IT Policy PWD, Himachal Pradesh
Wipro Ltd 1 Confidential
IT Policy
For Development of ICT Infrastructure in HPPWD and HPRIDC
Submitted by: Submitted to:
Wipro Ltd Himachal Pradesh Public Works department (HPPWD)
This document is the property of Wipro Ltd., who owns the copyright thereof. The information in this document is given in confidence and without the written consent of Wipro Ltd., given by contract or otherwise, this document must not be copied, reprinted or reproduced in any material form, either wholly or in part. Also the contents of this document or any methods or techniques available there from, must not be disclosed
IT Policy PWD, Himachal Pradesh
Wipro Ltd 2 Confidential
Contents 1 Introduction ............................................................................................................................................ 5
2 Our approach ......................................................................................................................................... 7
3 Overview of HPPWD & HPRIDC ........................................................................................................... 8
3.1 Functions Performed by the Department ...................................................................................... 9
4 Recommendation and Road Ahead ..................................................................................................... 13
4.1 Technology .................................................................................................................................. 18
Network Architecture ............................................................................................................... 18
Solution Architecture ............................................................................................................... 20
Security Recommendations .................................................................................................... 24
Application List ........................................................................................................................ 28
Application Description ............................................................................................................ 30
Database Description .............................................................................................................. 36
4.2 Standards .................................................................................................................................... 38
Application and Development Standards ................................................................................ 38
Integration Standards .............................................................................................................. 38
Database Standards ............................................................................................................... 39
Localization & Language Technology Standards .................................................................... 42
Network Standards .................................................................................................................. 43
Security Standards .................................................................................................................. 43
Performance Requirement ...................................................................................................... 45
4.3 Training ....................................................................................................................................... 47
Training Approach ................................................................................................................... 48
Retraining of Existing Staff ...................................................................................................... 49
4.4 Progress Monitoring Parameters ................................................................................................ 49
5 Way Forward ........................................................................................................................................ 52
IT Policy PWD, Himachal Pradesh
Wipro Ltd 3 Confidential
Glossary
S. No. Abbreviation Full Form
1. BPR Business Process Re-engineering
2. CRF Central Road Funds
3. CE Chief Engineer
4. DC Data Center
5. DNIT Detailed Notice Inviting Tender (Bid Document)
6. DO Divisional officer
7. DRC Disaster Recovery Center
8. EE Executive Engineer
9. GIS Geographical Information System
10. GO Government Order
11. IP Infrastructure Project
12. JE Junior Engineer
13. NH National Highway
14. NIT Notice Inviting Tender (for publication purposes)
15. PMGSY Pradhan Mantri Gram Sadak Yojna
16. PPP Public Private Partnership
17. PWD Public Works Department
18. RFP Request for Proposal
19. RFQ Request for Qualification
20. SDC State Data Center
21. AE Assistance Engineer
IT Policy PWD, Himachal Pradesh
Wipro Ltd 4 Confidential
22. SE Superintending Engineer
23. SLA Service Level Agreement
24. WB World Bank
IT Policy PWD, Himachal Pradesh
Wipro Ltd 5 Confidential
1 Introduction
Public Works Department (PWD) & State Roads Project (HPRIDC) is a premier department of the
Himachal Government responsible for planning, developing, designing, construction, operation
and maintenance of roads, bridges and buildings in the State (which constitutes basic
infrastructure) with finances being provided by State Government, grant-in-aid / assistance from
Central Government or raising loans from Financial Institutions. Over the period under impetus
of infrastructure development number of roads, bridges and building projects being undertaken
by the Department have been on an increase every year. However, the human resources in the
department to handle these projects have been declining every year. The working of department
is both elaborate and exhaustive in terms of:
Project proposals and preparation of estimates
Arranging approval of project proposal and allocation of funds
Tendering for award of work to contracting agencies having previous experience of
executing similar works and meeting eligibility criteria.
Execution of works – requiring detailed measurements of executed quantities and
preparation of running-account and final bills.
Payments for executed work and fund flow
Monitoring and review of work and administering the Contract for work
Inspection of works by Engineers at various levels, exercise of quality control
Completion report, monitoring during defects liability period, handing over and
maintenance
Incidental works e.g. Arbitration, audit by Accountant General
Other administrative works i.e. human resource management
The above procedures and processes require lot of paper work in compliance with provisions of
rules and regulations of department’s working. With reduction in strength of engineering and
allied services staff at all levels and simultaneous increase in number of works relating to new
infrastructure to be developed and up-gradation and maintenance of existing infrastructure it is
imperative to strengthen institutional framework which also includes bringing in and adopting
strong tools like computerization, IT enablement, e-governance and automation at various level
in the department to bring effectiveness and efficiency in working. As a first step e-tendering has
been introduced and is being followed. As regard works approved and executed under PMGSY
scheme, e-governance is being followed. To certain extent for monitoring of works under a
particular scheme, e-governance has been adopted partially but not completely
The department shall not be the first to introduce computerization in day to day working as
parallel departments in various states have adopted e-governance partially in terms of
IT Policy PWD, Himachal Pradesh
Wipro Ltd 6 Confidential
“monitoring of approval of projects/works under various heads of accounts”, “allotment of funds
among sanctioned works approved under a scheme “record management system”, “record
management maintenance system” “Consolidation/Bank of Approval under each head of
account”, “consolidation of progress report of works approved under a scheme/head of account”
etc. The ideal situation would be paper-less working and all offices at various levels in the
department’s working and interacting with each other on-line and other communicating with
connected connecting departments on-line and simultaneously complying with requirements of
department rules, financial rules, accounts code, manual of orders etc. It is true that
departmental rules and regulations requires maintenance of some permanent records over a
specific period e.g. measurement book (MB) over a period of 100 years. Well here a thought
needs to be given that such Measurement Book (MB) in paper format may also be maintained
on completion of work in addition to soft copy. Further during execution of work itself, paper
format may also be followed in respect of hidden items of work which cannot be measured later
e.g. foundations of buildings and bridges.
The complete computerization has been envisaged in a phased manner and primary object refers to e-governance in work flow system of department to improve internal administrative efficiency, to bring in transparency and accountability in operations, effective systems for reducing paper work (particularly repetitive work) at all levels, efficient system for monitoring of projects, establish a real-time system for prompt and efficient decision making, integration of assets and efficient asset management, consolidation of inventory of roads, bridges and buildings for their maintenance, development of Project management systems etc.
The terms of reference under the present assignment:
Project Inception & Design
•SOW Understanding
•Understanding of organization structure, functions & services
•Requirement analysis
•AS-IS Study updation
•BPR & TO-BE processes report
•Financial Model & Cost Requirements
•IT Policy Formulation
Project Construction
•Preparation of TOR & RFP.
•Assistance in procurement process.
•Assistance in preparation of Contract agreement & SLA for System Integrator (SI).
Project Development
•Project Management
•Monitoring the progress of Project implementation by SI & Setting up of controls & mechanisms.
•Undertaking Quality audits.
•Project status summary
•Review of Project deliverables
Project Sustenance
•Assistance for adoption ofnew system.
•Change management services.
•Monitoring of SI as per SLAs.
•Project lerning documents.
•Knowledge transfer to State.
IT Policy PWD, Himachal Pradesh
Wipro Ltd 7 Confidential
2 Our approach
The purpose of this section is to provide the reader with an understanding of the approach adopted for preparation of this deliverable
Figure: Approach Adopted for Preparation of IT plan
Interaction
Interaction with officials of
each wing of PWD
Identify Functions of each wing
Capture the flow of
information/ data across wings
for each of the functions
Identify Issues and pain areas
for each wing
Simultaneously also study
examples of IT implementation
in similar organizations
Prioritization
Technology Definition
IT Plan Preparation
Prepare Recommendations for
addressing the pain areas
Prepare recommendations for
each pain area and identify
applications for the same
Prioritize the implementation
of applications on the basis of
need and feasibility
Validate the prioritization with
PWD
Prepare application definition
in line with the requirements
identified
Identify the interlink ages of
the applications identified
Identify networking security
and site requirements as per
technology required
Prepare IT Plan
Prepare Cost Estimates for
implementation of the budget
Define an Implementation Plan
and Approach
Define Training Needs for the
Implementation
IT Policy PWD, Himachal Pradesh
Wipro Ltd 8 Confidential
3 Overview of HPPWD & HPRIDC
HPWPD at Government level is headed by Principal Secretary (PW) to the Govt. of Himachal Pradesh, who holds Administrative responsibility for HPWPD. The Pr. Secretary physically located in the Secretariat and operates as the senior liaison between Government and HPPWD.
HPPWD at Directorate level is headed by a position of the Engineer-in-Chief (EnC) with Headquarters at Shimla. Works and matters regarding Codes, Specifications, Planning & Monitoring, and Inter-State Connectivity for the entire State and also the entire establishments of HPPWD are controlled by the Engineer-in-Chief. Engineer-in-Chief is responsible for all technical functions of the HPPWD. Engineer-in-Chief reports to Pr. Secretary (PW) to the Govt. of Himachal Pradesh.
In HPPWD there are one EnC (QC & D), 8 Chief Engineers (CE-cum-Project Director HPRIDC, CE Shimla Zone, CE Mandi Zone, CE Hamirpur Zone, CE Kangra Zone, CE PMGSY, and CE NH) who report to the EnC. Each Chief Engineers are responsible for each unit called ‘wing’/zone.
Engineer-in-Chief (Quality & Design) acts as State Level Quality Coordinator for achieving quality parameters of works in the State. Material Testing Laboratories at State level and Zonal Laboratories are under his control. He conducts quality control checks throughout the State. He is the in-charge for Standardization of Designs and Drawings for Buildings, Bridges and Assurance of common Technical Instructions, Manual of Order, Codes & Specifications, Schedule of Rates, Training Programs, Workshops and allied fields etc.
On administrative and functional considerations, the department has been divided into four zones namely Mandi Zone, Hamirpur Zone, Shimla Zone and Kangra Zone at Dharmshala.
Each zone is being headed by Chief Engineers and they are called as Zonal Chief Engineers. Zonal Chief Engineer deals with all works related to PMGSY, State Budget, RIDF, Annual plan, Maintenance, etc. They are responsible all works relating to DPR / Estimate preparation, tendering, and allotment of works, reviewing progress, monitoring, maintenance and expenditure.
Chief Engineer (National Highways) with headquarters at Shimla controls the Planning and Execution of works of National Highways traversing through the State.
Chief Engineer (PMGSY) is monitoring, planning and having day-to-day interaction with Govt. of India (MoRD) for the works of PMGSY and PMGSY (World Bank) funded projects through National Rural Road Development Agency (NRRDA).
The Zones (Buildings, Roads & Bridges), Electrical, Mechanical, Quality Control & Design and National Highways wing have filed offices called circles, which are headed by Superintending Engineers (SE) who reports to the concerned Chief Engineers for the administration and general professional controls of the public works being executed by officers of the department within their circles. There are 14 B & R circle, 2 Electrical circles, 1 Mechanical circle, 1 Arbitration circle,
IT Policy PWD, Himachal Pradesh
Wipro Ltd 9 Confidential
2 NH circle, 1 Land Acquisition Office, 1 Chief Architect Office. Each circle further divided into number of divisions, each headed by Executive Engineer.
There are 60 R&B divisions, 5 Electrical divisions, 2 Mechanical divisions, 5 NH divisions, 1 Land Acquisition office, 1 Architect Office. Each division further divided into sub-divisions, each headed by Assistant Engineers. There are 284 sub-divisions, 11 field offices viz. Arbitration office, Land Acquisition office, Architect office & Quality Control office.
Himachal Pradesh Road Infrastructure Development Corporation (HPRIDC)
Himachal Pradesh Road & Other Infrastructure Development Corporation Limited was incorporated in 10.06.1999 under the Companies Act, 1956, and it is wholly owned Company of Government of Himachal Pradesh. The main objective of HPRIDC is;
Construction of Roads/Bridges/Other infrastructure in the State of Himachal Pradesh
Maintenance of Roads/Bridges/Other infrastructure in the State of Himachal Pradesh
To act as a special purpose vehicle for resource mobilization on behalf of the State Government for all infrastructures projects and also discharge obligations on this account on behalf of the State Government from revenue other receipts accruing to the State Government from such projects
HPRIDC is headed by the rank of Chief Engineer and called as Project Director-cum-Chief Engineer HPRIDC.
3.1 Functions Performed by the Department
Public Works Department of Himachal Pradesh is primarily responsible for executing following
different types of development works;
Construction and maintenance of new roads, national highways & bridges
Construction and maintenance of residential and non-residential buildings
Construction of roads under centrally sponsored schemes
Undertaking deposit contribution works relating to different government
departments as well as of other local bodies
Resettlement works due to natural calamities like flood, earth quakes etc.
Construction of roads under employment guarantee scheme
Fixation of rent of private premises requisitioned for housing government offices
Developing parks and gardens in the vicinity of important public buildings and
landscaping of grounds
Providing reservation facility of government rest houses and circuit houses
To permit construction of approaches on both sides of roads to private individual,
other institutions, factories, petrol pumps etc.
IT Policy PWD, Himachal Pradesh
Wipro Ltd 10 Confidential
Making provisions for irrigation drains, electricity lines, telephone duct cables etc.
Along and across the roads
Facilitating evacuation of encroachment along the road sides
Landscaping along road sides
Construction of flyovers and airstrips
PWD undertakes two kinds of repairs for maintenance of buildings, viz., ordinary
repairs and special repairs. Ordinary repairs are carried out annually and include
activities like white washing, color washing, repairs of patches, replacement of small
broken parts, painting of doors, etc. Special repairs are less frequent and include
repairs to the damaged portions of the building, floors, doors and windows and
replacement of water supply and sanitary fittings.
Detailed Functions performed by various wings of HP PWD & HPRIDC is as below;
Road & Bridges Wing
Head of Road & Bridges wing is a Chief Engineer who looks after the functions of the wing which
are listed below;
Construction and maintenance of State buildings and their transfer from one
department to another
Construction and maintenance of building on behalf of other departments (except for
the Police Department)
Acquisition of land for construction of buildings and roads
Settlement of claims of contractors
Construction and maintenance of National Highways on behalf of Government of
India
Construction and maintenance of all roads in the State (except those owned by the
local bodies within municipal limits), bridges, ferries, tunnels, ropeways, causeways,
strategic roads, tactical roads, border area roads etc.
Toll levied by the State Government in connection with State subjects other then toll
levied by the Local bodies
Follow with Ministry of Railways with regard to development of railways and other
facilities provided by the Ministry of Railways
Construction of roads and bridges with funds made available by State Government
from budget allocations, by raising loan from Financial Institutions, by raising Bonds
and allocation under Central Road Funds (CRF)
IT Policy PWD, Himachal Pradesh
Wipro Ltd 11 Confidential
Construction of Rural links and development of Core networks through village roads
under PMGSY sponsored by Ministry of Rural Development, Govt. of India
Construction and maintenance of buildings of State Government departments with
funds provided under budget allocation, grant-in-aid/matching grant from Govt. of
India
Construction and maintenance of National Highways in the State with funds provided
by Ministry of Road Transport & Highways, Govt. of India
All aspects of tendering process right from the pre-qualification stage to the opening
of bids and its evaluation
Quality Control & Design Wing
Quality Check & Control Wing is headed by the rank of Engineer-in-Chief. It performs the
following functions;
Quality control wings monitors, manages and tracks all processes relevant to quality
assurance along with the entire execution of work.
Coordinates inspection processing and initiates corrective measures.
Create and maintain Quality Register
Capture test results/build test lab at sites
Generate National Quality Monitor/ State Quality Monitor
Track Action &Take report from site
To do inspection of site after complaint by any stakeholder of project.
National Highway Wing
Chief Engineer, National Highways looks after the improvement and maintenance of National
Highways. There are 2 NH circle and 5 NH divisions who reports to CE. The CE-NH reports to E-in-
C.
The functions of this wing are as follows;
Reduce the line of communication between the GoI and state authorities
Achieve efficiency in implementation by avoiding cumbersome and outdated
delegations for administrative and technical sanction which limit the ability of the
HPPWD to respond quickly
Achieve uniform maintenance & construction standard on National Highways
IT Policy PWD, Himachal Pradesh
Wipro Ltd 12 Confidential
Architecture Wing
Head of Architecture wing is Chief Architect who looks after the activities of the wing listed
below;
Generate Building Designs
Generate Preliminary Sketch/Concept Note/Master Plan/ Working Drawing/Detail
Drawing
It helps to maintain building designs/drawings and make them available centrally
It also assists to provide drawings for the estimate preparation
Generate feasibility report for any project undertaken by PWD or RIDC
Coordinates with other department (such as electrical, water & sanitation) for
Planning and estimate preparation
Arbitration Wing
Superintending Engineer Arbitration Circle Solan deals with the entire arbitration cases of the
Department viz.
Entry of Court Cases & Follow up actions
All the court cases registered against the department are centrally maintained in this
wing
It maintains the details of court case, status and make available to reporting seniors if
required.
Electrical Wing
Superintending Engineer (Electrical) controls the works related to electrical installation, central
heating, air conditioning, lifts, fire-fighting, fire alarm system, L.T. Sub-Station, Public Address
system and CCTV systems in all Govt. residential & non-residential buildings. There are two
electrical circles and 5 electrical divisions.
Mechanical Wing
Superintending Engineer (Mechanical) controls the works related to this wing. SE (Mechanical)
reports to CE (Road & Bridges). There are one mechanical circle and two mechanical divisions.
IT Policy PWD, Himachal Pradesh
Wipro Ltd 13 Confidential
4 Recommendation and Road Ahead
This section shall give a listing of the issues noted and illustrate actions that need to be taken by PWD for effective implementation of IT. Benefits of taking the proposed actions have also been listed to give reader an understanding of thought process behind the proposed action.
Public Works Department of Himachal Pradesh is primarily responsible for executing following
different types of development works;
Construction and maintenance of new roads, national highways & bridges
Construction and maintenance of residential and non-residential buildings
Construction of roads under centrally sponsored schemes
Undertaking deposit contribution works relating to different government
departments as well as of other local bodies
Resettlement works due to natural calamities like flood, earth quakes etc.
Construction of roads under employment guarantee scheme
Fixation of rent of private premises requisitioned for housing government offices
Developing parks and gardens in the vicinity of important public buildings and
landscaping of grounds
Providing reservation facility of government rest houses and circuit houses
To permit construction of approaches on both sides of roads to private individual,
other institutions, factories, petrol pumps etc.
Making provisions for irrigation drains, electricity lines, telephone duct cables etc.
Along and across the roads
Facilitating evacuation of encroachment along the road sides
Landscaping along road sides
Construction of flyovers and airstrips
PWD undertakes two kinds of repairs for maintenance of buildings, viz., ordinary
repairs and special repairs. Ordinary repairs are carried out annually and include
activities like white washing, color washing, repairs of patches, replacement of small
broken parts, painting of doors, etc. Special repairs are less frequent and include
repairs to the damaged portions of the building, floors, doors and windows and
replacement of water supply and sanitary fittings.
IT Policy PWD, Himachal Pradesh
Wipro Ltd 14 Confidential
The list of different processes for PWD is as below:
Sr.
No. Name of the Process
A Execution Process
1. Preparation of estimate for Road work and its Administrative Approval(State Budget)
2. Preparation of Estimate for Bridge Works (Original Work) and its Administrative Approval (State Budget)
3. Preparation of estimate for Original Building Work & its Administrative Approval
4. Preparation of detail estimate and its technical Sanction
5. Checking of Estimations / DPR(State Budget)
6. Preparation and Approval of Structural Design
7. Revision of Estimate & Approval(State Budget)
8. Time Extension request under contract(State Budget/PMGSY/NABARD)
9. Execution of Deposit Work
10. Progress monitoring (Physical and Financial)
11. Annual Maintenance Plan(Roads)
12. Preparation of Annual Plan
13. Enlistment of Contractor (C & D level)
14. Enlistment of Contract(A & B level)
15. Tendering and Contract Management
16. Deviation in work(State Budget, NABARD)
17. Approval of works under CRF, ISC, EI scheme (Ministry of Roads, Transport & Highway)
18. Release of funds under CRF / Interstate Connectivity / Economical Important scheme
IT Policy PWD, Himachal Pradesh
Wipro Ltd 15 Confidential
19. Approval of works under NABARD( Rural Infrastructure Development Fund – RIDF)
20. Release of funds by NABARD under RIDF
21. Approval of work under PMGSY
22. Payment under PMGSY
23. Release of fund under PMGSY
24. Purchase Plan
25. Purchase Of Material
26. Issue of material
27. Approval for repair of Government vehicles / Machinery
28. Preparation of estimate for Bridge work and its approval (Mechanical work)
29. Purchase of Machinery/Vehicles
30. Annual maintenance Plan for Electrical Work
31. Preparation of Estimate for electrical installation at site and its approval
32. Preparation of estimate for NH works
33. Billing & Payments(NH)
34. Annual Plan for NHs( Ministry of Road & Highway, GOI)
35. NOC for retail outlet / access to private properties / construction of new buildings
36. Land Acquisition process of National Highway( Under the National highway act,1956)
37. Release of NOC(Other than NH)
38. Estate Office
39. Revision of SOR
40. Issue of MBs
41. Processing of complaints- Vigilance Cell
42. Requisition of Vehicles
43. Requisition of IT equipment
IT Policy PWD, Himachal Pradesh
Wipro Ltd 16 Confidential
44. Process of Arbitration
45. Meetings Management
B Financial Process
1. Budget Allotment
2. Billing and Payment
3. Audit of Records
4. Release of LOC
5. Reconciliation of expenses
6. Payment under establishment(other than salary)
C Common Process
1. File Movement in PWD Office
2. RTI processing
3. Assembly Question
4. Procedure to defend court cases in subordinate courts
5. Procedure to defend court cases in High court / Supreme Court
6. Process of E-Samadhan
7. Petty Purchase
8. Purchase of items through DGSND
D Quality Control Process
1. Technical testing of material
2. Inspection of Work
3. Inspection of work based on complaints
4. Inspection of PMGSY Work
E HPRIDC Process
1. Approval of Project under HPRIDC
IT Policy PWD, Himachal Pradesh
Wipro Ltd 17 Confidential
2. Approval of DPR under HPRIDC
3. Tendering & Contract agreement of Consultant under HPRIDC
4. Tendering & contract agreement of Contractors under HPRIDC(up gradation work)
5. Billing & payment of contractor under HPRIDC
6. Time Extension based on Variation under HPRIDC
7. Approval Of variation Quantity
8. Approval of Black spot work under HPRIDC
9. Periodic Maintenance work under HPRIDC
10. Billing & Payment of periodic Maintenance Work
11. Dispute Management under HPRIDC
12. Complete work flow of up gradation work under HPRIDC
F Human Resource Process
1. Service Record Book
2. Earned Leave
3. Transfer of Employee
4. Sanction of Leave other than Earned Leave
5. Promotion(Group C Employees)
6. GPF Management
7. Loan/Withdrawal through GPF
8. Promotion (Group A&B Employees)
9. Release of Pension- Payment Order (Gratuity, Pension, Commutation of Pension)
10. No objection Certificate for Pensioner Benefits
11. GPF – Payment on Retirement
12. GPF Number Allotment
IT Policy PWD, Himachal Pradesh
Wipro Ltd 18 Confidential
4.1 Technology
On the basis of the identified solutions for the issues faced in the execution of the work of PWD, the technological recommendations have been devised as shall be illustrated in the subsequent sections.
Network Architecture
The applications shall be hosted at the SDC. All the Users on internet will access the application/interface servers located in the public zone and the departmental users on intranet shall be accessing the application from Sub Divisional offices, Circle, etc.
All the Branches will get terminated at the SDC. The Connectivity between the various branches / State Data Center / Disaster Recovery Centre will be as per the following Diagram
Networking forms the back-bone of any IT infrastructure setup in the current period. Data and functional integrity between the applications installed at different locations depends on the networking connectivity between the locations. Reliable and high bandwidth connectivity between all the offices of PWD will make a centralized architecture feasible that will remove duplicate data entry and make the information flow across the hierarchy smooth. However, it is important to note that the implementation of a state-wide network infrastructure is a part of national e-Governance programme; therefore PWD shall use HIMSWAN for the implementation
IT Policy PWD, Himachal Pradesh
Wipro Ltd 19 Confidential
its proposed ERP solution. HIMSWAN should be utilized as the communication backbone for connecting HPPWD offices (up to Divisional Office level). Offices outside the span of HIMSWAN Point of Presence (POP) can be connected through optimal connectivity means like Optical Fiber Cable (OFC) or leased lines as per requirement and availability. However, wherever, it is not possible to have network connectivity using these options, department can consider using broadband connection over VPN
But, looking at the pace of implementation and connectivity problem at the offices located at
remote locations, it is therefore suggested that all the proposed ERP solution shall have the
architecture that works in both offline and online mode with the central server at the State Data
Centre. The architecture should be such that it supports the synchronization of data with
centralized database when the systems work in offline mode to consolidate the data at the
central database (refer below Figure). The offline and online mode is dictated by the reliability
and bandwidth of the connectivity between the office and the central server. The offline mode
shall be case only when the required reliability and bandwidth is not available. It is hoped that
when the HIMSWAN implementation is fully implemented all the offices of PWD shall be
functioning in online mode.
IT Policy PWD, Himachal Pradesh
Wipro Ltd 20 Confidential
Solution Architecture
The application will be hosted on the Himachal State Data Center. The application will be
accessible to the administrator, department users, citizens and business. Various components of
the solution are shown on in the fig. below:-
IT Policy PWD, Himachal Pradesh
Wipro Ltd 21 Confidential
Users
Users of the application are department employees, Citizens and contractors etc.
o Citizens
The citizens can register themselves via Portal. Once registered, citizens will be able to log
into the Portal using their credentials and will access the portal services for which they
are authorized. Citizen registration or can fill applications and track the status of their
requests / road complaints through web browser as well as mobile devices via SMS. The
Portal will make the public content available to all users without authentication.
o Business Users (Contractors)
Contractor will register on the portal for the enlistment, submit bills online, submit
project progress reports any project related communication with the contractor will be
done through the online system.
o Departmental Users
Department users will access the application as per the predefined roles to take action on
the work-items and update the project status. Users will use system for their day to day
activities and generate MIS. Any departmental communication between the employees
will be done through the system.
Presentation Layer
The proposed solution will provide a way for users (PWD Employees, Contractors, Business and
Employees of PWD) to interact with the application. User interfaces are implemented using
different technologies to render and format data for users and to acquire and validate data
coming in from them. Under the proposed system a web based portal and Mobile based will
facilitate the communication between the Public Works Department and Business Entities and
Citizens of Himachal Pradesh.
Service Layer
The service components are the critical elements of the proposed model. These elements define
the way in which the request will be entertained, processed and finally executed.
o Service agents: When a business component needs to use functionality provided in an
external service, you may need to provide some code to manage the semantics of
communicating with that particular service. Service agents isolate the idiosyncrasies of
calling diverse services from your application, and can provide additional services, such
IT Policy PWD, Himachal Pradesh
Wipro Ltd 22 Confidential
as basic mapping between the format of the data exposed by the service and the format
the proposed application requires.
o Service interfaces: To expose business logic as a service, service interfaces are created,
that supports the communication contracts (message-based communication, formats,
protocols, security, exceptions, and so on) it’s different user’s require. Service interfaces
are sometimes referred to as business facades.
To-Be Processes
The proposed application will have embedded improved To-Be processes as the core mechanism
for the execution of work. These processes will detail out the optimum way by which the work
will be executed. The proposed ‘To-Be’ processes will define the work flow, the roles and
responsibilities of the service personnel – process owners, main and participating actors,
information and data flow, decision points, starting and completion criteria, constituent
activities, rules and regulations for the actors, workflow , service levels etc.
Business Layer
Application layer will be the technology within which the To-Be processes will be embedded. This
layer would define all the functionality and work flow of service delivery and contains all the
possible logics based on acts, rules, government orders, departmental orders, etc. This layer will
contain the defined way through which the user can interact with the application – provide
required input to the system and get output from the system. Also, this backend supports an
intelligent Management Information System (MIS) so as to perform the defined functionality for
monitoring and reporting associated with the selected services.
Additionally, this layer would interact directly with the application process and perform common
application services based on the service request. It will also ensure that effective communication
between all the components in a network is possible.
o Business entity components
The Proposed application requires data to be passed between components. The data is
used to represent real-world business entities, such as services and applications. The
business entities that are used internally in the application are usually data structures,
such as Datasets, Data Readers, or Extensible Markup Language (XML) streams, but they
can also be implemented using custom object-oriented classes that represent the real-
world entities your application has to work with, such as a service or application.
o Business components
Regardless of whether a business process consists of a single step or an orchestrated
workflow, the proposed application will require components that implement business
IT Policy PWD, Himachal Pradesh
Wipro Ltd 23 Confidential
rules and perform business tasks. Business components implement the business logic of
the application
Database Layer
The database layer will host any data that is persisted or consumed by the application. Relational
databases housing application data, content repositories, Directory, external storage are
examples of components that will be part of Database layer. This layer will be the centralized
data repository for the contents and associated attached documents by user department. Along
with the service related data, the repository will also hold the information documents along with
archives of the content available on the portal.
The data storage and handling will also be a backend task as defined by the system in specified
structure. Advantages of proposed service component based architecture:
Introduces one comprehensive data repository ensuring
Reduced duplication of effort
Removal of redundancy from the processes
Cross verification of information
Easy access to inter-departmental data
Reduced requirements for verification
Scope for innovations
Data access logic components
The application and the services will need to access a data store at some point during a business
process. It makes sense to abstract the logic necessary to access data in a separate layer of data
access logic components. Doing so centralizes data access functionality and makes it easier to
configure and maintain.
Components for security, operational management, and communication
The Proposed application will probably also use components to perform exception management, to authorize users to perform certain tasks, and to communicate with other services and applications
IT Policy PWD, Himachal Pradesh
Wipro Ltd 24 Confidential
Security Recommendations
Security can be sub-divided into two broad categories of Logical Security and Physical Security. The logical security can be defined as the electronic security to maintain data integrity and prevent any unauthorized access/modification of data. On the other hand, the physical security deals with security of the physical infrastructure and protects it from any physical damage
4.1.3.1 Logical Security
Logical Security comprises of security needed for the data and the applications from malicious/ harmful code or attacks or data on the network and the internet. It shall broadly comprise of the following components:
Firewall- A firewall is a dedicated appliance, or software running on another computer, which
inspects network traffic passing through it, and denies or permits passage based on a set of rules.
A firewall's basic task is to regulate some of the flow of traffic between computer networks of
different trust levels. As the firewall shall provide perimeter security at the Data Center. Due to
its relatively high importance in the system, the following design criteria have been decided for
this-
High Availability
Support for virtual firewall / sliced firewall functionality
Support for multiple types of VPN
Ability to handle different network segments
Intrusion Prevention System- An intrusion prevention system is a computer security device that
monitors network and/or system activities for malicious or unwanted behavior and can react, in
real-time, to block or prevent those activities. Network-based IPS, for example, will operate in-
line to monitor all network traffic for malicious code or attacks. When an attack is detected, it
can drop the offending packets while still allowing all other traffic to pass.
The intrusion prevention system offered shall need to include content filtering gateway to
provide protection against malicious content in the form of modified data packets, corrupt codes
etc. The Content Security Gateway scans data in real-time as it enters the network, unlike
traditional anti-virus software, which requires files to be written to disk before scanning
commences. It also provides effective protection against new blended attacks, which may render
systems vulnerable.
High Availability
Protection from zero day attacks
Detection from attacks such as TCP hijacking, Trinoo, TFN, SYN Floods etc.
Monitoring of various protocols such as TCP/IP, ICMP, UDP, FTP, RPC, DNS, HTTP, etc.
Protection against Viruses, Spam, Adware, Spyware, etc.
IT Policy PWD, Himachal Pradesh
Wipro Ltd 25 Confidential
Administration & Monitoring- Robust reporting capabilities, advanced notification options, and
an intuitive web-based console should be used to enable effective administration and monitoring
of the data center. An Enterprise Management Solution needs to be considered to facilitate
monitoring and administration of the IT infrastructure installed at the Data Centre. Care has to
be taken that a 24x7 Administration & Monitoring Capability is provided.
4.1.3.2 Physical Security
In addition to the logical security being offered to the data center from malicious/ harmful data
packets on the internet, the physical infrastructure would need to be protected from physical
threats as well. Physical security is the protection of personnel, hardware, programs, networks,
and data from physical circumstances and events that could cause serious losses or damage to
an enterprise, agency, or institution. This includes protection from fire, natural disasters,
burglary, theft etc. Moving in this direction, Physical Security shall comprise of the following
components:
Environment
Careful site selection and accommodation planning of a purpose-built computer
installation shall be conducted. Reference to the security specifications for construction
of special installation or office as standard should be made
Data centres and computer rooms shall have good physical security and strong protection
from disaster and security threats, whether natural or caused by other reasons, in order
to minimise the extent of loss and disruption.
Backup media containing business essential and/or mission critical information shall be
sited at a safe distance from the main site in order to avoid damage arising from a disaster
at the main site
Equipment Safety
All information systems shall be placed in a secure environment or attended by staff to
prevent unauthorised access. Regular inspection of equipment and communication
facilities shall be performed to ensure continuous availability and failure detection
IT Policy PWD, Himachal Pradesh
Wipro Ltd 26 Confidential
Staff in possession of mobile device or removable media for business purposes shall
safeguard the equipment in his/her possession, and shall not leave the equipment
unattended without proper security measures.
IT equipment shall not be taken away from sites without proper control
Physical Access Control
A list of persons who are authorised to gain access to data centres, computer rooms or
other areas supporting critical activities, where computer equipment and data are located
or stored, shall be kept up-to-date and be reviewed periodically
All access keys, cards, passwords, etc. for entry to any of the information systems and
networks shall be physically secured or subject to well-defined and strictly enforced
security procedures
All visitors to data centres or computer rooms shall be monitored at all times by
authorised staff. A visitor access record shall be kept and properly maintained for audit
purpose
All staff shall ensure the security of their offices. Offices that can be directly accessed from
public area and contain information systems or information assets should be locked up
when not in use or after office hours
In line with the above conditions the following measures need to be taken-
Restricting the entry of personnel in the room by allowing only pre-authorized
officials/staff into the Data Centre using authentication procedures.
In addition to this a 24 x 7 surveillance comprising of CCTVs and sensors (heat,
temperature, etc.) are needed to keep track of all conditions in the data center- Entire
Data Centre should be covered using Closed Circuit Video Surveillance, Recording and
Replay facilities. Use of Motion Sensors is preferable.
The CCTV surveillance system should support operations in duplex communication
(record and relay) mode.
The recorded video should be stored for a minimum period of 6 months.
A 24-hour battery power backup is required for the access control system including the
electric door lock(s).
The access control system should also be connected to the UPS if it is installed.
The entrance to the building shall be guarded by the Building Management’s Security
Guards. At the reception, guards provided by the State shall be deployed and shall capture
details of all visitors. Scanning of all personnel before entry into data Centre would be
mandatory.
IT Policy PWD, Himachal Pradesh
Wipro Ltd 27 Confidential
Heavy-duty electric lock has been recommended for the main entrance doors. With time
delay setting, the lock would effect after time is over. The lock must be fail-safe type.
Panic Bolt should be provided at the emergency exits.
4.1.3.3 Access Control Security
Data Access Control
Access to information shall not be allowed unless authorized by the relevant information
owners
Data access rights shall be granted to users based on a need-to-know basis
Data access rights shall be clearly defined and reviewed periodically. Records for access
rights approval and review shall be maintained
Access to information systems containing information classified CONFIDENTIAL or above
shall be restricted by means of logical access control
Authentication
Access to classified information without appropriate authentication shall not be allowed
Authentication shall be performed in a manner commensurate with the sensitivity of the
information to be accessed
Consecutive unsuccessful log-in trials shall be controlled.
User Identification
Each user identity (user-ID) shall uniquely identify only one user.
Users are responsible for all activities performed with their user-IDs
User Privileges Management
Procedures for approving, granting and managing user access including user
registration/de-registration, password delivery and password reset shall be documented
All accounts shall be revoked after a pre-defined period of inactivity
User privileges shall be reviewed periodically
The use of special privileges shall be restricted and controlled
IT Policy PWD, Himachal Pradesh
Wipro Ltd 28 Confidential
Password Management
Passwords shall not be shared unless necessary (e.g., helpdesk assistance, shared PC and
shared files). The risk of sharing passwords is that it increases the probability of security
being compromised
Passwords shall always be well protected when held in storage. Passwords shall be
encrypted when transmitted over an un-trusted communication network
All vendor-supplied default passwords shall be changed before any information system is
put into operation
All passwords shall be promptly changed if they are suspected of/are being compromised,
or disclosed to vendors for maintenance and support
Mobile Computing and Remote Access
Appropriate security measures shall be adopted to avoid unauthorized access to or
disclosure of the information stored and processed by these facilities. Authorized users
should be briefed on the security threats, and accept their security responsibilities with
explicit acknowledgement
Employees are prohibited from connecting workstations and mobile devices to external
network by means of communication device, such as dial-up modem, wireless interface,
or broadband link
Security measures shall be in place to prevent unauthorized remote access to Department
information systems and data
Unauthorized computer resources including those privately-owned shall not be
connected to Department internal network. If there is an operational necessity, approval
from Department should be sought
Application List
The main objective of introducing IT in an organization is to bring efficiency and transparency in the core and support business functions. PWD needs specific software applications to support its core and support business, therefore a list of core and support applications have been proposed
A. Primary Applications
Budget Allocation and Management
Work Execution
Project Planning
Road and Bridge Inventory
Routine Maintenance Management
IT Policy PWD, Himachal Pradesh
Wipro Ltd 29 Confidential
Finance and Accounts Management
Quality and Control
Purchase and Store
Traffic Management System
Tools and Machinery
Grievance System
Legal and Arbitration
HRMS
B. Base Application
Web Portal
Digitization of SOR
Contractor Empanelment System
User Dashboard and Profile
MIS
User Management Module
IT Policy PWD, Himachal Pradesh
Wipro Ltd 30 Confidential
Application Description
IT Policy PWD, Himachal Pradesh
Wipro Ltd 31 Confidential
Process Module Mapping
Module / Sub Module Description Mapped To-Be Process
Work Execution
Estimation Preparation Technical sanction &
approval Architecture Design Process Tender Management Work Allocation &
Agreement Progress Monitoring of Work Work Deviation Time Extension
This module takes care of all the work execution related activities of Department like estimation and DPR preparation, technical sanction and approval of competent authorities.
1. Preparation of estimate for Road work and its Administrative Approval(State Budget)
2. Preparation of Estimate for Bridge Works (Original Work) and its Administrative Approval (State Budget)
3. Preparation of estimate for Original Building Work & its Administrative Approval
4. Preparation of detail estimate and its technical Sanction
5. Checking of Estimations / DPR(State Budget)
6. Preparation and Approval of Structural Design
7. Revision of Estimate & Approval(State Budget)
8. Time Extension request under contract(State Budget/PMGSY/NABARD)
9. Execution of Deposit Work 10. Progress monitoring
(Physical and Financial) 11. Preparation of Annual Plan 12. Deviation in work(State
Budget, NABARD) 13. Approval of works under
CRF, ISC, EI scheme (Ministry of Roads, Transport & Highway)
14. Approval of works under NABARD( Rural Infrastructure Development Fund – RIDF)
IT Policy PWD, Himachal Pradesh
Wipro Ltd 32 Confidential
15. Approval of work under PMGSY
16. Approval for repair of Government vehicles / Machinery
17. Preparation of estimate for Bridge work and its approval (Mechanical work)
18. Preparation of Estimate for electrical installation at site and its approval
19. Preparation of estimate for NH works
20. Annual Plan for NHs( Ministry of Road & Highway, GOI)
21. NOC for retail outlet / access to private properties / construction of new buildings
22. Land Acquisition process of National Highway( Under the National highway act,1956)
23. Release of NOC(Other than NH)
24. Issue of MBs 25. Meetings Management 26. Approval of Project under
HPRIDC 27. Approval of DPR under
HPRIDC 28. Time Extension based on
Variation under HPRIDC 29. Approval Of variation
Quantity 30. Approval of Black spot work
under HPRIDC 31. Periodic Maintenance work
under HPRIDC
Asset management
Annual maintenance plan
This module shall handle the roads inventory of the state. It
1. Annual Maintenance Plan(Roads)
IT Policy PWD, Himachal Pradesh
Wipro Ltd 33 Confidential
Tools and Machinery Routine maintenance
System Road and Bridge Asset
Register (GIS based) Traffic Information system
shall store data pertaining to roads inventory, roads surface condition, pavement, deterioration, condition of bridges, etc. in respect of all the roads in the state. It shall provide comprehensive MIS in respect of the roads in the state. The outputs shall be viewable on textual and map interfaces
2. Purchase of Machinery/Vehicles
3. Annual maintenance Plan for Electrical Work
4. Estate Office 5. Requisition of Vehicles 6. Requisition of IT equipment
Project Planning
Activity Planner Work Flow Management Resource Allocation MIS reporting
This module will take care planning of project activities and define deliverables and further workflow / resource required for completion of activities.
1. File Movement in PWD Office
Financial & Accounts Management
Budget Pre Planning Budget Approval Process Budget Allocation System Budget Monitoring Billing and payment to
Contractor Billing and payments
This Module will improve governance by providing real – time financial information that can be used to administer programmes effectively, formulate budgets and manage resources. Financial and Accounts Management System will computerize the key aspects of budgeting and accounting operations
1. Budget Allotment 2. Billing and Payment 3. Audit of Records 4. Release of LOC 5. Reconciliation of expenses 6. Payment under
establishment(other than salary)
7. Billing & Payments(NH) 8. Release of funds under CRF
/ Interstate Connectivity / Economical Important scheme
9. Release of funds by NABARD under RIDF
10. Payment under PMGSY 11. Release of Fund under
PMGSY 12. Billing & payment of
contractor under HPRIDC
IT Policy PWD, Himachal Pradesh
Wipro Ltd 34 Confidential
13. Billing & Payment of periodic Maintenance
Purchase & Store The purchase and Store Management System should consist of computerized database of the store inventory, including records of receipts & issues, stock-in-hand etc.
1. Purchase Plan 2. Purchase Of Material 3. Issue of material 4. Petty Purchase 5. Purchase of items through
DGSND
Quality and Control This module will help in working of quality and control cell like testing of material and test report generation
1. Technical testing of material 2. Inspection of Work 3. Inspection of work based on
complaints 4. Inspection of PMGSY Work
Scheme Management Scheme Management System will comprise of Master Data for various Scheme PMGSY and Scheme Codes
To manage Scheme wise database like
1. Scheme Codes 2. Start and End Date 3. Budget 4. Approval and Authorization 5. Physical and Financial
Reports
Digitization of SOR This module shall manage the detail of category wise and item wise schedule rates of all construction items being followed by the department of PWD or any other engineering wing
1. Revision of SOR
Contract Management This module shall manage the inventory of all the approved contractors PWD and
1. Enlistment of Contractor (C & D level)
2. Enlistment of Contract(A & B level)
IT Policy PWD, Himachal Pradesh
Wipro Ltd 35 Confidential
RIDC, registration of new contractors etc.
3. Tendering and Contract Management
4. Tendering & Contract agreement of Consultant under HPRIDC
5. Tendering & contract agreement of Contractors under HPRIDC(up gradation work)
Legal and Arbitration 1. Procedure to defend court cases in subordinate courts
2. Procedure to defend court cases in High court / Supreme Court
3. Dispute Management under HPRIDC
4. Process of Arbitration 5. RTI Processing 6. Processing of complaints-
Vigilance Cell
IT Policy PWD, Himachal Pradesh
Wipro Ltd 36 Confidential
Database Description
In line with the application description developed in the previous section, the database
description has been defined as listed in the following table (it defines the data that shall be
stored in different groups and their interlink ages).
Data base Instance Accessing departmental Application
Wings or Branches using the application
Full Access Partial Access
Work execution Engineering Engineering Project Management
Project Planning Project Management
Project Management/ Engineering
Project Management
Tendering Tendering Engineering Project Management
Finance and Accounts Management
Finance and Billing
Finance/Engineering Project Management
Budget Allocation
and Management
Project Management
Finance/Engineering Project Management
Quality and Control Quality Assurance and Inspection
Engineering
RTI ,Legal Cases
,Grievance System
and Arbitration
RTI and Legal Cases
Legal/Engineering
Human Resource and Management
Human Resource and Management
HRM
Road and Bridge
Inventory
Asset Management
Engineering Finance/Engineering/GIS
IT Policy PWD, Himachal Pradesh
Wipro Ltd 37 Confidential
Data base Instance Accessing departmental Application
Wings or Branches using the application
Routine Maintenance Management
Engineering GIS and Engineering
Purchase and store Engineering Project Management/ Engineering
Finance/Engineering
Tools and
Machinery
Engineering Engineering Finance/Engineering
Contractor
Empanelment
System
Engineering Engineering Finance/Engineering
MIS & Miscellaneous
MIS & Miscellaneous
MIS and Engineering
All the wings
User Management User Management
User Management All the wings
IT Policy PWD, Himachal Pradesh
Wipro Ltd 38 Confidential
4.2 Standards
The objective of this section is to provide a view of the standards that need to be taken care of
the by software development agency to ensure future integration with applications in other
departments and/or the new applications that shall be implemented in the future
Application and Development Standards
Software applications shall have the capability to securely exchange information and integrate or
interoperate with other applicable or related software applications. The vendor shall develop and
deploy the Software applications with the following:
Vendor shall develop on open interface, interoperable Service oriented architecture
Common, proven, pervasive, and open software products (programming, database, and
productivity software) to provide a consistent framework to enable integration,
communication, and interoperability.
Non-proprietary technologies, wherever possible, to facilitate integration and
interoperability
Use of XML formats for data transferring between different databases
Application should be web browser based
Application should have n-tier architecture
Application with middleware component for purpose of integration
Software applications should utilize target platform and network operating systems to
allow for common, open-standards-based, management tools that are deployable at
State Data Centre and can easily integrate with Enterprise Architecture domains and their
extension to management of applications
Integration Standards
For integration of different applications, use XML, ebXML standards. Using these standards
applications are required to be seamlessly integrated.
IT Policy PWD, Himachal Pradesh
Wipro Ltd 39 Confidential
Database Standards
Data management is the management of all data/information in an organization. It includes data
administration, the standards for defining data and the way in which people perceive and use it.
The database connectivity and report and analysis depend on the data base design capability.
Therefore the vendor shall follow following standards but not limited to with regard to database
connectivity or reporting & analysis. The following database capability standards are
recommended.
Availability
Database Server should be highly available with every processing node providing full view
of data.
Database Server must support Clustering exploiting rapidly emerging disk storage and
interconnect technologies
Manageability
Single system Management view which could be a part of the overall Enterprise
Management System
A centralized, lightweight console as a primary interface for performing all management
tasks
Centralized management of user privileges
Scalability
Flexibility and effortless scalability
Security
Restrictive data access that enables users from different departments to have secure,
direct access to mission-critical data sharing
Encryption capabilities while transferring data over networks, and ability to encrypt data
stored in the database at the column level
Public Key Infrastructure (PKI) support
Support for enhanced authentication
Comprehensive auditing for inserts/ deletes/ updates / selects to quickly spot and
respond to security breaches.
Automated Disaster Recovery solution to maintain consistent transactional copies of
database
Operational Features
Database must function on Multiple Operating System Platform
Ability to index, search, and analyze data
IT Policy PWD, Himachal Pradesh
Wipro Ltd 40 Confidential
Support different partitioning schemes to split large volumes of data into separate pieces
or 'partitions' which can be managed independently
Embedded data mining capabilities
Queue management should support queue persistence, queue logging, recoverability etc,
conforming to open standards
Database Connectivity – Defines the protocol or method in which an application connects to
a data store or database.
Java Database Connectivity (JDBC) – JDBC provides access to virtually any tabular data
source from the Java programming language. It provides cross-DBMS connectivity to a
wide range of SQL databases, and other tabular data sources, such as spreadsheets or flat
files.
Open Database Connectivity (ODBC) – A database programming interface from Microsoft
that provides a common language for Windows applications to access databases on a
network. ODBC is made up of the function calls programmers write into their applications
and the ODBC drivers themselves.
Object Linking and Embedding/Database (OLE/DB) –OLE/DB allowed connectivity to
ODBC-based SQL providers/sources as well as other formats such as text and comma
delimited.
Reporting and Analysis – Consist of the tools, languages and protocols used to extract data
from a data store and process it into useful information.
Extensible Business Reporting Language (XBRL) – Extensible Business Reporting
Language (XBRL is an open specification which uses XML-based data tags to describe
financial statements for both public and private companies.
Java Online Analytical Processing (JOLAP) – JOLAP is a Java API for the J2EE environment
that supports the creation and maintenance of OLAP data and metadata, in a vendor
independent manner.
Online Analytical Processing (OLAP) – Decision support software that allows the user to
quickly analyze information that has been summarized into multidimensional views and
hierarchies.
XML for Analysis – XML for Analysis uses the Simple Object Access Protocol (SOAP) to let
Web browser based programs access backend data sources for data analysis. The
specification allows companies to build online analytical processing (OLAP) and data
mining applications that work over the web.
IT Policy PWD, Himachal Pradesh
Wipro Ltd 41 Confidential
Backup Policy
Objective
To counteract interruptions to business activities and to critical business processes from the
effects of major failures or disasters; to maintain the integrity and availability of information
processing and communication services
Purpose
Routine procedures should be established for carrying out the agreed back-up strategy taking
back-up copies of data and rehearsing their timely restoration, logging events and faults and,
where appropriate, monitoring the equipment environment. In order to safeguard
information and computing resources from various business and environmental threats,
systems and procedures shall be developed and implemented for backup of all business data,
related application systems and operating systems software. This shall be done on a
scheduled basis and in a standardized manner across the organization
Approach and Strategy
Back‐up of information (user‐level and system‐ level information) and software contained in the Information system shall be taken at defined frequency and protected at storage location.
Backup should be taken for all core applications, databases etc.
Backup should be kept for adequate number of years
The back‐up information shall be tested at a specified frequency in accordance with
agreed back‐up policy to verify media reliability and information integrity
The backup information shall be selectively used in the restoration of information
system functions as a part of contingency plan testing
The backup copies of the operating system and other critical information system
software shall be stored in a separate facility or in a fire‐proof container that is not
collocated with the operational software
The system backup information shall be protected from unauthorized modification
Backup media should be stored in a safe, secure environment, in accordance with
manufacturers’ specifications
Information stored on media that needs to be available longer than the media lifetime
(in accordance with manufacturers’ specifications) should be also stored elsewhere to
avoid information loss due to media deterioration
IT Policy PWD, Himachal Pradesh
Wipro Ltd 42 Confidential
Data Retention – Data retention policy will identify documents that need to be maintained
and for how long certain documents should be kept and how they should be destroyed
Temporary Records Temporary records include all business documents that have not
been completed. Such include, but are not limited to written memoranda, Draft cost
estimation, project plans, reminders, to-do lists, report and calculation drafts, interoffice
correspondence regarding a client or business transaction, and running logs
Final Records Final records include all business documents that are not superseded by
modification or addition. Such include, but are not limited to: documents given to any
third party not employed by Organization, or government agency; final memoranda and
reports; correspondence; minutes of meeting; design/plan specifications; cost estimates;
etc. All accounting records shall be deemed final. All final records should be archived after
specific time period.
Permanent Records Permanent records include all business documents that define
Organization’s scope of work, expressions of professional opinions, research and
reference materials etc. such records should be retained for permanently and should be
updated as per requirements
Employment, Employee, and Payroll Records Employment records include, but are not
limited to job announcements and advertisements; employment applications,
background investigations, resumes, and letters of recommendation of persons not
hired; etc. such records should be retained permanently.
Data retention duration: - Data should be retained so long as the law requires or for as
long as you actually have use for them, and not a moment longer.
Localization & Language Technology Standards
Keyboard Layout: INSCRIPT Keyboard layout. However, Output of any user specific
keyboard layout must conform to Unicode current version.
Fonts: Cross platform Open Type Fonts must be used in applications. Proprietary fonts
should not be adopted unless the vendor assures interoperability. PWD should only adopt
fonts that have been tested on different platforms for the relevant scripts.
Identity & Access Management- The appropriate Identity Aggregations and
Synchronization should be used to integrate systems to share their identity information.
Single sign-on should be provided to the user for accessing the systems. Single Sign On to
make it easier for user and avoiding the need for him to write down complex password
since it becomes difficult to remember multiple passwords. Only in case of performing
critical operation or accessing sensitive information user may be asked to provide
credentials again.
IT Policy PWD, Himachal Pradesh
Wipro Ltd 43 Confidential
Network Standards
As the solution is accessed by different stake holders in different environment and in different
networks like HIMSWAN, internet, etc. therefore the solution should support the following
Network Services technology, Service Transport technologies and all network devices. For
networking use TCP/IP (IPv4/IPv6) protocol whereas for internet, HTTP/S, HTML, J2EE, SOAP,
WSDL, UDDI, W3C standards need to be followed. The Solution Provider shall follow open
standards as far as possible.
Standards to be followed are summarized as follows:
Category Current Standards
Internet HTTP/S, HTML, J2EE, SOAP, WSDL, UDDI, W3C
Integration XML, ebXML
Messaging JMS, GoI Gateways
Forms Xforms, (PDF/XDF)
Data Security IT Act 2000 Standards
Mail Protocols SMTP, POP3,IMAP
Workflow XPDL, BPEL4WS
Databases ORDBMS
Directory LDAP
Wireless WAP,802.11
Networking TCP/IP (IPv4/IPv6)
Security Standards
Security defines the methods of protecting information and information systems from
unauthorized access, use, disclosure, disruption, modification, or destruction in order to provide
integrity, confidentiality and availability. The vendor shall refer the IT Act 2000 standards or latest
IT Policy PWD, Himachal Pradesh
Wipro Ltd 44 Confidential
published by Government of India for data security. The following standards and digital signature
technologies not limited to shall be followed by the vendor.
Certificates / Digital Signature – Software used by a certification authority (CA) to issue
Digital certificates and secure access to information. The evolution of Public Key
Infrastructure (PKI) is based on the verification and authentication of the parties involved in
information exchange. Examples of Certificates/Digital Signature technologies include:
Digital Certificate Authentication – Authentication implementation for controlling access
to network and internet resources through managing user identification. An electronic
document, digital certificate, is issued and used to prove identity and public key
ownership over the network or internet.
FIPS 186 – The Digital Signature Standard (DSS) specifies a digital signature algorithm
(DSA) appropriate for applications requiring a digital, rather than written, signature. The
DSA authenticates the integrity of the signed data and the identity of the signatory. The
DSA may also be used to prove that data was actually signed by the generator of the
signature. Additional references: Draft ANSI X9.30199x Part 1 and ISO/IEC
JTC1/SC27/WG2, Project 1.27.08 Digital Signature with Appendix.
Secure Sockets Layer (SSL) – An open, non-proprietary protocol for securing data
communications across computer networks. SSL is sandwiched between the application
protocol (such as HTTP, Telnet, FTP, and NNTP) and the connection protocol (such as
TCP/IP, UDP). SSL provides server authentication, message integrity, data encryption, and
optional client authentication for TCP/IP connections.
Supporting Security Services – These consist of the different protocols and components to
be used in addition to certificates and digital signatures. The designed and deployed solution
must support all the security services technologies which include the following.
Secure Multipurpose Internet Mail Extensions (S/MIME) – Provides a consistent way to
send and receive secure MIME data. Based on the Internet MIME standard, S/MIME
provides cryptographic security services for electronic messaging applications:
authentication, message integrity and non-repudiation of origin (using digital signatures)
IT Policy PWD, Himachal Pradesh
Wipro Ltd 45 Confidential
and data confidentiality (using encryption). S/MIME is not restricted to mail; it can be
used with any transport mechanism that transports MIME data, such as HTTP.
Transport Layer Security (TLS) – Standard for the next generation SSL. TLS provides
communications privacy over the Internet. The protocol allows client/server applications
to communicate in a way that is designed to prevent eavesdropping, tampering, or
message forgery.
Web Services Security (WS Security) – Describes enhancements to SOAP messaging to
provide message integrity, message confidentiality, and single message authentication.
These mechanisms can be used to accommodate a wide variety of security models and
encryption technologies including X.509, Kerberos, and SAML.
Security Assertion Mark-up Language (SAML) – An XML-based framework for exchanging
security information expressed in the form of assertions about subjects, where a subject
is an entity (either human or computer) that has an identity in some security domain.
SAML is expected to play a key role in the Enterprise wide-Authentication initiative, and
is supported by both the Liberty Alliance and WS Security.
Performance Requirement
The proposed solution components should be scalable horizontally and vertically to take the
solution from Pilot to full-scale implementation.
Architecture Scalability -Architecture provides the Scalability to support additional users,
additional infrastructure (i.e. Hardware servers and other components), and additional
application components. Scalability is supported at the Database Layer, Application Layer
& Messaging Layer.
Application Scalability- The architecture should be scalable and it is necessary to look into
same application components/instances that be can be loaded on multiple servers to
absorb the more transactional load.
The software products scalability and performance- The product used /Application
which are using/developed shall have Replication feature so that it will be used by
IT Policy PWD, Himachal Pradesh
Wipro Ltd 46 Confidential
directory servers to improve performance, scalability, availability, and reliability. The
replication should have following:
o Redundancy of information - Replicas back up the content of their supplier
servers.
o Faster searches - Search requests can be spread among several different servers,
instead of a single server. This improves the response time for the request
completion.
o Security and content filtering - Replicas can contain subsets of the data in a
supplier server
IT Policy PWD, Himachal Pradesh
Wipro Ltd 47 Confidential
4.3 Training
Training programs shall help prepare the employees for working on the application. The training
programs need to be held by Vendor or be arranged by Vendor with an institute specializing in
such training.
The training content shall be different for the employees as per their designation. Depending on
the category of officers they can be categorized in –
Top Executive cum Management level
The supervision level, middle management and executive level
All other employees
Training will include the following
a. Imparting training in Information Communication Technology (ICT) which includes basic
computer training, advance computer training, Business Process related training,
application specific training etc.
b. Such trainings and skills will be imparted to all levels of HPPWD officials involved in the
processes pertaining to the selected wing or divisions.
c. Prepare and organize training programs to facilitate the officials of HPPWD in the efficient
usage of the new system
d. Implementation Partner shall include the learning from past projects implemented in
other states and update the necessary changes in the training.
e. Training shall encompass the knowledge of basic functionality of application to be
developed, Guidelines and other back-end processes.
f. Training shall also be provided for RDBMS, hardware, IT infrastructure basic trouble
shooting activities etc.
g. Trainings shall be provided to all the new employees as and when joining the department.
h. Implementation Partner would also be required to develop user manuals and computer
based tool kits, Presentations and videos to promote self-learning and assist training
participants in undergoing the training.
IT Policy PWD, Himachal Pradesh
Wipro Ltd 48 Confidential
Training Approach
Programme Training Type Objective of Training Remarks
Awareness
Programs
Basic
Computer
Training
The purpose of this training is to
acquaint and aware HPPWD
officials employees with computer
systems (hardware, internet
browsing, using email and basic
software tools like MS Office,
adobe etc.). The effort will be
concentrated towards providing
exposure to computers especially
to ground level functionaries like
draftsman, head draftsman etc.
During the short
term capacity
building program,
core team member
would be identified
based on the
interest level as well
as assessment result
of training provided
to them
Application
Specific
Training
Specialised
Computer
Training
The training of ICT-IIS application to
be developed under this project is
envisaged compulsory for HPPWD
official cutting across departmental
hierarchy. The training is proposed
to acquaint and train the work
force with the various modules of
ICT-IIS, RDBMS, IT infrastructure,
GIS system etc. These skill set
should be enhanced for the core
group identified during the basic
computer training.
Once core team is
identified, a training
plan shall be made
for the members of
the core group. This
would enable core
group in providing
technical support to
the end users,
manage all the
existing applications
and application to be
implemented in near
future.
Training as
Domain
Knowledge
Experts
Advance
Computer
Training &
Process
Related
Trainings
Keeping in view the enormous task
of driving e-Governance in line with
the overall spirit of service
orientation most departments are
inadequately equipped in terms of
personnel and the skill-sets needed
to handle the host of issues
IT Policy PWD, Himachal Pradesh
Wipro Ltd 49 Confidential
involved. To ensure successful e-
Governance in the HPPWD, it is
suggested that at-least 10% of the
total employees in the department
be identified as e-champion. The e-
Champions should be equipped
with advance skill like;
Project Management, Web
Technologies Management,
Process Reforms Management,
Data Security & Disaster Recovery
Management
Retraining of Existing Staff
Training programs will have to be an ongoing feature in PWD especially in the light of rapid
changes in technologies and applications.
After expiry of a pre-defined period since the last training held for a wing/branch or after major
up gradation/ changes are implemented in the system, the employees of the concerned
wing/branch would need to be re-trained in the system by the vendor or the institute arranged
by the vendor.
It is also being suggested that a self-automated module of e-training be developed for training
which can be used by the employees as and when required to refresh his/her skill
4.4 Progress Monitoring Parameters
After finalization of the IT strategy as per the vision for IT implementation in PWD, it is essential
to track the Actual progress made in comparison to the Planned Progress. For this, it is necessary
to decide on Key Performance Indicators (KPI) for the same. On the basis of benefit envisaged as
per IT vision of PWD, the KPIs can be classified into two broad categories as follows:
1. Progress Tracking Measures: It aims to assess the progress achieved in transforming PWD
operations with the aid of IT. The following KPIs can be classified in this category:
Percentage of departmental services delivered with aid of Implemented Applications.
IT Policy PWD, Himachal Pradesh
Wipro Ltd 50 Confidential
Percentage of departmental service information published over PWD portal. For
example, Percentage of policies, percentage of information regarding allotment of plots,
etc. being provided to the public through the web portal
Percentage of transactions of each service executed electronically (including forms entry
and enquiry)
2. Customer Value Measures: It aims to assess the advantages and benefits gained with
introduction of IT within PWD and for all agencies interacting with PWD. The KPIs falling in
this category can be sub-divided further into two categories- externally visible and internally
visible as follows:
Externally Visible: This shall include the KPIs that shall be visible to entities outside PWD
like citizens and other government departments interacting with PWD
o Reduction in number of visits of citizens to department premise for each service.
o Reduction in time required to request for a service and for delivery of the end
deliverable. For example, time taken for filing a request and submitting the
documents including the time lost due to standing in the queue.
o Reduction in time required to track pending transactions for each service.
o Reduction in time required to file in and follow-up on complaints and suggestions.
o Reduction in time required to obtain information for each service
Internally Visible: This shall include KPIs that are visible inside PWD to its employees who
benefit from the introduction of IT
o Reduction of time required to locate and/or retrieve relevant information for each
activity in the service
o Reduction of paper volume to be dealt with for each activity for each service
o Reduction of time lost in tracking movement of data and status of processing
involved in the service
o Overall reduction of time invested in each activity for each service
o Reduction in number of physical movement of employees is required for data
transfer.
IT Policy PWD, Himachal Pradesh
Wipro Ltd 51 Confidential
The exact KPIs of the analysis for each of the application that is to be implemented would need
to be studied in detail after the implementation of the project. This must be done by the PWD IT
Wing.
IT Policy PWD, Himachal Pradesh
Wipro Ltd 52 Confidential
5 Way Forward
This section covers what needs to be taken up and done after this document. The initiatives to
be taken up after acceptance of this document have been given as follows
Initiative Steps to be taken
Implementation of
Applications
developed/underway
(PPM, FAS, dynamic web
portal and associated
services)
1. Roll out the current version of the application
2. Take the improvement possibilities identified in the plan to the
software partner for incorporation
3. Keep the areas for linkages ready for easy integration with
other future application
Implementation of new
Applications Identified
The RFP of PWD needs to be prepared for selection of a software
vendor for implementation of all new applications to be
implemented in PWD
Data Centre & Wide Area
Network
To invest in the minimum Infrastructure for IT hardware and
infrastructure to sustain requirements till State Data Centre.
top related