international technology centre leuven pg.1 1999-??-?? ?subject? by: ?.??? philips itcl seescoa...

Post on 17-Jan-2016

215 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Pg.11999-??-?? ?Subject? By: ?.???

International Technology Centre LeuvenInternational Technology Centre Leuven

Philips ITCL

SEESCOA checklist

Piet WautersGroupleader Embedded SWTel.:+32 16 390 735Fax.:+32 16 390 600Piet.Wauters@philips.com

International Technology Centre LeuvenInternational Technology Centre Leuven

Pg.21999-??-?? ?Subject? By: ?.???

General Information High volume consumer electronics Focus: (digital) Sound

• Digital InHome Networks• Signal Coding

Main Customers:• PCE• PS

International Technology Centre LeuvenInternational Technology Centre Leuven

Pg.31999-??-?? ?Subject? By: ?.???

Bridge between research & production

Res

earc

h

Pro

duct

ion

VLSI DSP ESW EMA

Prototyping (POP)

1st Product

(Silicon) Integration

Mass Production

International Technology Centre LeuvenInternational Technology Centre Leuven

Pg.41999-??-?? ?Subject? By: ?.???

Application domain High volume consumer electronics Digital Audio

• SSA• Internet Audio• Multi-channel receivers• Multi-media Speakers (USB)• CD/DVD chipset• …

Typical • 10 - 15 personyear• 6-12 months• 30% SW but increasing• Ind. Ing + Burg. Ir. 50-50

International Technology Centre LeuvenInternational Technology Centre Leuven

Pg.51999-??-?? ?Subject? By: ?.???

Application domain: Characteristics

Soft real-time Cost driven -> dedicated solutions

• memory• Mips• Single CPU• No or Simple OS

Reliability• no upgrades possible• no “reboot” allowed

Power consumption

International Technology Centre LeuvenInternational Technology Centre Leuven

Pg.61999-??-?? ?Subject? By: ?.???

Process: Tools,...

Requirements:• Word documents (FRS) + diagrams

Analysis:• TLD: document + diagrams• Module specifications• UML

Coding• depending on platform: C or ASM

Units Testing

International Technology Centre LeuvenInternational Technology Centre Leuven

Pg.71999-??-?? ?Subject? By: ?.???

Process: Tools,... Units Testing

• simulation (testvectors)• emulators

Integration• emulators• real target

System and Acceptance• Starting from FRS -> TestSpec• System : emulators• Acceptance always with real target

International Technology Centre LeuvenInternational Technology Centre Leuven

Pg.81999-??-?? ?Subject? By: ?.???

Software development methodology

TBD

International Technology Centre LeuvenInternational Technology Centre Leuven

Pg.91999-??-?? ?Subject? By: ?.???

Components

International Technology Centre LeuvenInternational Technology Centre Leuven

Pg.101999-??-?? ?Subject? By: ?.???

Conclusions

Biggest Issue• Time to market -> Tools & reuse• Cost -> Handcrafted & dedicated

top related