jd edwards enterpriseone · pdf filejd edwards enterpriseone manage manufacturing orders...
Post on 19-Mar-2018
279 Views
Preview:
TRANSCRIPT
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne Production
Operations
Supplier
Manufacturing
Accounting
Quality
Management
Production
Sales and
Operations
Planning
Detailed
Production
Planning and
Scheduling
Production
Method?
Manage Demand
Flow
Manufacturing
Manage Shop
Floor
Analyze
Production
Enhancement in
Manage Quality
Manufacturing
Order/Rate Schedule
Released
Demand Flow Manufacturing
Configure to Order; Process;
Discrete; Repetitive; Blend
Account for
Manufacturing
Activity
Supplier - Outside
Process
Outside
Operation
Parts
Returned
From
Supplier
Engineer to Order
(ETO)
PMPN
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne L2 Detailed Production Planning and Scheduling
Operations
Production
Sales and
Operations
Planning
Scheduling
Mode?
Manage Rate
Schedules
Manage
Manufacturing
Orders
Manage Items with
Kanban
Manufacturing
Order
Kanban
Repetitive
Manufacturing
Accounting and
Finance Data
Unaccounted
Transaction
Data
Validate
Resources
Availability?
Manage Materials
for Order
Manage Shop
Resources
Release
Manufacturing
Order/Rate
Schedule
Yes
No
Yes
Production
Method?
Manufacturing
Order/Rate
Schedule Released
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne Manage Rate Schedules
Production
Scheduling
Mode?
Create Rate
Schedule
Repetitive
Select Rate
Schedule
Option to
Review?
Review Parts/
Ingredients List
Review Routing/
Process
Review Co/By -
Products Mix
Validate Rate
Schedule
Continue with
Rate Schedule
Processing
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne Manage Manufacturing Orders
Production
Create Work Order
and Export
Convert Work
Order Header to
Flat File
Errors in Flat
File?
Run Inbound Work
Order Header Edit/
Update
Edit Work Order
Header Flat File
Purge Work Order
Header Batch FileNo
Yes
Create
Manufacturing
Order
Decision to Create Manufacturing Order
(from Manage Scheduling Issues in
Prepare Production Plan..)
Manufacturing
Supplies and
Demand
Create
Manufacturing
Order for
Prototype
Scheduling
Mode?
Manufacturing Orders Created
From Planning Process
Manufacturing Order Created from
Sales Order Entry
Recommended Changes to
Manufacturing Orders
"Prototype Manufacturing Order"
"Rework Order Created (from Disposition
Discrepant Material in Procure to Pay)"
Manufacturing Order
“Work Order Imported”
Validate
Manufacturing
Order?
Review
Manufacturing
Order Header
Yes
No
“Order
Scheduled”
Select Mode to
Process?
Process
Manufacturing
Order by Batch
Batch
Process
Manufacturing
Order Interactively
Interactive
Procurement
Supplies
Manufacturing
Accounting and
Finance Data
Purchase Order for
Outside Process
Order
Variance
File
Unaccounted
Material
Issues – Preflush
Items
"Order Processed"
Purchase Order for
Outside Process
Order Variance File
"Order Processed"
Exported Work
Order DataExtract To Finite
Scheduling System
What
Outbound
Tasks?
Item Balance
Extraction
WO Operation
Status Extraction
WO Extraction
WO Enquiry
Review
Required?
Review Parts/
Ingredients List
Review Routing/
Process
Review Co/By-
Products Mix
Select
Manufacturing
Order to Review
Review
Required
"Co/By Products
Selected"
"Routing/Process
Selected"
"Parts/Ingredients
List Selected"
Update
Manufacturing
Order Status
Was Review
Mandatory?
“Primary
Adjustments
Complete”
Yes
Review Not
Required
No
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne Manage Items with Kanban
Production
Scheduling
Mode?
Monitor
Inventory
Replenishment
Required?
“Inventory
Level
Checked”No
Kanban –
Consumption
Processing
Kanban Source
Type?
Create Sales
Order for
Components/
Ingredients
Release
Procurement
Requirement
For Assembly/
Intermediate
Send Assembly/
Intermediate to
Supplier
Receive
Assembly/
Intermediate
from Supplier
Outsourced
Production
Release
Procurement
Requirement
Purchase Order
Receive Items/
Ingredients from
Supplier
Move Inventory
to Consuming
Location
Inventory
Release Work
Order/Rate
Schedule
Manufacture
Kanban's
Replenishment
Work Center
Kanban – Supply
Processing
"Kanban Ready For Completion/Check In"
Phase Type?
Check In Kanban
Complete Kanban
Phase Type 2
Phase Type 1
Item Source
Type?
Item Source
Type?
Source Type 1 Completion and Transfer Created
Source Type 2 Inventory Transferred
Source Type 3;No Pay on Consumption Receive and Transfer Created
Source Type 4
Source Type 3;Pay on Consumption with Receipts Routing
Source Type 3;Pay on Consumption; No Receipts Routing
Ship Confirm Components + Receive Assembly +Transfer
Item Enters Receipt Routing
No Inventory Transactions Created
Source Type 4
Source Type 3
Ship Confirm Components + Receive Assembly
Source Type 1 Completion Created
Order Receipt CreatedCheck in Two
Phase Kanban
"Actual Data
Summarized"
"Items Received Into
Replenishment Location and
Transferred To Consuming Location"
Manufacturing
Accounting and
Finance Data
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne Manage Materials for Order
Production
Select
Appropriate
Adjustments?
Validate
Resource
Availability?
Review Part
Availability?
Yes
Material
Review Part
Availability
Yes
NoRun Shortage
Report?
Run Shortage
Report
Yes
Analyze
Material StorageNo
Shortage
Prevents
Manufacturing
Order/Rate
Schedule
Start?
Order or
Schedule?
Release
Manufacturing
Order/Rate
Schedule to
Start
No
Yes
Select
Manufacturing
Order to Adjust
Manufacturing
Order
Use Substitute
Items/Ingredients
on Parts List
Use Alternative Bill
of Material/
Ingredients List
Use Alternative
Location/Lot
Manage Shop
Resources
Expedite Items/
Ingredients
Select Rate
Schedule to Adjust
Rate Schedule Change Rate
Schedule Quantity
or Dates
Change
Manufacturing
Order Quantity or
Dates
Related Sales
Order Exists?
Set Sales Order
Hold Code
Notify Person
Consuming Part
Notify Master
Scheduler of
Schedule/
Quantity
Changes
Yes
No
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne Manage Shop Resources
Production
Manage Materials
for Order
Validate
Resources
Availability?
Yes
Rate Schedule
or
Manufacturing
Order?
Review Line
Schedule
Workbench
Rate
Schedule
Corrective
Action
Required?
Select Rate
Option to
Adjust?
Adjust
Capacity
Required
Re-sequence Jobs
Split/Change Lines
Move to an
Alternate Line
Change Rate
Schedule Quantity
or Dates
Review Dispatch
List
Corrective
Action
Required?
Select Order to
Adjust?
Adjust
Capacity
Required
Revise Operation
Start and Due
Dates
Move Routing to
Alternate Work
Center
Attach Alternate
Routing to
Manufacturing
Order
Change
Manufacturing
Order Quantity or
Dates
Manufacturing
Order
Related Sales
Order Exists?
Set Sales Order
Hold CodeYes
No
Increase/
Decrease
Capacity
Select Method
of Adjustment
Adjust
Capacity
Available
Adjust
Capacity
Available
Revise Line/Cell
Standard Capacity
Revise Work
Center Resource
Units
Refresh Resource
Units
Run Capacity
Requirements
Planning
No
Action
Required
No
Action
Required
Continue
Managing
Resources?
Is Plan Viable?
Further
Adjustment
Possible?
Notify Master
Scheduler of
Schedule
Quantity
Changes
Release
Manufacturing
Order/Rate
Schedule
Shortages
Reviewed
Schedule/Quantity
Changed
No
No
Yes
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne Release Manufacturing Order or Rate Schedule
Production
Print and Release
Work Order
Documentation
Manage Shop
Resources
Validate
Resources
Availability?
No
Create Manual
Shop Schedule
Collate/
Separate Shop
Paperwork
Communicate
Shop Schedule
No Documentation Required
Production
Method?
Manufacturing
Order/Rate Schedule
Released
Print Dispatch List
Print and Release
Pick List
Create
ADVANCED
WAREHOUSE
MANAGEMENT
Pick Request
Warehouse Pick
Requests and
Suggestions
Pick Request For Manufacturing
Pick List for Manufacturing
Print Shortage
Report
Print Shop Packet
Summary
Manufacturing
Order Header
Specifications
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne L2 Manage Demand Flow Manufacturing
Production
Production
Method?
Set up Base Data
for Demand Flow
Manufacturing
Design Demand
Flow
Manufacturing
Line
Manage Kanban in
Demand Flow
Manufacturing
Environment
Plan Resources
Perform Daily
Planning and
Sequencing
Bring Line Live
Manage Shop
Floor
Demand Flow
Manufacturing
Plan Resources and
Simulate Utilization
Based on Daily Rate
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne Set up Base Data for Demand Flow Manufacturing
Production
Manage Kanban in
Demand Flow
Manufacturing
Environment
Perform Daily
Planning and
Sequencing
Plan Resources
Design Demand
Flow
Manufacturing
Line
Setup Labor and
Machine
Resources for
Scenario
Setup Employee
Records for DFM
Setup Supplier
Records for DFM
Setup Customer
Records for DFM
Synchronize Item
RoutingAdd Bill of Material
Associate Work
Day Calendar with
Resource
Enter Sales Order
Lines
Production
Method?
Setup Scenarios,
and Define Active
Scenario, Line
Design and
Planning
Demand
Flow
Manufacturing
Associate Work
Day Calendar with
a Scenario
Associate Active
Scenario with
Default User
Integrated with
EnterpriseOne
Execution
System?
Define Standard
Unit of Measure
Conversions for
Scenario
Setup Branch
Specific
Information
Identify Item
Information
Define
Configurations for
Data Movement
Manage
Configuration
Details
Execute DFM Data
Import Export
Program
Setup Item
Specific Unit of
Measure
Conversion within
Scenario
No, Setup Data in
DFM System
Yes, Import Data
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne Design Demand Flow Manufacturing Line
Production
Define Product
Synchronizatio
n or Sequence
of Events?
Define Processes
Required for
Setting up a Line
Design and
Properties
Product
Synchronizations
Define Feeder
Paths, Option
Paths or
Rework Paths?
Define Feeder
Paths
Use Graphical
Tool to
Concatenate
Processes into
Feeder Path
Review and Edit
Feeder Paths in
Tabular Format
Select Feeder
Path or Define
New Feeder Path
Feeder
Path
Define Option
Paths
Use Graphical
Tool to
Concatenate
Processes into
Option Path
Review and Edit
Option Paths in
Tabular Format
Select Option Path
or Define New
Option Path
Define Rework
Paths
Use Graphical
Tool to
Concatenate
Processes and
Paths into Rework
Path
Review and Edit
Rework Paths in
Tabular Format
Select Rework
Path or Define
New Rework Path
Option
Path
Rework
Path
No
Setup Product
Synchronizations
Define?Source of
Events (SOE)
Define Standard
Tasks
Standard
Tasks
Define Standard
Sequence of
Events (Optional)
Add Tasks to
Standard
Sequence of
Events
Print Standard
Sequence of
Events
Define Sequence
of Events
Add Tasks to
Sequence of
Events (Manually,
Copy Existing,
Copy Standard)
Print Sequence of
EventsSequence of Events
Standard Sequence of
Events (SSOE)
Assign Consumed
Components to
Task Based on
MBOM
Define in
Graphical or
Tabular
Format?
Use Graphical
Tool to
Concatenate
Processes and
Paths into Product
Synchronization
Use Tabular Tool
to Concatenate
Processes and
Paths into Product
Synchronization
Tabular
Graphical
Calculate
Planned
Throughout,
Output, and
Scrap Percents
for Each
Process
Define or Override
the Specific Yield,
Rework, Scrap
Percentage of
Process for the
Path
Print Table Listing
Processes
Included in
Product
Synchronization
Enter Planned Volumes,
Extend Independent
Demand, Calculate
Dependent Demand, and
Assign Product
Synchronization
Define Process
Map and
Associate with
Volume Design
Setup Process
Maps and Derive
Work Content
Define New
Volume Design by
Determining
Volume for Mixed
Model Family
Create Volume
Design?
Yes
No
Create Mixed
Model Family
Definition and
Associate with
Branch/Plant
Set Up Base Data
for Demand Flow
Manufacturing
Action to Take? Define Process Maps
Process Maps
Based on
Actual Times?
Enter Resources
and Resource
Time for Labor and
Machine
Resources
Yes
Break up
Processes into
Cells to
Accommodate
Multiple Products
with Different
Processing Times
No
Define Names for
Cells and
Associated Work
Center with Cell
Action to Take?
Review Which
Products Share
Common
Processes
Review Labor and
Machine Times for
Each Product and
Process
Export Line Design
Data, Step 1
Augment Line
Design for Execution
Setup Line for Line
Design Creation
Manage Kanban in
Demand Flow
Manufacturing
Environment
Perform Daily
Planning and
Sequencing
Plan Resources
Export Line Design
Data, Step 2
Add Line Design
and Calculate Tact
Time, Actual Time
Weighted and
Number of
Calculate Total
Product Cycle
Time
Setup and
Calculate
Operational
Definition
Calculate and Maintain Operational Definitions
Revise and
Recalculate
Operational
Definition Manually
Calculate In-
Process Kanban
(IPKs)
Print Operational
Definition Header
Records
Print Operation
Definition Detail
Records
Calculate
Line Design
Manage
Kanban
Review Labor and
Machine Times
Review
Products
Perform Daily
Planning and Sequencing
Plan Resources and
Simulate Utilization Based
On Demand at Capacity
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne Manage Kanban in Demand Flow Manufacturing Environment
Production
Set Up Base Data
for Demand Flow
Manufacturing
Design Demand
Flow
Manufacturing
Line
Setup?
Search for Existing
Kanban Constants
to Edit, Copy or
Delete
Search for Existing
Kanban Locations
to Edit or Delete
Kanban Location
Master
Kanban
Constants
Add New Kanban
Constants by
Branch/Plant
Add New Kanban
Locations
Search for Existing
Pull Chains to Edit,
Copy or Delete
Add New Pull
Chains for Material
Replenishment
Import Component
Demand and
Kanban
Information from
Volume Design
Revise Kanban
Demand?
Search for Existing
Kanban Demand
by Process Map
Edit and Calculate
Kanban Demand,
Explode BOM and
Save
Yes
Search for Existing
Pull Chains to Edit,
Copy or Delete
No
Add New Pull
Chain Definitions
for Material
Replenishment
Search for
Process Map,
Filter Components,
and Select to
Assign Pull Chain
Assign Pull Chain,
Pull Sequence and
Demand Quality to
Component
Calculate Kanban
Size
Search for Existing
Kanban Sizes to
Review and
Approve
Review and
Approve Kanban
Sizes and Print
Kanban Labels
Revise DFM
Kanban
Masters?
Search for Kanban
Master, Select and
Make Revisions
Print Kanban
LabelsYes
No
Define Kanban
Messages?
Search for Existing
Kanban Messages
to Edit or Delete
Add Label
Message to
Kanban
Yes
Execute Print
Kanban Label
Program
Bring Line Live
Export Kanban
Locations and
Master Records
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne Perform Daily Planning and Sequencing
Production
Set Up Base Data
for Demand Flow
Manufacturing
Design Demand
Flow
Manufacturing
Line
Define Daily
Production Plan
Based on Demand
Generate
Production
Sequence
Edit or Clear
Sequence Number
and Quantity
Plan Resources
Print Daily Plan
Information Based
on User Define
Data Selection
Print Sequence
Records You
Generated for
Daily Plan
Enter Finished
Good Order That
Becomes Demand
for Daily Plan
Plan Resources and
Simulate Utilization
Based on Daily Rate
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne Plan Resources
Production
Set Up Base Data
for Demand Flow
Manufacturing
Design Demand
Flow
Manufacturing
Line
Perform Daily
Planning and
Sequencing
Create Resource
Design
Retrieve Process
Map and Edit
Resource
Information
Create Effective
Date Range
Header for
Resource Design
Setup Effective
Data Ranges for
Resource Design
Plan Resources and
Simulate Utilization
Based on Daily Rate
Create Resource
Planning
Scenarios
Iteratively to
Determine Most
Effective Use
Are Simulation
Results
Satisfactory?
Change Resource
Design Values
Adjust Demand to
Eliminate Overuse
of Resource
No
No
Achieve
Satisfactory
Simulation of
Resource
Utilization
Yes Bring Line Live
JD Edwards EnterpriseOne L2 Manage Shop Floor
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
Production
Supplier
Quality
Management
Warehouse
Import
Transactions from
Other Systems
Record Scrap
Issue Material
Report Order
Completions
Report Test
Results
Report Time
Report
Transactions by
Operations
Report
Transactions by
Work Center
Method of
Reporting
Work?
Import Transactions
Report Individual
Transactions by Order
Report by Operation
Report by Work Center
No Additional Reporting RequiredPerform Work
Activity
Production
Method?
Engineer to Order;
Configure to Order;
Process; Discrete;
Repetitive; Blend
Manage Demand
Flow
Manufacturing
Is Order
Complete?
Close OrderAnalyze
Production
Order Complete;
Manual Close
Order Complete;
Automatic Close
Vendor
Performed
Operation?
No
Order
Not Complete
Send Material to
SupplierYes
Receive Purchased
Materials
"Outside Processing
Material Sent
from Receiving"
Manage Quality
Supplier - Outside
Process
JD Edwards EnterpriseOne Import Transactions from Other Systems
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
Production
Method of
Reporting
Work?
Type of
Transaction?
Import
Transactions
"Import Test Results"
"Import Time Transactions"
"Import Super Backflush Transactions"
"Import Material Issue Transactions"
"Import Kanban Transactions"
"Import Completed Transactions"
Report and Export
Transaction
Convert
Transaction Data
to Flat File
Errors in Flat
File?
Run Inbound
Transaction Edit/
Update
Edit Inbound
Transaction
Purge Inbound
Transactions
No
Yes
JD Edwards EnterpriseOne Record Scrap
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
ProductionRecord
Component Scrap
Manufacturing
Accounting and
Finance Data
Unaccounted Component Scrap Quantity
JD Edwards EnterpriseOne Issue Material
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
Warehouse
Production and
Distribution
Planning
ProductionSelect Order/Rate
for Issue
Review Items to
be Issued
Override
Default Lot/
Location?
Enter Quantity by
Lot/Location
Yes
Adjust
Transaction
Quantity as
Needed
No
Warehouse Pick
Requests and
Suggestions
Reprint
Manufacturing
Order Parts List
Pick List
For
Manufacturing
Pick Request
For
Manufacturing
Pick MaterialsGo To: Procurement and Materials Management,
Manage Materials; Pick Processing
Deliver New
Parts List
to Requester
Additional Item/
Ingredients
Needed?
Process IssueNo
Add Item/
Ingredient to
Issue Screen
Added Item/
Ingredient
Allowed at
Time of
Issue?
Yes
Yes
Requests Parts
List Change
from Planner
No
Add Item/
Ingredients to
Parts List
“Transaction
Continued”
Manufacturing
Accounting and
Finance Data
Pay on
Consumption
Code?
Move Purchase
Order Out of
Receipt Routing
Receipt
Routing
Receive Purchase
Order
PO
Rejects
Inventory
Move Material
to Point of Use
Purchase Order
Receipts Ready to
Match
Purchase Order
Receipt Ready
to Match
Data StorePO Receipt
Ready to
Post to GL
MaterialsMaterial For
Manufacturing Orders
JD Edwards EnterpriseOne Report Order Completions
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
Production
Standalone Work
Order Completions
Enter/Revise
Completion and/or
Scrap Quantity
"Order Selected for
Completion or Scrap"
Type?
Automatic
Adjust Issue
Quantities?Issue MaterialBackflush Standard Quantity
Adjust Backflush Quantity
Update Sales
Detail with
Completion
Data
Sales OrderUpdated Sales
Detail Line for
Make to Order Item
Generate
Putaway
Request
Warehouse Putaway
Requests and
Suggestions
Putaway Request
From Manufacturing
Order Receipt
Update
Receipts
Routing
Receipt Routing
OperationsManufactured Item In
Receipts Routing
Type?
Optional
Report Completion
of Planned co/by
Products
Report Completion
of Unplanned co/
by Products
Complete Quantity
to Location/Lot
Online Back Order
Release
Report Test
Results
Report Test
Results
Issue Material
No Additional
Transaction Required
Product Meets
Requirements?
Is Receipts
Routing Used?
Where is
Material
Stored?
Mark or
Separate
Discrepant
Material
Move to receipts
Routing
Operations
Move Product to
Warehouse
Send Material to
Warehouse
Dispose of
Discrepant
Material
Move Product to
Consuming
LocationMaterials
End
End
Manufacturing
Accounting and
Finance Data
Product Discrepant and
Completed to
Inventory for Disposition
"Discrepant
Material
Identified"
Yes
Manufactured Item in
Receipts Routing
(Handle Produced Materials)
Product
Meets
Requirements
No
Material to be
Stored in Warehouse
Material to be
Stored at
Consuming Location
Manufacturing Completion to be Put Away
Product
Discrepant and
Scrapped
"Discrepant Quantity
Noted and Material Disposed"
Unaccounted
Completion
Quantity
"Completion Recorded"
Discrepant Material
JD Edwards EnterpriseOne Report Test Results
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
Production
Record Test
Results in Quality
Management
Enter Test Results“Manufacturing Order Selected for Entry”
Copy Test Results
JD Edwards EnterpriseOne Report Time
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
Production
Enter Hours and
Quantity
Key Hours and
Quantities into
Form
Record Test
Results?No
Report Test
Results
Yes “Test Results
Entered”
Update Time
Entry
Immediately?
No
Submit Hours and
Quantities Update
Update Hours and
Quantities
Yes
Manufacturing
Accounting and
Finance Data
Unprocessed
Time
Transactions
Unaccounted Time Transactions
Unprocessed Time Transactions
JD Edwards EnterpriseOne Report Transactions by Operation by Order
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
Production
Report Operation
Completion and
Scrap
Enter Operation
Completion
Information
Reporting Test
Results?
Report Test
Results
Yes
Report Test
Results
“Test
Results
Entered”
NoLast
Operation?
Report Order
Completion
Yes
Report Order
Completion
“Completion
Recorded”
NoIssuing
Material?
Issue Material
Yes
Issue Material
“Material
Issued”
NoRecording
Time?
Report Time
Yes
Report Time
“Time and Quantity
Transactions Recorded”
No Next Step?
Return to
Super
Backflush
Method of
Reporting
Work?
Report by
Operation
Report
Transactions by
Work Center
Return to Completions Workbench
JD Edwards EnterpriseOne Report Transactions by Work Center
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
Production
Method of
Reporting
Work?
Repetitive Order
Completion
Report by
Work Center
Report Order
Completion
Report Test
Results
Report Time
Issue Material
Report
Transactions by
Operation by
Order
"Order
Completions
Selected"
"Manual
Issues
Selected"
"Test
Result Entry
Selected"
"Time
Transactions
Selected"
Report Order
Completion
Report Test
Results
Report Time
Issue Material
"Completion
Recorded"
"Materials
Issued"
"Test
Results
Recorded"
"Time and Quantity
Transactions
Recorded"
JD Edwards EnterpriseOne Close Order
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
Production
Is Order
Complete?
Set Order to Close
Status
Order Complete;
Manual Close
Analyze
Production
Locate Order to
Update
Enter Value to
Selected Work
Order
Update Work
Order
If Status is
Closed?
Update Work
Order to Other
Status
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne L2 Analyze Production
Production
Manufacturing
Accounting
Manage Shop
Floor
Which
Mode of
Analysis?
Review Production
Report
Review Production
Inquiry
Report
Online Enquiry
Account for
Manufacturing
Activity
PMPN WorkbenchPMPN Mode
ETO WorkbenchETO Mode
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne Review Production Report
Production
Manufacturing
Accounting
Which Mode of
Analysis?
Which Make
Product
Reports
Required?
Report
Create Order
Processing Report
Create WO Time
And Quantity
Journal Report
Create Dispatch
List Report
Create Component
Shortages Report
Create All
Shortages Report
Create Supply
Demand Report
Create Work Order
Summary Report
Method of
Report
Review?
Print Report
Review Report
Interactively
Account for
Manufacturing
Activity
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne Review Production Inquiry
Production
Manufacturing
Accounting
Account for
Manufacturing
Activity
Review Order
Hours Status
Review Parts
Availability
Review Parts list
Inquiry
Review Part
Usability
Review Shortage
Workbench
Review Supply
and Demand
Inquiry
Review Summary
Availability
Review Parts List
Comparison
Review Parts List
To BOM
Comparison
Review Shop Floor
Workbench
Review Dispatch
List - P31220
Review Lot
Availability
Review Product
Cost Inquiry
Review Process
Order Inquiry
Review Production
Status
Review Production
History
Review Order
Quantity Status
Review Line
Scheduling
Workbench
Review Line
Schedule Review
Review Line
Sequencing
Workbench
Review Line
Dispatch List
Review Work
Center Schedule
Review
Review Item
Ledger
Review Trace/
Track Inquiry
Which Mode of
Analysis?
Which
Production
Inquiries
Required?
Online
Enquiry
Discuss Results
with Appropriate
Personnel
PMPN Workbench
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne L2 Enhancement in Manage Quality
Quality
Management
Production
Establish
Quality Criteria
and Standards
Establish
Quality Controls
Conduct Quality
TestsMonitor Quality
Correct Product
or ProcessAnalyze Quality
Manage Shop
Floor
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne Analyze Quality
Quality
Management
Review Product
Test Report
Review Test
Results Inquiry
Review Certificate
of Analysis
Review
Nonconforming
Product
Review Tested
Lots Search
Review Test
Results
Workbench
Review Trace Test
Results
Monitor QualitySelect Report
or Inquiry?
Discuss Results
with Appropriate
Personal
Correct Product or
Process
Copy Tests
Results
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne L2 Account for Manufacturing Activity
Production
Manufacturing
Accounting
Analyze
Production
Record
Manufacturing
Journal Entries
Automatic
Close Desired?
Run Automatic
Closing Cycle
No Automatic Close Used
Close
Orders
Automatically
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne Record Manufacturing Journal Entries
Production
Manufacturing
Accounting
Create Journal
Entries for In-
Process
Manufacturing
Orders and Rate
Schedules
Create Journal
Entries for
Completed
Manufacturing
Orders and Rate
Schedules
Run Journal
Entries for
Manufacturing
Vacancies - Proof
Run Journal
Entries for
Manufacturing
Variances - Final
Automatic
Close Desired?
Data Store
Review
Manufacturing
Variances
Analyze
Production
Journal Entries for
Manufacturing Activity
Journal Entries for
Manufacturing Activity
Journal Entries for
Manufacturing Activity
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne Run Automatic Closing Cycle
Manufacturing
Accounting
Automatic
Close Desired?
Type of Order
to Close?
Mark
Manufacturing
Order for Final
Accounting
Close Rate
Schedules
Mark
Manufacturing
Order for
Automatic Close
EndClose
Orders
Automatically
Close
Manufacturing
Order
Close
Rate
Schedule
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne L2 Engineer to Order (ETO)
Production
Production
Method?Create Project Define Tasks
Define Task
DependenciesSchedule ProjectETO
Create Orders for
a ProjectPerform PRP
Execute Project Close Project
Manage Shop
Floor
Project
Commitment
Copyright © 2014, Oracle and/or its affiliates. All rights reserved.
JD Edwards EnterpriseOne L2 PMPN
Production
Production
Method?Create PMPN Demand Type?
Create Forecast
for PMPN
Create Sales
Order for PMPN
Process MRP
Process MRP
Messages for
Each PMPN
Manage Shop
Floor
top related