issued for planning approval... · 2019-11-18 · 01 -boulevard -grd. floor +91.800 03 -third floor...

Post on 11-Aug-2020

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

+85.300

01 - BOULEVARD - GRD. FLOOR

+91.800

03 - THIRD FLOOR

+94.800

04 - FOURTH FLOOR

+97.800

05 - FIFTH FLOOR

+100.800

06 - SIXTH FLOOR

+103.800

07 - SEVENTH FLOOR

+106.800

08 - EIGHTH FLOOR

+109.800

09 - NINTH FLOOR

+88.800

02 SECOND FLOOR

+112.800

10 - TENTH FLOOR

+115.800

11 - ELEVENTH FLOOR 1125

3000

3000

3000

3000

3000

3000

3000

3000

3000

3500

PROPOSED BLOCK APED.

LINK ROAD

03

+116.925

+117.600 T.O.P

02 06 01 02

01

03 12

12

02

01

05

31625

+85.300

01 - BOULEVARD - GRD. FLOOR

+91.800

03 - THIRD FLOOR

+94.800

04 - FOURTH FLOOR

+97.800

05 - FIFTH FLOOR

+100.800

06 - SIXTH FLOOR

+103.800

07 - SEVENTH FLOOR

+106.800

08 - EIGHTH FLOOR

+109.800

09 - NINTH FLOOR

+88.800

02 SECOND FLOOR

+112.800

10 - TENTH FLOOR

+115.800

11 - ELEVENTH FLOOR

+118.800

12 - TWELFTH FLOOR

+119.925 T.O.P

3000

3000

3000

3000

3000

3000

3000

3000

3000

3500

PROPOSED BLOCK ACARMANHALL RD

34625

COMMUNALOPEN SPACE

12 02 01 0304 03

0201 03

1009

09

12

31625

+116.925+117.600

+120.300

+116.925

+88.800

06

05

08

09

06

+85.300

01 - BOULEVARD - GRD. FLOOR

+91.800

03 - THIRD FLOOR

+94.800

04 - FOURTH FLOOR

+97.800

05 - FIFTH FLOOR

+100.800

06 - SIXTH FLOOR

+103.800

07 - SEVENTH FLOOR

+106.800

08 - EIGHTH FLOOR

+109.800

09 - NINTH FLOOR

+88.800

02 SECOND FLOOR

+112.800

10 - TENTH FLOOR

+115.800

11 - ELEVENTH FLOOR

+118.800

12 - TWELFTH FLOOR

+119.925 T.O.P

1125

3000

3000

3000

3000

3000

3000

3000

3000

3000

3000

3500

35625

PROPOSED BLOCK ACOMMUNAL

OPEN SPACE

01 0203 031205

050601

A 09

0808

09

A

+120.300 T.O.P

+85.300

01 - BOULEVARD - GRD. FLOOR

+91.800

03 - THIRD FLOOR

+94.800

04 - FOURTH FLOOR

+97.800

05 - FIFTH FLOOR

+100.800

06 - SIXTH FLOOR

+103.800

07 - SEVENTH FLOOR

+106.800

08 - EIGHTH FLOOR

+109.800

09 - NINTH FLOOR

+88.800

02 SECOND FLOOR

+112.800

10 - TENTH FLOOR

+115.800

11 - ELEVENTH FLOOR

+118.800

12 - TWELFTH FLOOR

+119.925 T.O.P

PROPOSED BLOCK A CARMANHALL ROADBOULEVARD

3500

3000

3000

3000

3000

3000

3000

3000

3000

3000

1125

3562

5

Dotted line represents outline of

permitted RB Central scheme Ref

ABP Ref. Pl06D.304405

02 03

03

060206

03

Dotted line represents

outline of permitted RB

Central scheme Ref ABP

Ref. Pl06D.304405

31625

+116.925

+90.900

01 02

12

1201+120.300 T.O.P

+117.600 T.O.P

01

ISSUED FOR PLANNING APPROVAL

A1

N

ZONE A ZONE B ZONE CD

BLOCK A BLOCK B

BLOCK D

BLOCK C

BLOCK EBLOCK F

ZONE EF

ISSUED FOR PLANNING APPROVAL

A1

ALL DIMENSIONS TO BE CHECKED ON SITE

NO DIMENSIONS TO BE SCALED FROM THIS DRAWING

DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT CONSULTANTS DRAWINGS

CLIENT

PROJECT

SCALE@ A1:

DRAWING

DRAWN/CHECKED:

DATE

DRAWING NUMBERREVISION STATUS CODE:

PROJECT NUMBER

Architecture + Interiorshenryjlyons.com

+353 1 888 3333info@henryjlyons.com

51-54 Pearse Street Dublin D02 KA66

STATUS CODE DESCRIPTION

1 : 200

A2

SANDYFORD GP Ltd.

PROPOSED BLOCK 'A' ELEVATIONS

18/07/2019

BM/ RJ

SANDYFORD CENTRAL

SFC-HJL-XX-ZZ-DR-A-2010

950572

1 : 200

Elevation Block A - North-East3

1 : 200

Elevation Block A - South-East4

1 : 200

Elevation Block A - South-West5

1 : 200

Elevation Block A - North West6

Elevation - Materials Reference

01 SELECTED BRICK / BRICK PANEL SYSTEM

02 SELECTED BRICK / SOLDIER COURSE

03 SELECTED DOUBLE GLAZED ALUMINIUM WINDOW SYSTEM, NATURALANODISED FINISH

04 SELECTED BRISE SOLEIL / FIN SYSTEM

05 SELECTED FIBRE CEMENT RAINSCREEN CLADDING SYSTEM

06 SELECTED SAFETY GLASS BALUSTRADE SYSTEM TO BALCONY

07 SELECTED COLOURED RAINSCREEEN SYSTEM

08 SELECTED CURTAIN WALL SYSTEM, NATURAL ANODISED ALUMINIUMFINISH

09 BACKPAINTED GLASS IN SELECTED COLOUR TO ENTRANCES

10 SELECTED METAL CLADDING SYSTEM

11 METAL BALUSTRADE SYSTEM, SELECTED COLOUR PPC FINISH

12 SELECTED CLADDING SYSTEM TO BALCONY FASCIA AND SOFFIT

REV DATE DESCRIPTION CKH DRN

A1 18.07.2019 ISSUED FOR ABP PRE APPLICATION RJ BM

A2 15.11.2019 ISSUED FOR PLANNING APPROVAL RJ HJL

top related