PMBOK 6th Ed
ITTO Analysis
Inputs:
Business documents: Business Case Develop Project Charter
Close Project or Phase
Collect Requirements
Determine Budget
Plan Procurement Management
Identify Stakeholders 6
Business documents: Benefits management plan Develop Project Charter
Close Project or Phase
Determine Budget
Plan Procurement Management
Identify Stakeholders 5
Agreements Develop Project Charter
Monitor and Control Project Work
Close Project or Phase
Collect Requirements
Develop Schedule
Determine Budget
Control Resources
Identify Risk
Control Procurements
Identify Stakeholders
Plan Stakeholder Engagement 11
Enterprise environmental factors Develop Project Charter
Develop Project Management Plan
Direct and Manage Project Work
Manage Project Knowledge
Monitor and Control Project Work
Perform Integrated Change Control
Plan Scope Management
Collect Requirements
Define Scope
Create WBS
Plan Schedule Management
Define Activities
Sequence Activities
Estimate Activity Durations
Develop Schedule
Plan Cost Management
Estimate Costs
Determine Budget
Plan Quality Management
Control Quality
Plan Resource Management
Estimate Activity Resources
Acquire Resources
Develop Team
Manage Team
Plan Communications Management
Manage Communications
Monitor Communications
Plan Risk Management
Identify Risk
Perform Qualitative Risk Analysis
Perform Quantitative Risk Analysis
Plan Risk Responses
Plan Procurement Management
Conduct Procurements
Control Procurements
Identify Stakeholders
Plan Stakeholder Engagement
Manage Stakeholder Engagement 39
Organizational process assets Develop Project Charter
Develop Project Management Plan
Direct and Manage Project Work
Manage Project Knowledge
Monitor and Control Project Work
Perform Integrated Change Control
Close Project or Phase
Plan Scope Management
Collect Requirements
Define Scope
Create WBS
Control Scope
Plan Schedule Management
Define Activities
Sequence Activities
Estimate Activity Durations
Develop Schedule
Control Schedule
Plan Cost Management
Estimate Costs
Control Costs
Plan Quality Management
Manage Quality
Control Quality
Plan Resource Management
Estimate Activity Resources
Acquire Resources
Develop Team
Manage Team
Control Resources
Plan Communications Management
Manage Communications
Monitor Communications
Plan Risk Management
Identify Risk
Perform Qualitative Risk Analysis
Perform Quantitative Risk Analysis
Plan Risk Responses
Implement Risk Responses
Plan Procurement Management
Conduct Procurements
Control Procurements
Identify Stakeholders
Plan Stakeholder Engagement
Manage Stakeholder Engagement
Monitor Stakeholder Engagement 46
Project Charter Develop Project Management Plan
Close Project or Phase
Plan Scope Management
Collect Requirements
Define Scope
Plan Schedule Management
Plan Cost Management
Determine Budget
Plan Quality Management
Plan Resource Management
Plan Communications Management
Plan Risk Management
Plan Procurement Management
Identify Stakeholders
Plan Stakeholder Engagement 15
Outputs from other processes Develop Project Management Plan 1
Project Management Plan: Any component Direct and Manage Project Work
Manage Project Knowledge
Monitor and Control Project Work
Close Project or Phase
Plan Risk Management 5
Project Management Plan: Change management plan Perform Integrated Change Control
Control Scope
Control Procurements
Manage Stakeholder Engagement 4
Project Management Plan: Configuration management plan Perform Integrated Change Control
Control Scope
Conduct Procurement 3
Project Management Plan: Scope baseline Perform Integrated Change Control
Validate Scope
Control Scope
Plan Schedule Management
Define Activities
Sequence Activities
Estimate Activity Durations
Develop Schedule
Control Scope
Estimate Costs
Determine Budget
Plan Quality Management
Estimate Activity Resources
Identify Risk
Perform Quantitative Risk Analysis
Plan Procurement Management 16
Project Management Plan: Schedule baseline Perform Integrated Change Control
Define Activities
Sequence Activities
Estimate Activity Durations
Control Schedule
Plan Resource Management
Identify Risk
Perform Quantitative Risk Analysis
Control Procurements
Project Management Plan: Cost baseline Perform Integrated Change Control
Control Costs
Acquire Resources
Identify Risk
Perform Quantitative Risk Analysis
Plan Risk Responses
Conduct Procurement 16
Project Management Plan: Quality management plan Plan Scope Management
Estimate Costs
Manage Quality
Control Quality
Plan Resource Management
Identify Risk
Plan Procurement Management 7
Project Management Plan: Project life cycle description Plan Scope Management 1
Project Management Plan: Description approach Plan Scope Management 1
Project Management Plan: Scope management plan Collect Requirements
Define Scope
Create WBS
Validate Scope
Control Scope
Plan Procurement Management
Conduct Procurement 7
Project Management Plan: Requirements management plan Collect Requirements
Validate Scope
Control Scope
Plan Quality Management
Identify Risk
Conduct Procurements
Control Procurements 7
Project Management Plan: Stakeholder engagement plan Collect Requirements
Plan Quality Management
Monitor Communications
Identify Stakeholders
Manage Stakeholder Engagement
Monitor Stakeholder Engagement 6
Project Management Plan: Performance measurement baseline Control Scope
Control Schedule
Control Costs 3
Project Management Plan: Development approach Plan Schedule Management
Project Management Plan: Schedule management plan Control Scope
Develop Schedule
Control Schedule
Plan Cost Management
Identify Risk 5
Project Management Plan: Cost management plan Estimate Costs
Determine Budget
Control Costs
Identify Risk 4
Project Management Plan: Resource management plan Determine Budget
Estimate Activity Resources
Acquire Resources
Develop Team
Manage Team
Control Resources
Plan Communications Management
Manage Communications
Monitor Communications
Identify Risk
Plan Risk Responses
Plan Procurement Management
Plan Stakeholder Engagement
Monitor Stakeholder Engagement 14
Project Management Plan: Risk management plan Plan Cost Management
Plan Quality Management
Identify Risk
Perform Qualitative Risk Analysis
Perform Quantitative Risk Analysis
Plan Risk Responses
Implement Risk Responses
Monitor Risk
Conduct Procurements
Control Procurements
Plan Stakeholder Engagement
Manage Stakeholder Engagement 12
Project Management Plan: Procurement management plan Acquire Resources
Conduct Procurements
Control Procurements 3
Project Management Plan: Communications management plan Manage Communications
Monitor Communications
Conduct Procurements
Identify Stakeholders
Plan Stakeholder Engagement
Manage Stakeholder Engagement
Monitor Stakeholder Engagement 7
Project documents: Change log Direct and Manage Project Work
Close Project or Phase
Manage Communications
Identify Stakeholders
Plan Stakeholder Engagement
Manage Stakeholder Engagement 6
Project documents: Lessons learned register Direct and Manage Project Work
Manage Project Knowledge
Monitor and Control Project Work
Close Project or Phase
Collect Requirements
Validate Scope
Control Scope
Estimate Activity Durations
Develop Schedule
Control Scope
Control Schedule
Estimate Costs
Control Costs
Manage Quality
Control Quality
Develop Team
Manage Team
Manage Communications
Monitor Communications
Identify Risk
Plan Risk Responses
Implement Risk Responses
Monitor Risk
Conduct Procurements
Control Procurements
Manage Stakeholder Engagement
Monitor Stakeholder Engagement 27
Project documents: Milestone list Direct and Manage Project Work
Monitor and Control Project Work
Close Project or Phase
Sequence Activities
Estimate Activity Durations
Develop Schedule
Perform Quantitative Risk Analysis
Plan Procurement Management
Control Procurements 9
Project documents: Project communication Direct and Manage Project Work
Close Project or Phase
Monitor Communications
Monitor Stakeholder Engagement 4
Project documents: Project schedule Direct and Manage Project Work
Control Schedule
Estimate Costs
Plan Resource Management
Acquire Resources
Develop Team
Plan Risk Responses
Conduct Procurement 8
Project documents: Requirements traceability matrix Direct and Manage Project Work
Control Scope
Plan Quality Management
Plan Procurement Management
Control Procurements 5
Project documents: Risk register Direct and Manage Project Work
Monitor and Control Project Work
Define Scope
Estimate Activity Durations
Develop Schedule
Estimate Costs
Plan Quality Management
Plan Resource Management
Estimate Activity Resources
Control Resources
Perform Qualitative Risk Analysis
Perform Quantitative Risk Analysis
Plan Risk Responses
Implement Risk Responses
Monitor Risk
Plan Procurement Management
Conduct Procurements
Control Procurements
Plan Stakeholder Engagement
Monitor Stakeholder Engagement 20
Project documents: Risk report Direct and Manage Project Work
Close Project or Phase
Monitor and Control Project Work
Perform Integrated Change Control
Close Project or Phase
Manage Quality
Manage Communications
Perform Quantitative Risk Analysis
Plan Risk Responses
Implement Risk Responses
Monitor Risk 11
Project documents: Project team assignments Manage Project Knowledge
Estimate Activity Durations
Develop Team
Manage Team
Control Resources
Plan Risk Responses
Plan Procurement Management 7
Project documents: Resource breakdown structure Manage Project Knowledge
Perform Integrated Change Control
Estimate Activity Durations 3
Project documents: Source selection criteria Manage Project Knowledge 1
Project documents: Stakeholder register Manage Project Knowledge
Collect Requirements
Plan Quality Management
Plan Resource Management
Acquire Resources
Plan Communications Management
Manage Communications
Plan Risk Management
Identify Risk
Perform Qualitative Risk Analysis
Plan Risk Responses
Plan Procurement Management
Conduct Procurement
Control Procurements
Plan Stakeholder Engagement
Manage Stakeholder Engagement
Monitor Stakeholder Engagement 17
Project documents: Assumption log Monitor and Control Project Work
Close Project or Phase
Collect Requirements
Define Scope
Sequence Activities
Estimate Activity Durations
Develop Schedule
Plan Quality Management
Estimate Activity Resources
Identify Risk
Perform Qualitative Risk Analysis
Perform Quantitative Risk Analysis
Control Procurements
Plan Stakeholder Engagement 14
Project documents: Basis of estimates Monitor and Control Project Work
Perform Integrated Change Control
Close Project or Phase
Develop Schedule
Perform Quantitative Risk Analysis 5
Project documents: Issue log Monitor and Control Project Work
Close Project or Phase
Manage Team
Control Resources
Manage Communications
Monitor Communications
Identify Risk
Monitor Risk
Identify Stakeholders
Plan Stakeholder Engagement
Manage Stakeholder Engagement
Monitor Stakeholder Engagement 12
Project documents: Quality report Monitor and Control Project Work
Close Project or Phase
Validate Scope
Manage Communications
Control Procurements 5
Project documents: Schedule forecasts Monitor and Control Project Work
Perform Quantitative Risk Analysis 2
Project documents: Quality control measurements Close Project or Phase
Manage Quality 2
Project documents: Requirements documentation Close Project or Phase
Define Scope
Create WBS
Validate Scope
Control Scope
Plan Quality Management
Plan Resource Management
Identify Risk
Plan Procurement Management
Conduct Procurements
Control Procurements
Identify Stakeholders 12
Project documents: Resource requirements Estimate Activity Durations
Estimate Costs
Control Resources
Perform Quantitative Risk Analysis 4
Project documents: Project scope statement Create WBS 1
Project documents: Activity attributes Sequence Activities
Estimate Activity Durations
Develop Schedule
Estimate Activity Resources 4
Project documents: Activity list Sequence Activities
Estimate Activity Durations
Develop Schedule
Estimate Activity Resources 4
Project documents: Resource calendars Estimate Activity Durations
Develop Schedule
Control Scope
Control Schedule
Estimate Activity Resources
Acquire Resources
Develop Team
Plan Risk Responses 8
Project documents: Duration estimates Develop Schedule 1
Project documents: Project schedule network diagrams Develop Schedule 1
Project documents: Project calendar Control Schedule 1
Project documents: Schedule data Control Schedule 1
Project documents: Quality metrics Mange Quality
Control Quality 2
Project documents: Test and evaluation documents Control Quality 1
Project documents: Cost estimates Estimate Activity Resources
Identify Risk
Perform Quantitative Risk Analysis 3
Project documents: Team charter Develop Team
Manage Team 2
Project documents: Physical resource assignments Control Resources 1
Project documents: Project schedule Control Resources
Plan Stakeholder Engagement 2
Project documents: Duration estimates Identify Risk
Perform Quantitative Risk Analysis 2
Approved change requests Direct and Manage Project Work
Control Quality
Control Procurements 3
Deliverables Manage Project Knowledge
Control Quality 2
Work performance Information Monitor and Control Project Work
Perform Integrated Change Control
Change request Perform Integrated Change Control 1
Accepted deliverables Close Project or Phase 1
Procurement documentations Close Project or Phase
Identify Risk
Conduct Procurements
Control Procurements
Verified deliverables Validate Scope
Work performance data Validate Scope
Control Scope
Control Schedule
Control Costs
Control Quality
Control Resources
Monitor Communications
Monitor Risk
Control Procurements
Monitor Stakeholder Engagement
Project funding requirements Control Costs
Deliverables Control Quality
Work performance reports Manage Team
Monitor Risk
Team performance assessments Manage Team
Seller proposals Conduct Procurement
Tools and Techniques:
Expert judgment Develop Project Charter
Develop Project Management Plan
Direct and Manage Project Work
Manage Project Knowledge
Monitor and Control Project Work
Perform Integrated Change Control
Close Project or Phase
Plan Scope Management
Collect Requirements
Define Scope
Create WBS
Plan Schedule Management
Define Activities
Estimate Activity Durations
Plan Cost Management
Estimate Cost
Determine Budget
Control Costs
Plan Quality Management
Plan Resource Management
Estimate Activity Resources
Plan Communications Management
Monitor Communications
Plan Risk Management
Identify Risk
Perform Qualitative Risk Analysis
Perform Quantitative Risk Analysis
Plan Risk Responses
Implement Risk Responses
Plan Procurement Management
Conduct Procurements
Control Procurements
Identify Stakeholders
Plan Stakeholder Engagement
Manage Stakeholder Engagement
Data gathering: Brainstorming Develop Project Charter
Develop Project Management Plan
Collect Requirements
Plan Quality Management
Identify Risk
Identify Stakeholders
Data gathering: Focus groups Develop Project Charter
Develop Project Management Plan
Collect Requirements
Data gathering: Interviews Develop Project Charter
Develop Project Management Plan
Collect Requirements
Plan Quality Management
Identify Risk
Perform Qualitative Risk Analysis
Perform Quantitative Risk Analysis
Plan Risk Responses
Data gathering : Questionnaire and surveys Collect Requirements
Control Quality
Identify Stakeholders
Data gathering: Checklists Develop Project Management Plan
Manage Quality
Control Quality
Identify Risk
Data gathering: Benchmarking Collect Requirements
Plan Quality Management
Plan Stakeholder Engagement
Data gathering: Check sheets Control Quality
Data gathering: Market research Plan Procurement Management
Interpersonal and team skills: Conflict management Develop Project Charter
Develop Project Management Plan
Develop Team
Manage Team
Manage Communications
Manage Stakeholder Engagement
Interpersonal and team skills: Facilitation Develop Project Charter
Develop Project Management Plan
Manage Project Knowledge
Define Scope
Identify Risk
Perform Qualitative Risk Analysis
Perform Quantitative Risk Analysis
Plan Risk Responses
Interpersonal and team skills: Meeting management Develop Project Charter
Develop Project Management Plan
Manage Communications
Interpersonal and team skills: Active listening Manage Project Knowledge
Manage Communications
Monitor Stakeholder Engagement
Interpersonal and team skills: Leadership Manage Project Knowledge
Manage Team
Monitor Stakeholder Engagement
Interpersonal and team skills: Networking Manage Project Knowledge
Manage Communications
Monitor Stakeholder Engagement
Interpersonal and team skills: Political awareness Manage Project Knowledge
Plan Communication Management
Manage Communications
Monitor Stakeholder Engagement
Manage Stakeholder Engagement
Interpersonal and team skills: Negotiation Acquire Resources
Develop Team
Control Resources
Conduct Procurement
Manage Stakeholder Engagement
Interpersonal and team skills: Influencing Develop Team
Manage Team
Control Resources
Implement Risk Responses
Interpersonal and team skills: Motivation Develop Team
Interpersonal and team skills: Team building Develop Team
Interpersonal and team skills: Decision making Manage Team
Interpersonal and team skills: Emotional intelligence Manage Team
Interpersonal and team skills: Communication style analysis Plan Communications Management
Interpersonal and team skills: Cultural awareness Plan Communications Management
Manage Communications
Manage Stakeholder Engagement
Monitor Stakeholder Engagement
Interpersonal and team skills: Observation/conversation Monitor Communications
Manage Stakeholder Engagement
Meetings Develop Project Management Plan
Direct and Manage Project Work
Monitor and Control Project Work
Perform Integrated Change Control
Close Project or Phase
Plan Scope Management
Plan Schedule Management
Define Activities
Estimate Activity Durations
Plan Cost Management
Plan Quality Management
Control Quality
Plan Resource Management
Estimate Activity Resources
Develop Team
Plan Communication Management
Manage Communications
Monitor Communications
Plan Risk Management
Identify Risk
Perform Qualitative Risk Analysis
Monitor Risks
Plan Procurement Management
Identify Stakeholders
Plan Stakeholder Engagement
Manage Stakeholder Engagement
Monitor Stakeholder Engagement
Project management information system Direct and Manage Project Work
Sequence Activities
Develop Schedule
Control Schedule
Estimate Cost
Control Costs
Estimate Activity Resources
Manage Team
Control Resources
Manage Communications
Monitor Communications
Implement Risk Responses
Knowledge management Manage Project Knowledge
Information management Manage Project Knowledge
Data analysis: Alternatives analysis Monitor and Control Project Work
Perform Integrated Change Control
Estimate Cost
Manage Quality
Estimate Activity Resources
Control Resources
Plan Risk Responses
Plan Scope Management
Collect Requirements
Define Scope
Estimate Activity Durations
Monitor Stakeholder Engagement
Data analysis: Cost-benefit analysis Monitor and Control Project Work
Perform Integrated Change Control
Plan Quality Management
Control Resources
Plan Risk Responses
Data analysis: Earned value analysis Monitor and Control Project Work
Control Schedule
Control Costs
Control Procurements
Data analysis: Root cause analysis Monitor and Control Project Work
Manage Quality
Control Quality
Identify Risk
Plan Stakeholder Engagement
Monitor Stakeholder Engagement
Data analysis: Trend analysis Monitor and Control Project Work
Control Costs
Close Project or Phase
Control Scope
Control Schedule
Control Resources
Control Procurements
Data analysis: Variance analysis Monitor and Control Project Work
Control Costs
Close Project or Phase
Control Scope
Control Schedule
Data analysis: Document analysis Close Project or Phase
Collect Requirements
Manage Quality
Identify Risk
Data analysis: Regression analysis Close Project or Phase
Data analysis: Reserve analysis Estimate Activity Durations
Estimate Cost
Determine Budget
Control Costs
Monitor Risks
Data analysis Plan Schedule Management
Plan Cost Management
Data analysis: What-if scenario analysis Develop Schedule
Control Schedule
Data analysis: Simulation Develop Schedule
Perform Quantitative Risk Analysis
Data analysis: Iteration burndown chart Control Schedule
Data analysis: Performance reviews Control Schedule
Control Quality
Control Resources
Control Procurements
Data analysis: Cost of Quality Estimate Costs
Plan Quality Management
Data analysis: Process analysis Manage Quality
Data analysis: Stakeholder engagement assessment matrix Monitor Communications
Data analysis: Stakeholder analysis Plan Risk Management
Identify Stakeholders
Monitor Stakeholder Engagement
Data analysis: Assumption and constraint analysis Identify Risk
Plan Stakeholder Engagement
Data analysis: SWOT analysis Identify Risk
Data analysis: Risk data quality assessment Perform Qualitative Risk Analysis
Data analysis: Risk probability and impact assessment Perform Qualitative Risk Analysis
Data analysis: Assessment of other risk parameters Perform Qualitative Risk Analysis
Data analysis: Sensitivity analysis Perform Qualitative Risk Analysis
Data analysis: Decision tree analysis Perform Qualitative Risk Analysis
Data analysis: Influence diagrams Perform Qualitative Risk Analysis
Data analysis: Technical performance analysis Monitor Risks
Data analysis: Make-or-buy analysis Plan Procurement Management
Data analysis: Proposal evaluation Conduct Procurement
Data analysis: Document analysis Identify Stakeholders
Decision making Monitor and Control Project Work
Estimate Activity Durations
Decision making: Voting Monitor and Control Project Work
Collect Requirements
Validate Scope
Estimate Cost
Monitor Stakeholder Engagement
Decision making: Autocratic decision making Monitor and Control Project Work
Decision making: Multicriteria decision analysis Monitor and Control Project Work
Collect Requirements
Define Scope
Plan Quality Management
Manage Quality
Acquire Resources
Plan Risk Responses
Monitor Stakeholder Engagement
Decision making: Prioritization/ranking Plan Stakeholder Engagement
Change control tools Perform Integrated Change Control
Data representation: Affinity diagrams Collect Requirements
Manage Quality
Data representation: Mind mapping Collect Requirements
Plan Quality Management
Plan Stakeholder Engagement
Data representation: Flowcharts Plan Quality Management
Manage Quality
Data representation: Logical Data model Plan Quality Management
Data representation: Matrix diagrams Plan Quality Management
Manage Quality
Data representation: Cause-and -effect diagrams Manage Quality
Control Quality
Data representation: Histograms Manage Quality
Control Quality
Data representation: Scatter diagrams Manage Quality
Control Quality
Data representation: Control charts Control Quality
Data representation: Hierarchical charts Plan Resource Management
Perform Qualitative Risk Analysis
Data representation: Responsibility assignments matrix Plan Resource Management
Data representation: Text-orientated formats Plan Resource Management
Data representation: Stakeholder engagement assessment matrix Plan Resource Management
Plan Stakeholder Engagement
Monitor Stakeholder Engagement
Data representation: Probability and impact matrix Perform Qualitative Risk Analysis
Data representation: Stakeholder mapping/representation Identify Stakeholders
Context diagram Collect Requirements
Prototypes Collect Requirements
Product analysis Define Scope
Decomposition Create WBS
Define Activities
Inspection Validate Scope
Control Procurements
Rolling wave planning Define Activities
Precedence diagramming method Sequence Activities
Dependency determination and integration Sequence Activities
Leads and lags Sequence Activities
Develop Schedule
Control Schedule
Analogous estimating Estimate Activity Durations
Estimate Cost
Estimate Activity Resources
Parametric estimating Estimate Activity Durations
Estimate Cost
Estimate Activity Resources
Bottom-up estimating Estimate Cost
Estimate Activity Resources
Three-point estimating Estimate Activity Durations
Estimate Cost
Schedule network analysis Develop Schedule
Critical path method Develop Schedule
Control Schedule
Resource optimization Develop Schedule
Control Schedule
Schedule compression Develop Schedule
Control Schedule
Agile release planning Develop Schedule
Cost aggregation Determine Budget
Historical information review Determine Budget
Funding limit reconciliation Determine Budget
Financing Determine Budget
To-complete performance index Control Costs
Test and inspection planning Plan Quality Management
Control Quality
Audits Manage Quality
Monitor Risks
Control Procurements
Design for X Manage Quality
Problem solving Manage Quality
Control Resources
Quality improvement methods Manage Quality
Organizational Theory Plan Resource Management
Pre-assignment Acquire Resources
Virtual teams Acquire Resources
Develop Team
Colocation Develop Team
Communication technology Develop Team
Manage Communications
Individual and team assessments Develop Team
Communication requirements analysis Plan Communication Management
Communication technology Plan Communication Management
Communication models Plan Communication Management
Communication methods Plan Communication Management
Manage Communications
Communication skills: Communication competence Manage Communications
Communication skills: Feedback Manage Communications
Manage Stakeholder Engagement
Monitor Stakeholder Engagement
Communication skills: Nonverbal Manage Communications
Communication skills: Presentation Manage Communications
Monitor Stakeholder Engagement
Project reporting Manage Communications
Prompt list Identify Risk
Risk categorization Perform Qualitative Risk Analysis
Representation of uncertainty Perform Quantitative Risk Analysis
Strategies for threats Plan Risk Responses
Strategies for opportunities Plan Risk Responses
Contingent response strategies Plan Risk Responses
Strategies for overall project risk Plan Risk Responses
Source selection analysis Plan Procurement Management
Advertising Conduct Procurements
Bidders conference Conduct Procurements
Claims administration Control Procurements
Ground rules Manage Stakeholder Engagement
Outputs:
Project charter Develop Project Charter
Assumption log Develop Project Charter
Project management plan Develop Project Management Plan
Deliverables Direct and Manage Project Work
Work performance data Direct and Manage Project Work
Issue log Direct and Manage Project Work
Change request Direct and Manage Project Work
Monitor and Control Project Work
Validate Scope
Control Scope
Define Activities
Develop Schedule
Control Schedule
Control Costs
Manage Quality
Control Quality
Acquire Resources
Develop Team
Manage Team
Control Resources
Monitor Communications
Plan Risk Responses
Implement Risk Responses
Monitor Risks
Plan Procurement Management
Conduct Procurements
Control Procurements
Identify Stakeholders
Manage Stakeholder Engagement
Monitor Stakeholder Engagement
Project management plan updates: Any components Direct and Manage Project Work
Manage Project Knowledge
Monitor and Control Project Work
Perform Integrated Change Control
Monitor Risks
Project management plan updates: Scope Management Plan Control Scope
Project management plan updates: Scope baseline Control Scope
Plan Quality Management
Manage Quality
Plan Risk Responses
Conduct Procurement
Project management plan updates: Schedule baseline Control Scope
Define Activities
Develop Schedule
Control Schedule
Manage Quality
Control Resources
Manage Team
Plan Risk Responses
Conduct Procurements
Control Procurements
Project management plan updates: Cost baseline Control Scope
Define Activities
Develop Schedule
Control Schedule
Control Costs
Manage Quality
Acquire Resources
Manage Team
Control Resources
Plan Risk Responses
Conduct Procurements
Control Procurements
Project management plan updates: Performance management baseline Control Scope
Control Schedule
Control Costs
Project management plan updates: Schedule management plan Develop Schedule
Control Schedule
Plan Risk Responses
Project management plan updates: Cost management plan Control Costs
Plan Risk Responses
Project management plan updates: Risk management plan Plan Quality Management
Conduct Procurements
Control Procurements
Identify Stakeholders
Project management plan updates: Quality management plan Manage Quality
Control Quality
Plan Risk Responses
Conduct Procurement
Project management plan updates: Resource management plan Acquire Resources
Develop Team
Manage Team
Control Resources
Plan Risk Responses
Monitor Stakeholder Engagement
Project management plan updates: Stakeholder engagement plan Plan Communications Management
Manage Communications
Monitor Communications
Identify Stakeholders
Manage Stakeholder Engagement
Monitor Stakeholder Engagement
Project management plan updates: Communications management plan Monitor Communications
Conduct Procurements
Identify Stakeholders
Manage Stakeholder Engagement
Monitor Stakeholder Engagement
Project management plan updates: Requirements management plan Conduct Procurements
Identify Stakeholders
Project management plan updates: Procurement management plan Conduct Procurements
Control Procurements
Project document updates: Activity list Direct and Manage Project Work
Sequence Activities
Project documents updates: Activity attributes Sequence Activities
Estimate Activity Durations
Develop Schedule
Estimate Activity Resources
Project documents updates: Assumption log Direct and Manage Project Work
Define Scope
Sequence Activities
Estimate Activity Durations
Develop Schedule
Control Schedule
Estimate Cost
Control Costs
Plan Resource Management
Estimate Activity Resources
Control Resources
Identify Risk
Perform Qualitative Risk Analysis
Plan Risk Responses
Monitor Risks
Identify Stakeholders
Project documents updates: Milestone list Sequence Activities
Plan Procurement Management
Project documents updates: Lessons learned register Direct and Manage Project Work
Monitor and Control Project Work
Close Project or Phase
Validate Scope
Estimate Activity Durations
Control Scope
Develop Schedule
Control Schedule
Estimate Cost
Control Costs
Plan Quality Management
Manage Quality
Plan Resource Management
Estimate Activity Resources
Acquire Resources
Develop Team
Manage Team
Control Resources
Manage Communications
Monitor Communications
Identify Risk
Plan Risk Responses
Monitor Risks
Implement Risk Responses
Plan Procurement Management
Conduct Procurements
Control Procurements
Manage Stakeholder Engagement
Monitor Stakeholder Engagement
Project documents updates: Requirements documentation Direct and Manage Project Work
Define Scope
Validate Scope
Control Scope
Plan Procurement Management
Conduct Procurements
Control Procurements
Project documents updates: Stakeholder register Direct and Manage Project Work
Plan Quality Management
Acquire Resources
Manage Communications
Monitor Communications
Plan Procurement Management
Conduct Procurements
Control Procurements
Manage Stakeholder Engagement
Monitor Stakeholder Engagement
Project documents updates: Cost forecasts Monitor and Control Project Work
Plan Risk Responses
Project documents updates: Issue log Monitor and Control Project Work
Manage Quality
Control Quality
Manage Team
Control Resources
Manage Communications
Monitor Communications
Identify Risk
Perform Qualitative Risk Analysis
Implement Risk Responses
Monitor Risks
Identify Stakeholders
Manage Stakeholder Engagement
Monitor Stakeholder Engagement
Project documents updates: Risk register Monitor and Control Project Work
Develop Schedule
Control Schedule
Estimate Cost
Determine Budget
Control Costs
Plan Quality Management
Manage Quality
Control Quality
Plan Resource Management
Acquire Resources
Control Resources
Manage Communications
Perform Qualitative Risk Analysis
Plan Risk Responses
Implement Risk Responses
Monitor Risks
Plan Procurement Management
Conduct Procurements
Control Procurements
Identify Stakeholders
Project documents updates: Schedule forecast Monitor and Control Project Work
Project documents updates: Change log Perform Integrated Change Control
Manage Stakeholder Engagement
Project documents updates: Requirements traceability matrix Define Scope
Validate Scope
Control Scope
Plan Quality Management
Plan Procurement Management
Conduct Procurements
Control Procurements
Project documents updates: Stakeholder register Define Scope
Plan Communications Management
Monitor Stakeholder Engagement
Project documents updates: Project schedule Control Schedule
Determine Budget
Acquire Resources
Develop Team
Plan Communications Management
Manage Communications
Plan Risk Responses
Project documents updates: Duration estimates Develop Schedule
Project documents updates: Resource requirements Develop Schedule
Acquire Resources
Project documents updates: Basis of estimates Control Schedule
Control Costs
Project documents updates: Resource calendars Control Schedule
Conduct Procurement
Project documents updates: Schedule data Control Schedule
Project documents updates: Cost estimates Determine Budget
Control Costs
Project documents updates: Test and evaluation documents Control Quality
Project documents updates: Resource breakdown structure Acquire Resources
Control Resources
Project documents updates: Project team assignments Develop Team
Manage Team
Control Resources
Plan Risk Responses
Implement Risk Responses
Project documents updates: Team charter
Project documents updates: Risk Reports Perform Qualitative Risk Analysis
Perform Quantitative Risk Analysis
Plan Risk Responses
Implement Risk Responses
Monitor Risks
Enterprise environmental factors updates Acquire Resources
Develop Team
Manage Team
Organizational process assets updates Direct and Manage Project Work
Manage Project Knowledge
Close Project or Phase
Acquire Resources
Develop Team
Manage Communications
Monitor Risks
Plan Procurement Management
Conduct Procurements
Control Procurements
Lessons learned register Manage Project Knowledge
Work performance reports Monitor and Control Project Work
Approved change requests Perform Integrated Change Control
Final product, service, or result transition Close Project of Phase
Scope management plan Plan Scope Management
Requirements management plan Plan Scope Management
Requirements documentation Collect Requirements
Requirement traceability matrix Collect Requirements
Project scope statement Define Scope
Scope baseline Create WBS
Requirements documentation Create WBS
Accepted deliverables Validate Scope
Work performance information Validate Scope
Control Scope
Control Schedule
Control Costs
Control Quality
Control Resources
Monitor Communications
Monitor Risks
Control Procurements
Monitor Stakeholder Engagement
Procurement document updates Control Procurements
Schedule management plan Plan Schedule Management
Activity list Define Activities
Activity attributes Define Activities
Project schedule network diagrams Sequence Activities
Duration estimates Estimate Activity Durations
Basis of estimates Estimate Activity Durations
Estimate Cost
Estimate Activity Resources
Schedule baseline Develop Schedule
Project Schedule Develop Schedule
Schedule data Develop Schedule
Project calendars Develop Schedule
Schedule forecasts Control Schedule
Cost management plan Plan Cost Management
Cost estimates Estimate Costs
Cost baseline Determine Budget
Project funding requirements Determine Budget
Cost forecasts Control Costs
Quality management plan Plan Quality Management
Quality metrics Plan Quality Management
Quality reports Manage Quality
Test and evaluation documentations Manage Quality
Quality control measurements Control Quality
Verified deliverables Control Quality
Resource management plan Plan Resource Management
Team charter Plan Resource Management
Resource requirements Estimate Activity Resources
Resource breakdown structure Estimate Activity Resources
Physical resource assignments Acquire Resources
Project team assignment Acquire Resources
Resource calendars Acquire Resources
Team performance assessments Develop Team
Communication management plan Plan Communication Management
Project Communications Manage Communications
Risk Management plan Plan Risk Management
Risk register Identify Risk
Risk report Identify Risk
Procurement management plan Plan Procurement Management
Procurement strategy Plan Procurement Management
Bid documents Plan Procurement Management
Procurement statement of work Plan Procurement Management
Source selection criteria Plan Procurement Management
Make-or-buy decision Plan Procurement Management
Independent cost estimates Plan Procurement Management
Selected Sellers Conduct Procurements
Agreements Conduct Procurements
Closed procurements Control Procurements
Stakeholder register Identify Stakeholders
Stakeholder engagement plan Plan Stakeholder Engagement