I-410 / I-10E Interchange February 9, 2016
I-410 / I-10E INTERCHANGE Open House Public Meeting
February 9, 2016
I-410 / I-10E Interchange February 9, 2016
I-410 / I-10E
INTERCHANGE
IMPROVEMENTS
2
BEXAR COUNTY
OPEN HOUSE PUBLIC MEETING
FEBRUARY 9, 2016
5:30 P.M. – 7:00 P.M.
COPERNICUS COMMUNITY CENTER
5003 Lord Road
San Antonio, TX 78220
N
I-410 / I-10E Interchange February 9, 2016
Proposed Interchange
3
N
I-410 / I-10E Interchange February 9, 2016
Project Location
4
W.W
. W
hite
Rigsby Ave.
N
E. Houston St.
E. Houston St.
Foste
r R
d.
I-410 / I-10E Interchange February 9, 2016
Need and Purpose
Need
– To improve operations and relieve congestion at I-410 / I-10E Interchange
and connections between Old Seguin Road, FM 1346 (E. Houston St.),
U.S. 87 (Rigsby Ave.), and N. Foster Road.
Purpose
– To provide operational improvements and relieve congestion by:
• Reconfiguring and reconstructing the I-410 / I-10E Interchange; and
• Enhancing frontage roads
5
I-410 / I-10E Interchange February 9, 2016
Existing Traffic Conditions
6
LOS A & B
LOS C
LOS D
LOS E
LOS F
I-410 / I-10E Interchange February 9, 2016
Proposed Traffic Conditions
7
LOS A & B
LOS C
LOS D
LOS E
LOS F
I-410 / I-10E Interchange February 9, 2016
Existing and Future Traffic (I-410)
8
72300
80400
91700
96400
101200
105800
110500
0
20000
40000
60000
80000
100000
120000
2010 2014 2020 2025 2030 2035 2040
I-410 Average Daily Traffic
I-410 ADT
I-410 / I-10E Interchange February 9, 2016
Existing and Future Traffic (I-10)
9
72000 72200
83100
88200
93100
98100
103100
0
20000
40000
60000
80000
100000
120000
2010 2014 2020 2025 2030 2035 2040
I-10 Average Daily Traffic
I-10 ADT
I-410 / I-10E Interchange February 9, 2016
Project Description
10
W.W. White / Corner
Pkwy Connection
Construct Direct
Connection Interchange
Reconfigure Ramps and
Provide Auxiliary Lanes
Between Ramps
Convert Frontage
Road to One-way
Provide Continuous
Frontage Roads
Provide U-Turns at
Major Cross Streets
N
I-410 / I-10E Interchange February 9, 2016
Continuous Flow Intersection (CFI)
11
CFI Benefits
Enhance safety (fewer potential crash points)
Reduce delays
Improve travel times
Higher capacity than “traditional intersection”
I-410 / I-10E Interchange February 9, 2016
Continuous Flow Intersection (CFI)
12
N Left Turn in Advance
of Intersection
No “Conventional”
Left Turns Allowed
X
I-410 / I-10E Interchange February 9, 2016
Environmental Studies
Additional ROW will be required
Historic-age resources will be evaluated
The following studies will be conducted:
– Archaeological Background Studies,
– Community Impact Analysis,
– Hazardous Materials Initial Site Assessment,
– Traffic Noise Analysis,
– Section 4(f) Review, and
– Biological Evaluation
FEMA coordination
13
I-410 / I-10E Interchange February 9, 2016
Project Schedule
Environmental Clearance – Spring 2017
Ultimate Interchange Cost = $500M (approximate)
Funds for entire project are currently not available
Project could be built in phases as funding is available (possible 2018
construction)
Possible 1st Phase
Priority Direct Connectors
Ramp Reconfigurations
Auxiliary Lanes
14
I-410 / I-10E Interchange February 9, 2016
Provide Your Comments
1. Give Comment Card to TxDOT Staff Tonight
2. Provide Comments to Onsite Court Reporter
3. Fax Comments to: (210) 354-2964
4. Mail Comments to: Ximenes & Associates, Inc.
Attn: Sonia Jimenez
411 Sixth Street
San Antonio, TX 78215
5. Email Comments to: sjimenez@xa-sa.com
Public Meeting Report will be posted at www.txdot.gov when analysis is complete
15
Options For Commenting
Deadline For Comments: February 19, 2016
I-410 / I-10E Interchange February 9, 2016
Thank You For
Your Participation
16