ingos climadat

Post on 23-Mar-2016

227 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

InGos ClimaDat

TRANSCRIPT

LOCATION: NATURAL PARK OF THE EBRE RIVER DELTA

2

DEC3 station

InGOS General Assembly

Bremen, 11th-14th March 2013

CHARACTERISTICS OF THE DEC3 STATION

3

Ebre river Delta (DEC3 Station)

Location

(surface)

Natural Park of the Ebre river delta (8445 ha)

Closest village Deltebre (6.7 km SW of the station) with 12300

inhabitants

Climate Typical mediterranean

Soil Sandy and silty

Characteristics of

the site

• 300 km2 of rice fields, flooded during some

periods of the year (rice cultivation process)

• Geographical position influenced by the

Continent as well as by the Mediterranean

sea

• Very humid area

InGOS General Assembly

Bremen, 11th-14th March 2013

METEROLOGICAL DATA AT DEC3

4

2.36% H2O

1.22% H2O

NW wind from the

Ebre river

N wind from the continent

NE and E wind

from the

Mediterranean

sea

InGOS General Assembly

Bremen, 11th-14th March 2013

FOOTPRINT AT DEC3

5 InGOS General Assembly

Bremen, 11th-14th March 2013

HYSPLIT

FLEXPART

EQUIPMENTS AND MEASUREMENTS

6

Young Equipments

Atmospheric Pressure (Young

61302v)

Rainfall (Young 52202)

2D Anemometer

WindSonic232

Wind Speed (1 Hz)

Wind Direction (2D) (1 Hz)

Vaisala HMP110 Sensor

Temperature and HR

Campbell CR1000 Datalogger

Recording data system

Air inlet

(10 m height a.g.l.)

InGOS General Assembly

Bremen, 11th-14th March 2013

EQUIPMENTS AND MEASUREMENTS

7

Picarro Analyzer

G2301

[CO2], [CH4], [H2O]

(1 measurement every

5 seconds) (C-12)

ARMON for 222Rn

measurements

[Rn-222]

(1 measurement

every hour)

Modified Gas

Chromatograph 6890N

Agilent

[CO2], [CH4], [CO],

[N2O], [SF6]

(1 measurement every

approx. 15 minutes)

InGOS General Assembly

Bremen, 11th-14th March 2013

AIR INLET DRYING SYSTEM

8

Pressure

Buffer 0.7L

High Pressure

Refrigerator

1ºC

Water

removal

Cryocooler

-70ºC

Electrovalves

ON-OFF

Radon

System

GC System

PICARRO

AnalyserPICARRO

PUMP

Pressure

regulator

Pressure

sensor

InGOS General Assembly

Bremen, 11th-14th March 2013

SCHEME OF THE MODIFIED GC AGILENT 6890N

9

N2O and SF6

CO, CH4 and CO2

InGOS General Assembly

Bremen, 11th-14th March 2013

Based on van der Laan et al. (2009) configuration

TYPICAL CHROMATOGRAM AND RUN TIME

10

Chromatogram

0.00

V5 ON

V8 ON

V1 ON

3.05

V7 Next

3.60

V4 ON

V6 ON

V8 OFF

4.92

V6 OFF

5.20

V2 ON

6.00

V1 OFF

5.84

V3 ON 6.75

V5 OFF 8.88

V2 OFF

V3 OFF

V4 OFF

0.03 8.34

8.90

32 psi

60psi

P

Time ( mins )

AUX

8.00 mins

0.34

8.90

78psi

8.00 mins

8.22 0.22 8.47

8.65

AUX # 4

AUX # 3 and # 5

? - ECD

FID

N 2 O

SF 6

CH 4 1 CO

CH 4 2 CO 2

Chromatogram

0.00

V5 ON

V8 ON

V1 ON

3.05

V7 Next

3.60

V4 ON

V6 ON

V8 OFF

4.92

V6 OFF

5.20

V2 ON

6.00

V1 OFF

5.84

V3 ON 6.75

V5 OFF 8.88

V2 OFF

V3 OFF

V4 OFF

Run Time

0.03 8.34

8.90

32 psi

60psi

P

Time ( mins )

AUX

8.00 mins

0.34

8.90

78psi

8.00 mins

8.22 0.22 8.47

8.65

AUX # 4

AUX # 3 and # 5

μ-ECD

FID

N 2 O

SF 6

CH 4 1 CO

CH 4 2 CO 2

mins

InGOS General Assembly

Bremen, 11th-14th March 2013

CALIBRATION STRATEGY

11 InGOS General Assembly

Bremen, 11th-14th March 2013

• A working tank (WT) is used: WT - Sample – WT - Sample – etc.

• 6 working standards (MPI cylinders) used for calibration

• Currently, calibration every 2.2 days: Tests for lower frequency needed (1 per week?)

• A target cylinder (Trg) is run three times per day (MPI cylinder)

CH4 (ppm)

CO (ppb)

N2O (ppb)

CO2

(ppm) SF6 (ppt)

WS MPI 1 1.698 80.322 309.616 369.954 9.621

WS MPI 2 1.797 140.287 318.08 385.083 9.343

WS MPI 3 1.902 195.936 321.961 399.411 9.301

WS MPI 5 2.098 314.501 332.053 429.93 8.83

WS MPI 6 2.295 316.258 336.116 449.793 9.021

WS MPI 7 2.479 474.744 343.554 507.908 16.89

WT (MPI 4) 1.998 252.967 327.941 414.567 9.929

Trg (MPI 3) 1.902 195.936 321.961 399.411 9.301

WT (commercially available)

1.867 157.443 318.029 - -

Trg (MPI 3) 1.902 195.936 321.961 399.411 9.301

PERIOD 1:

Oct. 2012 – Nov. 2012

PERIOD 2:

Jan. 2013 – Feb. 2013

CH4, CO2, CO, N2O, SF6 CONTINOUS MEASUREMENTS WITH GC:

ATMOSPHERIC DATA

12 InGOS General Assembly

Bremen, 11th-14th March 2013

The system had to be

stopped due to a problem

with the pump

CH4, CO2, CO, N2O, SF6 CONTINOUS MEASUREMENTS WITH GC:

ATMOSPHERIC DATA

13 InGOS General Assembly

Bremen, 11th-14th March 2013

Invalid values

The system had to be

stopped due to a problem

with the pump

CH4, CO2, CO, N2O, SF6 CONTINOUS MEASUREMENTS WITH GC:

ATMOSPHERIC DATA

14 InGOS General Assembly

Bremen, 11th-14th March 2013

The system had to be

stopped due to a problem

with the pump

CH4, CO2, CO, N2O, SF6 CONTINOUS MEASUREMENTS WITH GC:

ATMOSPHERIC DATA

15 InGOS General Assembly

Bremen, 11th-14th March 2013

The system had to be

stopped due to a problem

with the pump

CH4, CO2, CO, N2O, SF6 CONTINOUS MEASUREMENTS WITH GC:

ATMOSPHERIC DATA

16 InGOS General Assembly

Bremen, 11th-14th March 2013

No SF6 value The system had to be

stopped due to a problem

with the pump

CH4, CO2, CO, N2O, SF6 CONTINOUS MEASUREMENTS WITH GC:

TARGET RESULTS

17 InGOS General Assembly

Bremen, 11th-14th March 2013

(assigned – measured) values

CO2 PICARRO MEASUREMENTS

CO2 Target measurements:

1 every 23h during 20 min

Precision (repeatability): 0.028 ppm

Accuracy: 0.045 ppm

InGOS General Assembly

Bremen, 11th-14th March 2013

Calibration:

4 Working Standards

Every 20 days

Each WS twice

20 minutes duration

each analysis

18

CH4 PICARRO MEASUREMENTS

CH4 Target measurements:

1 every 23h during 20 min

Precision (repeatability): 0.26 ppb

Acuracy: 0.8 ppb

InGos General Assembly

Bremen, 11th-14th March 2013

19

Calibration:

4 Working Standards

Every 20 days

Each WS twice

20 minutes duration

each analysis

XIC3

GC (CO2, CH4, N2O, CO, SF6) and Radon measurements

Equipment under calibration and adjustments Site inaguration: April 2013

InGOS General Assembly

Bremen, 11th-14th March 2013

21

GRAZALEMA

Site under construction GC data hopefully available on May-June 2013

InGOS General Assembly

Bremen, 11th-14th March 2013

22

GHG measurements since 2006

For GC measurements investment is needed:

building a new container, renting of placement, standards

LA MUELA

InGOS General Assembly

Bremen, 11th-14th March 2013

23

IC3 ClimaDat TEAM

InGOS General Assembly

Bremen, 11th-14th March 2013

24

top related