CONFIDENTIAL©CopyrightBakerBotts2017.AllRightsReserved.

MollyCagle

Infrastructure- What'sHappeninginWashingtonDC

BAKERBOTTS 2

BAKERBOTTS 3

BAKERBOTTS

FocusonInfrastructureisNotNew

• InfrastructurePrivatization– EO 12803(Bush41)

• PrinciplesforFederalInfrastructureInvestments– EO 12893(Clinton)

• EnvironmentalStewardship&TransportationInfrastructureProjectReviews– EO 13274(Bush43)

• ImprovingPerformanceofFederalPermitting&ReviewofInfrastructureProjects– EO 13604(Obama)

4

BAKERBOTTS

Priority List

Emergency&National SecurityProjects

President-elect Trump

BAKERBOTTS

BasicMetrics - Running Total/ Initial 50Projects

Total Investment: $137.5 Billion

Private Investment: 50%

Jobs

Direct: 193,350 job years

Indirect (est.): 241,700 job years

Long-term:

BAKERBOTTS

44. HuntingtonBeachDesalinationPlant

1.Description: A cost-effective, environmentally sensitive solution to provide a safe and reliable water supply to Orange County residents and has the potential to bring significant economic benefits for the city of Huntington Beach and the region

2. Authority: Poseidon Water

3. Cost: $350 million

4. Jobs: 400 Direct Jobs

5. Status

1. Engineering: In progress

2. Permitting: In progress

3. Funding: In progress

BAKERBOTTS

ANDTHENTHISHAPPENED

BAKERBOTTS

MakingInfrastructureHappenisHappening

9

“Wewillbuildnewroads,andhighways,andbridges,andairports,andtunnels,andrailways all

acrossourwonderfulnation.”InauguralAddress- January20,2017

BAKERBOTTS

How?

10

• EO 13766: “streamlineandexpedite,inamannerconsistentwithlaw,environmentalreviewsandapprovalsforallinfrastructureprojects"

• PresidentialAdvisoryCouncilonInfrastructure

BAKERBOTTS

FIXTHENEPA PROCESS

11

BAKERBOTTS

DakotaAccess- TheNEPA Timeline

http://www.startribune.com/months-needed-for-additional-study-of-dakota-access-pipeline/435216633/

• July2014- processbegins• July2016- EA/FONSI• Sept.- Dec2016- Moreconsultation• Dec.2016- Corpsmemo• Jan.18,2017- IntenttodoEIS• Jan.20,2017- Inauguration• Jan.24,2017- "Review&approve"• Feb.2017- EA affirmed,easement• June2017- DAPL operational

BAKERBOTTS

ANDTHENTHISHAPPENED

13

BAKERBOTTS

TheNEPA Opinion

• Corps"generallycomplied"withNEPA• BUT "substantialexceptions"

1. Areproject’seffectslikelytobehighlycontroversial?2. Impactofaspillon:

a) Fishing,huntingrightsb) Environmentaljustice

14

BAKERBOTTS

SOtheWhiteHouseDidThis:EO 13807- August15,2017

• “EstablishingDisciplineandAccountabilityintheEnvironmentalReviewandPermittingProcessforInfrastructure”– majorinfrastructureprojects– multipleauthorizationsbyFederalagencieswillberequiredtoproceedwith

construction– anenvironmentalimpactstatement(EIS)underNEPA isrequired– projectsponsorhasidentifiedthereasonableavailabilityoffundssufficienttocomplete

theproject.

• Threecriticalagencies– OfficeofManagementandBudget(“OMB”)– WhiteHouseCouncilonEnvironmentalQuality(“CEQ”),– FederalPermittingImprovementSteeringCouncil(“FPISC”)

• FASTActof2015

15

BAKERBOTTS

Discipline&Accountability

• AgencyAccountability– Average2Years– Tracking&Scoring

• ProcessEnhancements– OneFederalDecision– CEQActionPlan

• OneFederalDecision• Rules,Guidance,etc.• Dashboard• Disputeresolution

16

BAKERBOTTS

LET'SMAKETHISHAPPEN

• Tobea"HighPriority"infrastructureproject.– CertainHighways,publictransportation,multimodalprojects,WaterInfrastructure

projectsandFastActprojects– ProjectsdesignatedbytheFPISC ExecutiveDirector– Governor– Agencyhead– ChairmanofCEQ

• Thisdeterminationshallbemadeafterconsiderationoftheproject'simportancetothegeneralwelfare,valuetotheNation,environmentalbenefits,andsuchotherfactorsastheChairmandeemsrelevant

17

BAKERBOTTS

WHAT'SKEEPINGTHISFROMHAPPENING

18

BAKERBOTTS

FPISC -DeputySecretariesof:

• DepartmentofAgriculture– USDARD

– USFS

• ArmyCorpsofEngineers• DepartmentofEnergy• DepartmentofTransportation• DepartmentofCommerce

– NTIA

– NOAA

– NMFS

• DepartmentofInterior– USFW

– BLM

– BuRec

– NPS

– BOEM

• DepartmentofDefense• DepartmentofDefense• EnvironmentalProtectionAgency• NuclearRegulatoryCommission• FederalEnergyRegulatory

Commission• DepartmentofHousingandUrban

Development• AdvisoryCouncilonHistoric

Preservation• DepartmentofHomelandSecurity

– FEMA

– USCG

19

BAKERBOTTS

WHATHAPPENSFIRSTISNOTTHEISSUE

20

BAKERBOTTS

CEQ AlreadyhasstartedtoMakethisHappen

• Willdevelop“OneFederalDecision”frameworkandguidanceanddirectivestoassistagenciesinimplementingOneFederalDecision.

• Identifyindividualstoreceive“highpriorityinfrastructureprojects”requests.• Reviewitsrulesforchangesorupdated.• Revise,modify,and/orsupplementexistingguidance• Developnewguidanceto“simplifyandacceleratetheNEPA processfor

infrastructureprojects.”– publicinvolvementintheNEPA process– deferencetotheleadfederalagencyinmakingkeyNEPA determinations– methodsforassessingcumulativeimpactsofinfrastructureprojects– theuseofpriorstudiesinthesamegenerallocationastheproposedproject

• identifyimpedimentstotheefficientandeffectiveprocessinganddevelop“actionplans”andtimelinesforaddressingtheseimpediments.

21

BAKERBOTTS 22

BAKERBOTTS 23

BAKERBOTTS

Questions?

24

AUSTIN

BEIJING

BRUSSELS

DALLAS

DUBAI

HONGKONG

HOUSTON

LONDON

MOSCOW

NEWYORK

PALOALTO

RIYADH

SANFRANCISCO

WASHINGTON

bakerbotts.com

©BakerBottsL.L.P.,2017.Unauthorizeduseand/orduplicationofthismaterialwithoutexpressandwrittenpermissionfromBakerBottsL.L.P.isstrictlyprohibited.Excerptsandlinksmaybeused,providedthatfullandclearcreditisgivenwithappropriateandspecificdirectiontotheoriginalcontent.

top related