Site Operating Permits (SOPs)Initial, Revision, and Renewal Applications

Brandon Marsh, P.E.TCEQ Air Permits Division

2019 Environmental Trade Fair & Conference

Title V Permitting OverviewWho needs a Title V permit?

What is the Title V permitting process?

Where do I access Title V permit documents?

Who Needs a Title V Permit?Major Sources

Other Sources

Major SourcesMajor Sources as defined by 30 TAC §122.10≥ 100 TPY PTE≥ 25 TPY total HAPs≥ 10 TPY single HAP

Lower thresholds for nonattainment areas

“Affected Sources” under acid rain rulesSolid waste incineration unitsSpecific non-major sources listed by EPA

Other Sources

Title V Permit Overview

What is the Title V permitting process?

Permitting ProcessTV Project

TypeApplication Submittal

Technical Review

Working Draft Permit

Public Comment/EPA Review

Final Issuance

Initial: New Title V permit

Renewal: Every 5 years for effective Title V permits

Revisions: Changes to an existing Title V permit

Project Types §122.201

§122.241

§122.210

Application Due Dates•Before site operation beginsInitial

•Minor – Before operation of change•Significant – Before operation of change

Revisions

•6 – 18 months before permit expirationRenewal

Operating Changes in Permit Application

• Date application is submittedInitial

• Minor – After completed application is submitted• Significant – After TCEQ issues revised permitRevisions

• Minor – After completed application is submitted• Significant – After TCEQ issues revised permitRenewal

Example: Timely Renewal Submittal

Permit Renewal Submitted:

10/01/2023

Is the renewal timely?

No

09/25/2022 – 09/25/2023

Initial may be requiredEffective Date of Initial Permit or

Last Renewal

SOP Content Permit Face General Terms and Conditions Special Terms and Conditions Attachments Appendices

OP-REQ1 Form General Terms and Conditions Special Terms and Conditions State Site-Wide Federal Site-Wide Acid Rain CSAPR NSR Authorizations

OP-REQ1 FormInitial and renewal applications - requiredRevision applications – only if site-wide changesAnswer ALL questions for SOP applications, unless instructions indicate otherwiseCheck form date

TCEQ – 10043 (APDG 5733v44, Revised 03/19) OP-REQ1

Check form footer for date

Example: 30 TAC Chapter 111 Vents

Prompts to skip forward

Example: Special Terms and Conditions

Determined by OP-REQ1 Questions 1 - 4

Attachments Applicable Requirements Additional Monitoring Permit Shield NSR Authorizations Appendix B

Applicable Requirements: OP-UA Forms

Submit for initial, renewal, and revision applications

63 unit-specific forms and generic OP-UA1 form

Follow all form instructions

Check form date to verify most recent

TCEQ-1003 (APDG 5702v29, Revised 12/18) OP-UA2

Check form footer for date

Example:OP-UA2 MACT ZZZZ Engines

Codes determine applicable

requirements

Example:OP-UA2 Requirements

SOP Index No.

Pollutant State Rule or Federal Regulation

Name

Emission Limitation, Standard or Equipment

Specification Citation

Textual Description (See Special Term and

Condition 1.B.)

63ZZZZ-3 112(B) HAPS

40 CFR Part 63, Subpart ZZZZ

§ 63.6603(a)-Table2d.10 § 63.6595(a)(1) § 63.6605(a) § 63.6605(b) § 63.6625(e) § 63.6625(h) § 63.6625(j)

For each existing non-emergency, non-black start 4SRB stationary RICE with a site rating less than or equal to 500 HP, located at an area source, you must comply with the requirements as specified in Table 2d.10.a-c.

Example: Forms for SOP Renewal

Permit Renewal Issued 11/25/2014No changes at site, no OP-UA forms submittedIs this acceptable?Maybe: MACT ZZZZ updated 02/27/2014, OP-UA2 updated 12/2018, and flowchart updated 02/20/2018

Attachments

Additional Monitoring

Additional Monitoring: OP-MON Forms

Evaluate for initial, renewal, and revision applications

Rule-by-rule, pollutant-by-pollutant

APDG 5241: Periodic Monitoring

APDG 5824: Compliance Assurance Monitoring

Periodic MonitoringDoes the rule contain sufficient monitoring?Does the rule have sufficient monitoring frequency?If ‘NO’ to either of the above, then Periodic Monitoring is required

Example: Periodic MonitoringF. Compliance with subparagraphs (A)-(C) of this paragraph shall be determined by applying

the following test methods, as appropriate. The highest reading obtained shall determine compliance with the appropriate visible emission limit:

i. CEMS as described in subparagraph (D) of this paragraph;

ii. Test Method 9 (40 CFR 60, Appendix A);

iii. Alternate Method 1 to Method 9, Light Detection and Ranging (40 CFR 60, Appendix A); or

iv. equivalent test method approved by the executive director of the Texas Air Control Board (TACB) and United States Environmental Protection Agency (EPA).

111.111(a)(1)(F) specifies

monitoring options

111.111(a)(1)(F) does not specify

monitoring frequency

PM is required!

Compliance Assurance Monitoring

Does the unit have an emission limitation?Does the unit have a control device?Is the unit a major source PRE control?If ‘YES’ to ALL of the above, then CAM is required**

** Certain exemptions to CAM requirements exist

Turbine = 0.032 lb NOx/MMBtuPre-control = 150 tpy NOxControl device = SCRCAM is required

Example: Compliance Assurance Monitoring

Example: Monitoring OptionsAPDG 5824: Compliance Assurance Monitoring

NOx CEMS: CAM-NO-002NOx lb/MMBtu

SCR: CAM-SC-003 and CAM-SC-004Inlet gas temperature and injection nozzle flow rate

Attachments

Permit Shield

Permit ShieldsPermit shields document negative applicabilityRequested on OP-REQ1

Documented on OP-REQ2

Only for potentially applicable regulations

Regulatory basis where an emission unit is not subject to a regulation

Permit shields are considered for initial, renewal, and significant revision applications

Documented in a minor revision, but not granted

Example: OP-REQ2 Form

§63.400(a): New and existing cooling towers (CT) operated with chromium-based water treatment chemicals OP-REQ2: CT is not operating

with chromium based water treatment chemicals.

Attachments

NSR Authorizations

NSR Authorization ReferencesMajor NSR Authorizations

Minor NSR Authorizations

Permits by Rule

NSR authorizations must be effective for Title V issuance.

NSR Authorization References by Emission Unit

OP-SUM and OP-SUMR forms

Each unit must have authorizationMinor NSR permitMajor NSR permitStandard permitPermit-by-rule

Attachments

Appendix B

Appendix B: Major NSR Summary Table

Incorporated by Reference (IBR)

TCEQ formats table based on NSR MAERT

Applicant identifies MRRT requirements from NSR special terms and conditions

TCEQ reviews requirements and appends to SOP

Appendix B: Major NSR Summary Table

Permit Number: 99999/PSDTX888 Issuance Date: February 28, 2017

Emission Point No. (1)

Source Name (2)

Air Contaminant Name (3)

Emission Rates

Monitoring and Testing Requirements

lbs/hour TPY(4) Spec. Cond. Turbine and Duct Burner During Normal Operation GT-HRSG No. 1

Turbine/HRSG No. 1

NOx 154.0 --- 2, 10, 11, 12, 18

NSR STCsNSR MAERT

Working Draft Permit

Send deficiencies

Review Responses

Prepare WDP

Prepare PA/PNAP

Address deficiencies

Provide appropriate forms

Review WDP

Certify updates prior to PA/PNAP

TCEQ PERMIT REVIEWER APPLICANT

Public Notice

Initial, Renewal, Significant Revision

Applicant publishes notice

30-day public comment period

45-day EPA review starts after notification of publication

Minor Revisions

TCEQ posts online

30-day public comment period

45-day EPA review starts with public comment period

PUBLIC NOTICE PUBLIC ANNOUNCEMENT

EPA ReviewConcurrent with public notice or public announcementStops if comments are receivedBegins again after comments are addressed

Final State ActionTCEQ issues permit60-day public petition periodEPA may receive valid petitionTCEQ resolves granted objectionsPermit, permit record, or both may be modified

Final State Action

Permit Number, Effective Date

Company, Site, Area, Location

Title V Permit Overview

Where do I access Title V permit documents?

Accessing Air Permit Documents

•TCEQ campus: Hard copies, films, etc.Central File Room

•Online – Detailed documents, project files, final actionsCFR Online

•Online – Title V or NSR by RN, permit #, name

Central Registry

www.tceq.Texas.gov

Central File Room Online

Central Registry

TCEQ Records Onlinewww.tceq.texas.gov/agency/data/records-services/welcome-to-tceq-records-online

Detailed Guidance

Brandon Marsh, P.E.Brandon.Marsh@tceq.texas.govGeneralairperm@tceq.texas.gov(512) 239 – 1250

Site Operating Permits (SOPs)