Innovation CenterInnovation CenterInnovation CenterInnovation Center

A presentation of using GANTT charts with projects.

By Gary Lindahl

Innovation CenterInnovation CenterInnovation CenterInnovation Center

University of Illinois at Chicago (UIC)

Iowa State University (ISU)

UIC Electronic Visualization Lab

Innovation CenterInnovation CenterInnovation CenterInnovation Center

University of Illinois at Chicago (UIC)

Iowa State University (ISU)

ISU Virtual Reality Application Center

Innovation CenterInnovation CenterInnovation CenterInnovation Center

ISUISUISUISU UICUICUICUIC

Innovation CenterInnovation CenterInnovation CenterInnovation Center

Fakespace Systems – USA John Deere - USAChristie Digital Systems – USA TechViz - USABARCO – USA Consulting

Innovation CenterInnovation CenterInnovation CenterInnovation Center

CAVE™, HMD, Flat Tiled Displays, Curved Tiled Displays

Innovation CenterInnovation CenterInnovation CenterInnovation Center

Innovation CenterInnovation CenterInnovation CenterInnovation Center

Simple example.

Includes: List of task descriptions and a timeline.

Innovation CenterInnovation CenterInnovation CenterInnovation Center

It is an effective tool for planning and scheduling operations.

Useful to work with teams of people, managers, and customers.

Innovation CenterInnovation CenterInnovation CenterInnovation Center

Tool used internationally. Examples of professional solutions:Microsoft Project, SmartDraw, Oracle, Seimenshttp://en.wikipedia.org/wiki/List_of_project_management_software

Innovation CenterInnovation CenterInnovation CenterInnovation Center

The vertical line on the chart is the current-date indicator and indicates present and future status of the project as of that date.The bar is filled with two different colors to indicate progress and completion.

Innovation CenterInnovation CenterInnovation CenterInnovation Center

Conception, Preliminary Research, Project Development, Testing and Validation, Presentation and Demonstration

These sections are the different stages of the project related to a CDIO project.

Progress bar for the stage.

Innovation CenterInnovation CenterInnovation CenterInnovation Center

Tasks and Sub-tasks needed within each project stage.These will need to be updated based on the type of

project’s requirements.

These are the tasks identified within each stage of the project.

Progress bar for each task and sub-task

Innovation CenterInnovation CenterInnovation CenterInnovation Center

How should I Use?

Innovation CenterInnovation CenterInnovation CenterInnovation Center

1) Microsoft Excel Application.

2) Download template file.

3) Determine a student to lead in the group to manage and update this file.

4) Determine a student to lead as a manager to plan the needed tasks and schedule.

Innovation CenterInnovation CenterInnovation CenterInnovation Center

Download from the file server at this location.ftp://10.10.87.111/FORMS/PROJECT TOOLS/CDIOTemplate_2010_2011_ganttchart_rev_1.xls

Username: Anonymous No Password.

Innovation CenterInnovation CenterInnovation CenterInnovation Center

1)Enter once,

+ Project Name

Innovation CenterInnovation CenterInnovation CenterInnovation Center

1)Enter once,

+ Project Name

+ Project Student Lead

Innovation CenterInnovation CenterInnovation CenterInnovation Center

1)Enter once,

+ Project Name

+ Project Student Lead

+ Project Start Date

Innovation CenterInnovation CenterInnovation CenterInnovation Center

1)Enter once,

+ Project Name

+ Project Student Lead

+ Project Start Date

+ Today’s Date

Innovation CenterInnovation CenterInnovation CenterInnovation Center

1)Enter once,

+ Project Name

+ Project Student Lead

+ Project Start Date

+ Today’s Date

2)Task Name

Innovation CenterInnovation CenterInnovation CenterInnovation Center

1)Enter once,

+ Project Name

+ Project Student Lead

+ Project Start Date

+ Today’s Date

2)Task Name

3) Task Start Date

Innovation CenterInnovation CenterInnovation CenterInnovation Center

1)Enter once,

+ Project Name

+ Project Student Lead

+ Project Start Date

+ Today’s Date

2)Task Name

3) Task Start Date

4) Task Duration of Days

Innovation CenterInnovation CenterInnovation CenterInnovation Center

1)Enter once,

+ Project Name

+ Project Student Lead

+ Project Start Date

+ Today’s Date

2)Task Name

3) Task Start Date

4) Task Duration of Days

5) Percentage of Days Completed

Innovation CenterInnovation CenterInnovation CenterInnovation Center

1)Enter once,

+ Project Name

+ Project Student Lead

+ Project Start Date

+ Today’s Date

2)Task Name

3) Task Start Date

4) Task Duration of Days

5) Percentage of Days Completed

6) Assign Task Lead Student