icao construction
Post on 14-Apr-2018
251 Views
Preview:
TRANSCRIPT
-
7/30/2019 ICAO Construction
1/58
Airfield Pavement Construction
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
Lauri van Run MSc., EUR ING
General Manager/Technical Director (Airports)
Scott Wilson Sdn Bhd
-
7/30/2019 ICAO Construction
2/58
Airport Pavement Types
Rigid Pavements Runways, Aprons, Taxiways, Holding Points
Flexible Pavements
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
Runways, Taxiways Block Pavements
Aprons
Composite Pavements
All
-
7/30/2019 ICAO Construction
3/58
Case Study
NEW BANGKOK INTERNATIONAL AIRPORT
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
4/58
-
7/30/2019 ICAO Construction
5/58
CONSTRUCTION OF RIGID PAVEMENTS Pavement Design
Specifications
Contractors construction method statement Laboratory and Materials
Mix designs
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
Placing Plant
Aggregates
Chemical Additives (plasticizers, retarders, etc.)
Curing Method
Trials
Construction Supervision
-
7/30/2019 ICAO Construction
6/58
Pavement Design
Pavement Structure
450 mm PQC (Tensile Strength 5,5 Mpa)
720 mm CTB (Compressive Strength Min 8 Mpa)
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
mm rus e one
800mm sand blanket
12 meters Ground Improvement
-
7/30/2019 ICAO Construction
7/58
Construction Starts
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
8/58
Ground Improvements
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
9/58
Principle of PVD
Surcharge Load(Preloading Embankment)
Sand Blanket
Pump
Manhole
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
Soft Clay
Medium Clay/ Stiff Clay
Drain
Water Flow
-
7/30/2019 ICAO Construction
10/58
CTB Construction West Runway
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
11/58
Cement Treated Base 720mm
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
12/58
PQC Construction with Slipform Paver
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
13/58
Materials
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
14/58
Stock Pile
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
15/58
Concrete Specifications
Concrete Strength - 5.5 Mpa
Smoothness - max. 5 mm under 3 meter straight edgefor Aprons
Max ambient temperature 33 degrees Celcius
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
Testing requirements Slump requirement 15 - 25mm at location of construction
Curing compound
Joint details Joint sealant
Protection of pavement during 28 days of curing
-
7/30/2019 ICAO Construction
16/58
PQC Batching Plants
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
17/58
Slip Form Paver
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
18/58
Construction Sequence
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
19/58
Surface Finish by Auto Float
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
20/58
Start of In-Fill Construction
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
21/58
Apron Grated Drain
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
22/58
Apron Drainage Channel
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
23/58
Form Work attached to Drainage Channel
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
24/58
Pilot Lanes Completed
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
25/58
Apron Construction Curing in Progress
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
26/58
Box Out for Fuel Hydrant
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
27/58
Bird Eyes View of Completed Apron
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
28/58
Block Paving
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
29/58
Integrated Apron Design
Drainage Systems
Fuel Hydrant Airfield Lighting
Passenger Loading Bridge
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
Apron Markings Apron Flood Lighting
400Hz
PCA Etc.
-
7/30/2019 ICAO Construction
30/58
Airfield Lighting
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
31/58
Design Coordination
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
32/58
Construction Supervision
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
33/58
Joint Cutting Out of Line
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
34/58
Slump Problems Sagged Edge
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
35/58
Saw Cutting Problems
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
36/58
Spontaneous Uncontrolled Crack
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
37/58
Rejected and Break Out!!!
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
38/58
Paving Train Method
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
39/58
Joint Problems
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
40/58
Dowel Problems
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
41/58
Design Issue Shrinkage Stress Crack
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
42/58
Design Issue
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
43/58
Corner Crack
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
44/58
Dowel problem
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
45/58
Hand Laid Method with Form Work
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
46/58
Vibration
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
47/58
Surface Finishing
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
48/58
Broom Finish
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
49/58
Curing with Wet Sand
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
50/58
PE sheet Application
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
51/58
Preparation for Next Concrete Pour
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
52/58
Localized Repairs of Broken Slabs
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
53/58
Excellent Crack
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
54/58
Advise Your Pilots on Construction Work
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
55/58
Disaster Can Strike in a Second
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
56/58
Send out NOTAM for any Work on Airside
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
Work on Airside is Serious Business
-
7/30/2019 ICAO Construction
57/58
Work on Airside is Serious Business
Safety First
www.scottwilson.compassionate | ambitious | collaborative | knowledgeable
-
7/30/2019 ICAO Construction
58/58
THANK YOUTHANK YOU