
2. Inthe ProjectInformation dialogueboxenterclientandprojectdetailsbytypingitintotheappropriateboxes. Usethe <Tab> keytomovebetweenboxes.
Alternatively, youcancopyclientandprojectdetailswhichyouenteredinthe ProjectInformation dialogueboxinthe ProjectManager window.
TocopyclientandprojectdetailsfromProjectManager:
1. Onthe Edit menu, click ProjectInformation.
2. Inthe ProjectInformation dialoguebox, click Inherit. Anyinformationyouenteredin ProjectManager iscopiedtothe ProjectInformation dialoguebox.
CHAPTER4. PAYBACK CALCULATIONS 16
Figure 4.2: TheSolarPanels&WindTurbinesdialoguebox
4.2 Solarpanelsandwindturbines
Theinputdata for thephotovoltaicpanelsandwindturbinesareenteredin the SolarPanels&WindTurbines dialoguebox.
Toopenthedialoguebox:
• onthetoolbar, click SolarPanel&WindTurbinedetails: or,
• onthe Edit menuclick SolarPanel&WindTurbinedetails.
The SolarPanels&WindTurbines dialoguebox(Figure 4.2)hasthreesections:
• Photovoltaics;
• Microwindturbines;
• Costs.
Atthebottomofthedialogueboxarethreebuttons:
• Toaccepttheinputdataandclosethedialoguebox, click OK.
CHAPTER4. PAYBACK CALCULATIONS 17
• Toacceptalltheinputdatainthedialogueboxbutkeepsthedialogueboxopen,click Apply. Thismakes iteasy toseehowchanges to the inputdataaffect thecalculationresultsandthenmakefurtherchanges.
• Todiscard the inputdata in thedialogueboxandclose thedialoguebox, clickCancel.
Photovoltaics
Toassessthebenefitsofinstallingphotovoltaicpanelsonthedwellingyoumustenterthefollowdataaboutthepanels:
• The PeakkW ofthesystem, whichyoucancalculatebymultiplyingthepeakkWoftheindividualpanelsbythenumberofpanels.
• The Pitch ofthepanels.
• The Direction whichthepanelsface.
• Theamountof Overshading fromtreesoradjacentbuildings.
Youcanspecifytwodifferentphotovoltaicinstallationsforthesamedwelling, toallowforsituationswherepanelsareinstalledondifferentroofslopes.
Windturbines
Toassessthebenefitsofinstallingoneormorewindturbinesonthedwellingorwithinitscurtilage1 youmustenterthefollowingdataabouttheturbines:
• the Numberofturbines.
• the Rotordiameter, measuredinmetres.
• thetypeof terrainwhichsurroundsthedwelling, whichwillbeeitherDenseurban,Lowriseurban/suburban or rural.
• the height ofthehuboftheturbineabovetheridgeoftheroof, inmetres.
Costs
Toassesstheoverallcostsandbenefitsofthepanelsand/orturbinesyoumustcompletethe Costs areaofthedialoguebox. Thefirstrowisforthecostoftheinstallation:
• Totalinstalledcosts: howmuchwillthephotovoltaicpanelsandturbinescosttoinstall.
• Interestrateonloan: iftheclientwillbetakingoutaloantopayfortheinstallationentertheinterestratehere. Ifthereisnoloanleavethisboxatzero.
1Anareaoflandattachedtoahouseandformingoneenclosurewithit.
CHAPTER4. PAYBACK CALCULATIONS 18
• Interestadded: determinesiftheinterestontheloanisaddedona yearly ormonthlybasis. Addinginterestonamonthlybasiswillincreasethepaybackperiod.
Therestofthe Costs sectionisforthedatausedinthepaybackcalculation:
• Assessmentperiod: thelengthoftimeoftheassessment, inyears. Thisisgenerallysetat25years, whichisthedurationofthefeed-intariff.
• Unitpriceofelectricity: thepriceinpenceperkWhatthetimeofcalculation.
• Exporttariff: theamountpaidbytheelectricitysupplierforenergygeneratedbythesystemandexportedtothegrid, inpenceperkWh.
• Feed-intariff: theamountpaidbygovernmentforeachunitofelectricitygeneratedbythesystem, whetherusedwithinthedwellingorexported, inpenceperkWh.
• The percentageofgenerationusedwithinthedwelling. Electricitygeneratedandusedwithinthedwellingreducestheuseofgridelectricity. Electricitygeneratedbutexportedonlyattractsthelowergenerationpayment. Consequently, thegreatertheproportionofelectricityusedwithinthedwelling, themorebenefitisderivedfromthepanelsorturbines.
• Paneldegradation: thisrepresentsthelossofperformanceofthesolarpanelsovertheassessmentperiod. A commonpresumptionisthatattheendofathirtyyearperiodthepanelswillhaveonly80%oftheirinitialperformance.
• Systemlosses: aproportionoftheelectricitygeneratedislostthroughconversionfromthedirectcurrent(DC) producedbythepanelstoalternatingcurrent(AC) usedwithinthedwellingandbythegrid. 20%isacommonlyusedproportion.
• Inflationrate: theannualrateofinflation, whichisusedtoadjustthefeed-intariffrate, generallysetat4%.
• Energyinflationrate: theannualrateofinflationforenergycosts, whichisusedtoadjusttheunitpriceofelectricitywhendeterminingsavings, generallysetat9%.
YoucanchangethedefaultvaluesbuiltintotheprogrambysettingtheitemsfromtheAssessmentperiod tothe Energyinflationrate tothevaluesyouwanttousethenclickingSetasdefaults. Thenexttimeyoustartacalculationtheprogramwillshowyourvalues.
4.3 Paybackresults
Onceyouhaveenteredthepanel, turbineandfinancialdata, JPA Designershowstheestimatedelectricaloutputofthesystemandthefinancialreturns. Theresultssummary(section3ofthe Payback windowin Figure 4.1), shows:
• theannualelectricaloutputofanywindturbines;
• theannualelectricaloutputofanyPV panels;
• thetotalannualelectricaloutputofthesystem;
CHAPTER4. PAYBACK CALCULATIONS 19
• theinstalledcostofthesystem;
• theestimatedpaybackperiodinyearsandmonths.
Therighthandsideoftheresultssummaryshowsthebenefitofgenerationforsingleyearduringtheassessment. Youcansettheyearusingthe Year slider, andtheprogramshows:
• the Feed-InTariffincome fromalltheelectricitygenerated;
• the incomefromexportedelectricity, thatis, electricitygeneratedbythesystembutnotusedwithinthedwelling);
• the electricitysavingwhichcomesfromusinggeneratedelectricityinthedwelling;
• the totalbenefit whichisthesumofthosethreeitems.
Asyoumovetheslidertherightandviewlateryearsyouwillseetheannualincomeandbenefitsincreaseasaresultofgeneralinflationandenergycostinflation.
Belowthenumericalresultsaretwographs:
• the Payback graphshowsthecumulativebenefitofthesystemovertheassessmentperiod. Thepaybacklinestartsatanegativenumber, whichistheinstallationcost.Thepointatwhichthepaybacklinecrosseszeroonthey-axisisthebreak-evenpoint.
• the Electricitygeneration graphshowstheamountofelectricitygeneratedforeachmonthoftheyear.
Youcanswitchbetweengraphsbyclickingthe Payback and Electricitygeneration tabs.
4.4 Outputtingpaybackresults
Youcanprinttheresultsofpaybackcalculationsinordertogivethemtoapotentialclient.
Toprintresults:
1. Onthetoolbar, clickthe Print button.
2. The PrintPreview windowopens, showingadraftqualitypreviewoftheprint-out.Usethethescrollbarontherighttomoveupanddownindividualpages, andthearrowbuttonsatthetopleftofthewindowtomovebetweenpages.
3. Ifyouarehappywiththepreviewclick Print.
Theprint-outconsistsofthreepages:
• Page1: Summarisestheinputsandresults(anexampleisshownin Figure 4.3):
1. Yourlogoandaddressdetails.
2. Theclientandprojectdetails.
CHAPTER4. PAYBACK CALCULATIONS 20
Figure 4.3: Thefirstpageofthepaybackprint-out
CHAPTER4. PAYBACK CALCULATIONS 21
3. Theresultssummary, includingthepaybackperiod.
4. Theinputdata, includingthefinancialassumptions.
5. ThePV andwindturbinedisclaimersrequiredbytheMCS.
• Page2showstheelectricitygenerationgraph.
• Page3showsthepaybackgraph.
Youcancustomiseprintoutsbyaddingyourcontactdetailsandacompanylogo: thisisexplainedin section 3.10. Youcanalsochangethefontusedontheprintout: ontheFile menu, click Font andmakethechangesinthe Font dialoguebox.