inspection checklist for road tankers - …trakhees.ae/en/ehs/ports/documents/form/pmf-01d road...
Post on 09-Jul-2018
783 Views
Preview:
TRANSCRIPT
Revision 00 March 2016 Page 1 of 2
EHS-PMP-01 PMF-01d
INSPECTION CHECKLIST FOR ROAD TANKERS
COMPANY NAME:
VEHICLE MAKES:
REGISTRATION FRONT UNIT PLATE NO:
REGISTRATION BACK UNIT PLATE NO:
COMPANY ADDRESS:
1. DOCUMENT/EQUIPMENT IN CABIN
Items Yes No (1.1) Material Safety Data Sheet (MSDS). (1.2) First Aid Kit. (1.3) Driver Safety Kits (Helmet, Safety Shoes, Reflective Jacket, Safety Goggles & Hand Gloves).
(1.4) Safety Cones – 2 Nos. (1.5) Fire Extinguisher.
2. ELECTRICAL
Items Yes No (2.1) Battery Secured and Ventilated. (2.2) Earthling Strap Properly Grounded and Conduits of all Wirings. (2.3) Acid Resistant Cover. (2.4) Battery Cut Off.
3. MARKING AND PLACARDING
Items Yes No (3.1) Is the Road Tanker Placard to Display for the Type of Fuel, Tanker is Allowed to Transport – Rear and Both Sides.
(3.2) Emergency Information Panel – Rear and Both Sides.
4. SPILL KIT
Items Yes No (4.1) Spill Kit Provided. (4.2) Provision for Storage of Spill Kit.
5. TANK
Items Yes No (5.1) Is the Tank Shell in Good Condition. (5.2) Is the Tanker Mounted Securely. (5.3) Manhole Covers Covering the Tank Openings. (5.4) Access Ladder Provided for Tanks.
Revision 01 March 2016 Page 2 of 2
EHS-PMP-01 PMF-01d
6. OUTLETS
Items Yes No (6.1) Condition of Intake & Discharge Valves. (6.2) Dust Caps Provided on All Connections.
7. HOSES AND FITTINGS
Items Yes No (7.1) Hoses in Good Condition. (7.2) Storage for Hoses Provided. (7.3) Hoses Stencilled Both Sides
8. TYRE & BRAKES
Items Yes No (8.1) Tyres in Good Condition.
9. FIRE EXTINGUISHER
Items Yes No (9.1) 2 no’s of Dry Powder (one no. can be foam type) - 9 kg Each.
10. LIGHTS
Items Yes No (10.1) Head Lights, Indicator/Hazard Lights in Working Condition. (10.2) Warning Lights (all-round beacon) in Working Condition. (10.3) Tank Side Lights, Brake lights in Working Condition. (10.4) Reverse Light and Reverse Siren in Working Condition
11. PUMP & FITTINGS
Items Yes No (11.1) Pump Properly Installed, Secured & Operates. (11.2) All Connections from & to the Pump Proper Without Any Leaks. (11.3) Drip Tray Provided at Pump Area. (11.4) Pump Quick Shut-Off Valves Operate.
EHS Officer Comments
Name:
Date: Sign:
RESULT: APPROVED NOT APPROVED
top related