industrial building-case studies

Post on 11-Jan-2016

240 Views

Category:

Documents

4 Downloads

Preview:

Click to see full reader

DESCRIPTION

A Set Of Case Studies for a proposed food & beverage plant at Gbagada industrial estate, Lagos, Nigeria

TRANSCRIPT

Floor Plan

The WBF Complex by Flad ArchitectsCASE STUDY 1

Brewing Science Laboratory

CASE STUDY 1

Teaching & Research Winery

CASE STUDY 1

Food Science Laboratory

CASE STUDY 1

Sustainable Highlights

CASE STUDY 1

Floor Plan

CASE STUDY 2Pack Line by Lea Katz ArchitectureLocation: Industrial Zone Holon, Tel Aviv, Israel.Project Area: 2,400 sqm (Production Area), 620sqm (Administrative Area), 2,500 sqm (yard, Parking and Loading Bays)

Spatial Arrangement and Flow

CASE STUDY 2

SOUTHEAST FAÇADE FACTORY BUILDING

SECTION SHOWING DOOR AND DUCT DETAILSTEEL ROOF TYPE AND ARRANGEMENT

CASE STUDY 2

CASE STUDY 2

A. EXTERIOR VIEWB. SECTIONSC. INSULATIN G ALUMINIUM PANELS D. INTERIOR HALL

CASE STUDY 4NESTLE NIG. LTD

AGBARA MANUFACTURING COMPLEX

SONGIUM MALT EXTRACT PLANT AGBARA

ENZYMATIC HYDROLIZED PLANT PROTEIN MIX FACTORY

EHPM PLANT, AGBARA

NESTLE WATER PLANT, AGBARA FACTORY ROAD CONSTRUCTION

CASE STUDY 4 NESTLE NIG. LTDAGBARA MANUFACTURING COMPLEX

NESTLE WATER PLANT, AGBARA

INTERIOR- NESTLE WATER PLANT, AGBARA

CASE STUDY 4 NESTLE NIG. LTDAGBARA MANUFACTURING COMPLEX

INTERIOR- NESTLE WATER PLANT, AGBARA

NESTLE WATER PLANT, AGBARA

Jumbo Roller Dryer for All Family Cereals Plant

CASE STUDY 4 NESTLE NIG. LTDAGBARA MANUFACTURING COMPLEX

INTERIOR- NESTLE WATER PLANT, AGBARA

NESTLE WATER PLANT, AGBARA NESTLE WASTE WATER PLANT, AGBARA

Vacuum Band Dryer for Nestle MILO Production

Ware House for Raw Material

Wrapping Machine for MAGGI production

CASE STUDY 4 NESTLE NIG. LTDAGBARA MANUFACTURING COMPLEX

Walk Way

Agbara Factory Clinic Agbara Factory Canteen

Agbara Factory Generator Plant

TRI GENERATOR PLANT, AGBARA

Agbara Factory Fuel and Diesel Dump

CASE STUDY 5NESTLE NIG. LTD

FLOWERGATE FACTORY, NEAR SHAGAMU IN OGUN STATE

SITE FEATURESThe site is located close to Shagamu in Ogun State. It sits on a 36 Hectare Plot and has facilities that are separated by different structures spread across the site. The site is connected by roads, rails and walkways that connects humans and vehicles through the various facilities on the site

SITE FEATURESThe factory has a start up staff strength of 180 staffs but the number has consistently increased over time. A huge parking space and greenery are strong features of the site

RAW MATERIAL STORAGE

CASE STUDY 5NESTLE NIG. LTD

FLOWERGATE FACTORY, NEAR SHAGAMU IN OGUN STATE

Cooling Towers at Watergate Factory

MAGGI PRESSING AND WRAPPING

CASE STUDY 5NESTLE NIG. LTD

FLOWERGATE FACTORY, NEAR SHAGAMU IN OGUN STATE

MIXING TOWER

INDUSTRIAL SERVICE BUILDING

CASE STUDY 5NESTLE NIG. LTD

FLOWERGATE FACTORY, NEAR SHAGAMU IN OGUN STATE

Cooling Towers at Watergate Factory

Chillers at Watergate Factory

CASE STUDY 5NESTLE NIG. LTD

FLOWERGATE FACTORY, NEAR SHAGAMU IN OGUN STATE

top related