P/N 3121269MARCH 2000
-
2These instructions are for use with Hydril ActuatorP/N 3121269 & P/N 3126581
To be used as a guideline for the Disassembly andAssembly of prior Hydril Actuator models P/N3115185, P/N 3117775, and P/N 3120335
Refer To Hydril Kellyguard and Actuator ManualManual 9602B to determine P/Ns, bolt and nuttorque's, and lubricant requirements
A ssembly and Disassembly Instructions
ACTUATOR P/N 3121269
-
3(1) PLASTIC MALLET(2) BLADE SCREW DRIVERS(1) 2.0 X 2.0 X 18.0 WOODEN BLOCK(1) 3/4 X 3/4 X 4.0 BRASS ROD(1) 1.0 X 3.0 NYLON STRAP(1) 2,000 LB. JIB HOIST
HAND TOOLS NEEDEDHAND TOOLS NEEDED
Tools needed in addition to therequired tool list in the Hydril KellyGuard Actuator Manual (# 9602b):
-
4FULLY ASSEMBLIED HYDRIL ACTUATOR
-
5 WITH THE ACTUATOR IN THIS POSITIONREMOVE (4) TIE ROD NUTS.
-
6 AFTER (4) TIE ROD NUTS ARE LOOSE REMOVEUPPER STATOR HOUSING
-
7 SET UPPER ROTOR ASSY ON TABLE
BE CAREFUL TO KEEP CLEAN
-
8 ACTUATOR ASSEMBLY WITH UPPERROTOR REMOVED
-
9 REMOVE CRANK RETAINER PLATE NUTS
(4) RETAINER NUTS
-
10 REMOVE (2) CRANK RETAINER PLATES
-
11
USE PLASTIC MALLET TO REMOVE(2) CRANK SHAFTS
-
12 UNSCREW (2) LOCATING PINS
-
13 REMOVE (2) LOCATING PINS COMPLETELY
-
14
USING A PLASTIC HAMMER AND PIECE OF WOOD,DRIVE PISTON DOWNWARD
ALTERNATE HITTING PISTON AT 180 DEGREESINTERVALS
-
15
ALTERNATE HITTING 180 DEGREES UNTILPISTON IS IN THE DOWN POSITION
-
16 LIFT OUTER CYLINDER UNTIL FREE
-
17
OUTER CYLINDER NOW FREE TO REMOVE
-
18
MAY NEED TODRIVE
PISTON FROMOUTER
CYLINDERUSING APLASTIC
HAMMER ANDWOOD WITHTHE OUTERCYLINDER
SUSPENDED
-
19
COMPLETELY REMOVE OUTER CYLINDERAND SET ASIDE
KEEP CLEAN
-
20
LIFT INNER CYLINDER TILL FREE THENCOMPLETELY REMOVE
-
21 REMOVE (4) TIE RODS
-
22 (4) TIE RODS REMOVED
-
23
REMOVE CRANKS ARMS FROM BOTH SIDES
-
24 REMOVE PISTON AND SET ASIDE
-
25
LIFT AND TURN OVER LOWER ROTOR ANDSTATOR ASSEMBLY
-
26
WITH THE LOWER ROTOR AND STATORASSEMBLY TURNED OVER, SET ON TABLE
-
27
REMOVE (8) HEX HEAD SCREWS FROM UPPERROTOR AND STATOR ASSEMBLY
-
28
USING A SMALL CHISEL AND PLASTIC HAMMER BENDBACK WASHER TABS TO ALLOW ACCESS TO REMOVE
(8) HEX HEAD BOLTS FROM THE LOWER ROTORAND STATOR ASSEMBLY
-
29
REMOVE (8) HEX HEAD SCREWS FROM LOWERROTOR AND STATOR ASSEMBLY
-
30
WITH (2) SCREW DRIVERS 180 DEGREES APARTSEPARATE LOWER ROTOR AND STATOR
ASSEMBLY
-
31
LIFT LOWER STATOR FROM LOWER ROTORAND SET ASIDE
-
32
REMOVE THE UPPER STATOR FROM UPPERROTOR AND SET ASIDE
-
33
USING A SCREW DRIVER CAREFULLY PRY OUTRETAINING RING FROM UPPER ROTOR
-
34
USING (2) SCREW DRIVERS CAREFULLY REMOVETHE RETAINING RING FROM THE UPPER ROTOR
-
35
RETAINING RING REMOVED FROM THEUPPER ROTOR
-
36
REMOVE RETAINING RING FROM LOWER ROTOR
-
37
USING A PLASTIC HAMMER AND A BRASS BAR,CAREFULLY DRIVE DOWN BEARING RETAINERRING AND BALL BEARING FROM UPPER ROTOR
-
38
USING A PLASTIC HAMMER AND A BRASS ROD,DRIVE DOWN BEARING RETAINER RING AND BALL
BEARING FROM LOWER ROTOR
-
39 REMOVE BALL BEARING FROM UPPER ROTOR
-
40 REMOVE RING BEARING RETAINER FROM
UPPER ROTOR
-
41 REMOVE BALL BEARING FROM LOWER ROTOR
-
42
REMOVE BEARING RETAINER RING FROMLOWER ROTOR
-
43 REMOVE (2) UPPER POLYPAK ROTATING INNER SEALSFROM BOTH THE UPPER AND LOWER STATORS
-
44
REMOVE (2) LOWER POLYPAK ROTATING INNER SEALSFROM BOTH THE UPPER AND LOWER STATORS
-
45
DISCARD (4) OLD/USED POLYPAK ROTATINGINNER SEALS
-
46 CAREFULLY REMOVE (2) OUTER PISTON SEALS
AND DISCARD
-
47
REMOVE AND DISCARD (2) INNERPISTON SEALS
-
48
ACTUATOR COMPLETELY DISASSEMBLIED ANDLAY OUT ON TABLE READY FOR REASSEMBLY
-
49
INSTALLATION OF POLYPAK ROTATING SEALS INUPPER AND LOWER STATORS
INSTALL FRONT OF SEAL IN BOTTOM AREA OF UPPERAND LOWER STATORS AND WORK SEAL CLOSE TO YOUINTO THE UPPER GROOVE
-
50
PULL SEAL INTO UPPER GROOVE AND WORK THE SEALINTO UPPER GROOVE AROUND THE ROTOR
INSTALL POLYPAK ROTATING SEAL INTO LOWERGROOVE OF BOTH UPPER AND LOWER STATORS
-
51
GREASE ROTATING SEAL AREA OF UPPER ANDLOWER ROTORS
-
52
PLACE UPPER BEARING RETAINER RINGINSIDE BOTTOM AREA OF UPPER ROTOR
-
53 INSTALL BALL BEARING IN UPPER ROTOR
-
54
USING A PLASTIC MALLET, TAP BALLBEARING INTO PLACE
-
55 USING HANDS, INSTALL RETAINING RING
INTO GROOVE
-
56 LOWER UPPER STATOR DOWN ONTO
UPPER ROTOR
-
57 INSTALL (8) HEX HEAD CAP SCREWS
AND TIGHTEN
-
58 TIGHTEN (8) HEX HEAD BOLTS
-
59 PLACE LOWER BEARING RETAINER RING INTO
BOTTOM OF LOWER ROTOR
-
60
PLACE AND INSTALL BALL BEARING INTO LOWERROTOR
USING A PLASTIC MALLET, TAP BALL BEARINGINTO PLACE
-
61
USING HANDS INSTALL RETAINING RING INTOLOWER ROTOR
-
62 PLACE LOWER STATOR OVER LOWER ROTOR
-
63
INSTALL (8) TAB WASHERS AND (8) HEX HEADSCREW AND TIGHTEN
-
64
USING A SMALL METAL CHISEL, BEND WASHERTABS INTO A LOCK POSITION AROUND
HEX HEAD SCREWS
-
65 INSTALL OUTER PISTON SEALS
-
66 INSTALL INNER PISTON SEALS
-
67 NOTE LOCATION OF LOCATING SLOT
-
68
PLACE PISTON ONTO LOWER STATOR AND ROTORASSEMBLY
NOTE: PISTON LINK MUST BE POINTING AWAY FROMLOCATING PIN AS SHOWN IN PICTURE
-
69 INSTALL (4) TIE RODS AND TIGHTEN
-
70 (4) TIE RODS INSTALLED
-
71 INSTALL (4) CRANK ARMS
-
72
(4) CRANK ARMS INSTALLED
-
73 GREASE OUTSIDE OF INNER CYLINDER PRIOR
TO INSTALLATION
-
74 LOWER INNER CYLINDER INTO LOWER ROTOR
-
75 NOTE: INNER CYLINDER LOCATING PIN AT BOTTOM I.D.
OF CYLINDER AND THE LOCATING GROOVE IN ROTOR
-
76
USING A PLASTIC MALLET, TAP INNER CYLINDER INTOPOSITION
WATCH TO MAKE CERTAIN LOCATING PIN ON BOTTOMOF INNER CYLINDER LINES UP WITH LOCATINGGROOVE IN ROTOR
-
77 GREASE I.D. OF OUTER CYLINDER
-
78
LOWER OUTER CYLINDER DOWN ONTO LOWER ROTOR
NOTE: MAKE CERTAIN TO LINE UP THE LOCATINGNOTCH IN THE OUTER CYLINDER WITH THE LOCATINGPIN ON THE LOWER ROTOR, SEE PICTURE
-
79
ONCE AGAIN: MAKE CERTAIN LOCATING NOTCHAND PIN ARE LINED UP CORRECTLY AS OUTER
CYLINDER IS LOWERED INTO PLACE
-
80
USING A PLASTIC MALLET TAP OUTERCYLINDER IN PLACE
-
81 INSTALL (2) LOCATING PINS AND TIGHTEN
-
82 INSTALL 2ND LOCATING PIN
-
83
PREPARE FOR ISTALLATION OF (2) CRANK SHAFTS
NOTE LOCATION OF THE (2) KEYS IN THE SHAFTSPRIOR TO INSTALLATION
-
84
PRIOR TO INSTALLING CRANK SHAFTS USE FINGERTO POSITION CRANK ARMS PRIOR TO THE
INSTALLION OF THE CRANK SHAFT
-
85
INSTALL (2) CRANK SHAFT
NOTE: POSITION OF INDICATING NOTCH ON CRANKSHAFT MUST BE IN THE UP POSITION
-
86 BOTH CRANK SHAFTS INSTALLED
-
87
INSTALL (2) CRANK RETAINER, (4) CRANKLOCKWASHERS, (4) CRANK RETAINER
LOCKNUTS AND TIGHTEN
-
88
LOWER UPPER ROTOR ASSEMBLY DOWN ONTO (4) TIEROD BOLTS
NOTE: PLACE (4) TIE ROD HEX NUTS LAYING LOOSE INTHE (4) MILLED SLOT AREAS IN ROTOR PRIOR TOLOWERING ROTOR INTO PLACE
-
89
NOTE: MAKE CERTAIN TO LINE UP THELOCATING NOTCH AND LOCATING PIN
BEFORE TAPPING INTO PLACE
-
90
NOW CAREFULLY START THE (4) TIE ROD HEXNUTS AND TIGHTEN EVENLY
-
91 A FULLY ASSEMBLIED UNIT
-
92
PRIOR TO MOUNTING ONTO A KELLY GUARD
PLACE (2) MOUNTING SLEEVE HALVES TOGETHERWITH THE RETAINING GROOVE UP
INSTALL RETAINING RING
-
93
PRIOR TO PLACING ACTUATOR OVER THE MOUNTINGSLEEVES AND KELLY GUARD USE (2) ALLEN WRENCHS
TO ROTATE THE CRANKS IN THE POSITION SHOWN
-
94
IF FURTHER INFORM A TION ISNEEDED REGARDING THE
HYDRIL ACTUATOR,
CONTACT HYDRIL COMPA N Y , HTC,
HOUSTON, TEX A SPHONE # 1-281-449-2000SA L ES AND MARKETINGFA X # 1-281-985-8665
OR CONTACT THELOC A L H YDRIL SA L ES AND SERV ICE. CENTER IN YOUR AREA