hyspec status
Post on 22-Jan-2016
24 Views
Preview:
DESCRIPTION
HYSPEC status. June 16, 2010. HYSPEC Overview. 6~15m Shielding. External building. 15~33m Shielding. Chopper Box B Shielding. Drum Shield. Sample position. Detector Vessel. Detector Vessel, designed and in procurement. Removable hatch for course collimator access. 1/8 ” O-Ring. - PowerPoint PPT Presentation
TRANSCRIPT
HYSPEC status
June 16, 2010
6~15m Shielding
15~33m Shielding
External building
Drum Shield
Detector Vessel
HYSPEC Overview
Sample position
Chopper Box B Shielding
Detector Vessel,designed and in
procurement
Removable hatch for course collimator access
Front section removable
1/8” O-Ring
¼” O-Ring (Hidden)
PIP Shield all in, &Guide installation
Secondary shutter being installed
Shield blocks delivered
Shield blocks getting ready
Monochromator delivered
Monochromator Shield component lead pours