i-74 bettendorf local roads meeting

Post on 19-Jan-2015

3.067 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

November 7, 2012 Bettendorf Local Roads Presentation

TRANSCRIPT

1

I-74 Bettendorf Local Roads Meeting

November 7, 2012Bettendorf City Hall1609 State StreetBettendorf, Iowa

2

Funding Update

Bettendorf, Iowa

Moline, Illinois

Davenport, Iowa

3

Funding Update

•Projected Funding▫Federal Transportation Bill passed on 7/7/12

4

Funding Update

•Projected Funding▫Iowa DOT 2013 -2017 Program

DRAFT 2013 - 2017 IOWA HIGHWAY PROGRAM

RTE ADT LOCATION MILES TYPE OF WORK 2013 2014 2015 2016 2017

74 20300 53RD ST INTERCHANGE IN DAVENPORT

EROSION CONTROL

250

74 34800 IN BETTENDORF AND DAVENPORT

2.5 RIGHT OF WAY 4208 4715 4201 3734

GRADE AND PAVE

13700

▫Illinois DOT 2013 -2018 Program

▫$73 Million

5

Funding Update

6

Funding Update

7

Funding Update

8

Bettendorf Local Roads – Advance Work

Bettendorf, Iowa

Moline, Illinois

Davenport, Iowa

9

•The letting date is September 16, 2014. 

•Potential changes were possible due to the advancement of the local roads. 

  

Bettendorf Local Roads – Advance Work

10

Bettendorf Local Roads – Advance Work

11

•Eliminate the State Street to Gilbert Street Diagonal Connection▫Original design closed State Street for the new I-74

piers

▫New piers not constructed, so State Street can stay open

▫Diagonal connection is no longer needed for staging

▫Land occupied by the connection could become developable

▫State Street will need patching and/or resurfacing

▫Ownership of State Street will transfer to the City

Bettendorf Local Roads – Advance Work

12

Bettendorf Local Roads – Advance Work

13

•Geometry Existing State Street & Proposed US 67 ▫Sharp skew angle was not desirable

▫Eliminate the connection

Access to the area between 11th and 12th Streets would be via new US 67, south on 12th Street and west on State Street - Rejected

▫Modify the connection

State Street one way between 11th and 12th Street

 QCA Spas and Adel would have right-in/right-out entrances as they do today.

Bettendorf Local Roads – Advance Work

14

  

Bettendorf Local Roads – Advance Work

15

Bettendorf Local Roads – Initial

16

Bettendorf Local Roads – Current

17

•WB I-74 Exit Ramp to State Street/US 67

▫To be maintained at all times▫Temporary connection in the interim condition

•Intersection of State Street and 12th Street▫May experience capacity issues in the interim

condition

▫Kimberly and State Street accessing the EB entrance ramp

▫Intersection often experiences delays now

Bettendorf Local Roads – Key Issues

18

Bettendorf Local Roads – Current

19

•Calvert Drive to Remain Open Until I-74 Built▫ If closed, traffic exiting businesses north of

Mississippi Blvd on 14th Street would need to detour north to Central then back on 15th Street to access the downtown

▫Existing traffic on Calvert Drive is light, however a detour may cause confusion for drivers 

•Parking

▫Some parking lot spaces will be lost

▫There is the potential to gain some spaces along State Street.

Bettendorf Local Roads – Key Issues

20

  

Bettendorf Local Roads – Parking

21

  

Bettendorf Local Roads – Properties

22

•Total Acquistion (Blue Shaded Lots)▫Largely, existing building have been removed

▫Contract to remove six buildings (320, 327, 335, 359, 361, 368)

▫Purchased but not possesed (341, BP Station 402 State St)

•Parcel 365▫412 -16th St should be marked with red cross

hashes. This is a parcel that is possibly a total acquisition

Bettendorf Local Roads – Properties

23

  

Bettendorf Local Roads – Properties

24

•Properties Acquisition▫ The goal is to acquire all properties by the end of

2013

▫All of the properties will need to be cleared prior to the September 2014 letting

Bettendorf Local Roads – Properties

25

  

Bettendorf Local Roads – Properties

26

•Potential Excess Property

▫Property outside the red dashed “need line”

▫Proposed ROW lines not finalized until after the local road project is fully designed

▫Not likely dispose of any excess property along the I-74 mainline and ramps until this work is completed

▫Lots needed for mainline construction are all lots between 13th Street and 15th Street

Bettendorf Local Roads – Properties

27

  

Bettendorf Local Roads – Properties

28

Plan Development Update

Bettendorf, Iowa

Moline, Illinois

Davenport, Iowa

29

Iowa Plans - 100% Unapproved Plans

•Roadway Plans▫Contract A (161) – Completed▫Contract B (205) – Completed▫Contract C (206) – Completed▫Contract D (207) – Completed▫Contract E (226) – Will be Completed in

December•Signing Plans

▫Being prepared by the Iowa DOT•ROW plans and plats (partial takes)

▫Work to begin in March 2013• Iowa Utility Process

▫Utilities to owners in December 2012

30

Iowa Plans - 100% Unapproved Plans

•Bridge Plans▫Iowa Ramps A, B, C and D – Completed▫WB Iowa Viaduct – Completed▫EB Iowa Viaduct – Completed▫WB North Approach – Completed▫WB South Approach – Completed▫EB North Approach – Completed▫EB South Approach – Completed▫100% Arch Substructure Plans – Completed▫100% Arch Superstructure Plans – Completed

•Bridge Demolition Plans ▫Suspension Spans – Completed▫Truss Spans – Completed

31

Illinois Plans•Roadway Plans: 90% Complete Submittal

▫Contract A – Completed▫Contract B – Completed▫Contract C – Completed▫Contract D – Will be Completed in January

•Structure Plans▫Pre-Final Plans Completed by February 15 2012

•ROW plans and plats (partial takes)▫Work began in March 2012

•Illinois Utility Process▫90% Plans sent to utilities/agencies in late August▫Utility owners response due December 31st

Typology E – Landscape Design – Bettendorf, Iowa

32

04/10/2023

Typology E- Typical Landscape Design

33

04/10/2023

I-74 Corridor Landscape

•Assume mow edge along roadway entire mainline at interchange/ramps

•Plans show plant material areas with idea that some earthwork can occur to enhance character and conditions (i.e. aesthetics, slopes & drainage)

•Possibility of Right of Way fence enhancement

•Possibility of selective thinning of existing tree species/understory plant material

34

04/10/2023

35

I-74 Bettendorf Local Roads Meeting

THANK YOU!

top related