HUMASOL

Making Renewable Energy Accessible To Everyone!

May 1, 2013

General Presentation

Desguinlei 218, 2018 Antwerp

WHAT HAVE THIS PEOPLE IN COMMON…..

THIS ARE ALL ENGINEERING STUDENTS DRIVEN BY PASSION…..

MAKING RENEWABLE ENERGY ACCESSIBLE TO EVERYONE!

Mission statement

Offer developing aid:

Financial

Technical

Focus on ecological and sustainable projects.

Collaborate with local partner to enable them to:

Maintain

Repair

Reproduce

installations in their community.

Offer a professional guidance towards project students

1 2

3

Humasol is founded to solve this “missing link”

• Broad theoretical knowledge

• Few practical opportunities

• Few international internship opportunities

• Looking for a credible good image in society (corporate social responsibility)

• Searching for highly motivated, entrepreneurial, talented people

2. Students

1. Local partner

3. Professionals

• Often lack of reliable energy supply

• Lack of technological knowledge

• Lack of funding

Our team…

Humasol Members 6

… make this world a better place

… have sustainable impact

… offer other students the opportunity to experience the same enriching adventure

… stay informed about their project and stay in touch with the local partner and other project students

… make the future engineers more creative

… develop their organizational and communication skills

… work with fun people

Members joined Humasol because they want to …

Board of Directors (BoD)

Geert SerneelsPresidentpresident@humasol.be+32 (0) 478 80 52 00

Sam van DyckSecretarysecretary@humasol.be+32 (0) 494 75 20 62

Glenn GyselsProject Managerprojects@humasol.be+32 (0) 474 36 13 73

Stijn DesmetFinancefinance@humasol.be+32 (0) 494 24 80 21

Ann GysbrechtsHuman Resourcesrecruiting@humasol.be+32 (0) 473 66 04 32

Vincent EveraertsCommunicationcommunication@humasol.be+32 (0) 499 47 37 08

Advisory board20 Project students

35 active members

…driven by passion and working on a voluntary bases

Since 2007 Humasol has grown and built several sustainable energy installations with local project partners…

Peru* Solar Boilers* Wind turbine* Water turbine* ELC* Electricity grid Argentina

* Solar Boilers* Wind Turbine* Biodigestor

Senegal* Solar boiler* PV-solar panels• Convertor• PV Pumping

Kenya* Irrigation system

Uganda• Solar pump• Wind Turbine

Cambodia• PV System

Location

La Cascarilla, Peru

Sisophon, Cambodia

Babada, Uganda

Objective

▪ Off-grid PV 3.0

Students

▪ Thomas Bollen (KU Leuven)

▪ Stijn Proesmans (KU Leuven)

▪ Steven Claessens (KU Leuven)

Project Coach

▪ Hydropower Turbine ▪ Maaike Vanhee (KaHo SL)

▪ Phebe van den Heyning (KaHo)

▪ Wouter Deforche (KaHo SL)

▪ Jens Moens (KaHo SL)

▪ Zoe Westerlinck (Groep T)

▪ David Schockaert

▪ Data logger ▪ Mathieu De Zutter (KaHo SL)▪ David Schockaert

▪ Brecht Reynders

▪ Biodigestor ▪ Damiaan Dumoulin (Groep T)▪ Glenn Gysels

▪ ELC 4.01 ▪ Arnaud Schaeken ▪ Felix Hornaert (KU Leuven)

▪ Jan-Pieter D’Anvers (KU Leuven)

▪ Wouter Parys (KU Leuven)

▪ Pieter Boone (UGent)

▪ Benjamin Dieudonné (UGent)

▪ Christel Verbesselt (KU Leuven)

▪ Egi Nazarej (VUB)

▪ Tom Molderez▪ Solar Pumping 2.0

▪ Wout Poncelet (KU Leuven)

▪ Simon Candries (KU Leuven)

▪ Lukas Kesteloot (KaHo SL)

▪ Wout Cordeel & Korneel Pardaens

▪ Wind Turbine 3.0

Overview of projects 2013 – 2014

Location

Belgium

Objective

▪ Steam Pump ▪ Wouter Schoonvliet (De Nayer)

▪ Wout Verelst (De Nayer)

▪ None

▪ Solar Cell Encapsulant ▪ Maarten Hermans (KU Leuven)▪ Kenneth van den Bergh

▪ Hydro Power Business ▪ Gillis Beun▪ Thibault Jolie▪ Janthe De Nil▪ Wouter Teurlinckx▪ Ine Weckx

▪ Leen Janssens

Project Coach Students

AFD

▪ FlexoPanel Start-Up ▪ Toon Goes▪ Sam Spaas▪ Ruben Baumer▪ Michiel van Acoleyen▪ Toep van Mierlo

▪ Bram van Meldert

Overview of projects 2013 – 2014

- Hydro Power Turbine- ELC- Data logger- Biodigestor

Jaen, Peru

Jaen, Peru 12

- Solar water pump- Wind water pump

Tororo, Uganda

Tororo, Uganda 14

Sisophon, Cambodia

• Project request from Consul-General of Cambodia:

• School MLUNG – Community Chob Vari –Cambodia

16

Project Planning

16

First step Literature study Design Practical pilot

▪ List of references (Experts en sources)

▪ Specifications and objectives (together with local partner)

▪ Look up theory of subject and read former reports

▪ Collect concepts (with budget estimation)

▪ Choose concept

▪ Practical development of concept

▪ Calculations

▪ Practical

- Materials & techniques

- Implementation on location (how to?)

▪ Feedback from local partner

▪ Safety & Risk Analysis

▪ Planning on location

1 wk 8 weeks2 wks

Description

Deliverables

Objec-tives

▪ First budget estimation

▪ Year planning

▪ +-3 p. about subject, concepts and specifications

▪ Document (max 25p + app) and presentation of all subjects above

▪ Final budget estimation

▪ Planning on location

2 weeks

▪ Objectives

▪ Make year planning

▪ Define specifications and objectives (together with local partner, project coach and location manager)

▪ Agree with your university on credits and curriculum

Sketch project Conceptual design Practical design

FebNov Dec Apr (Easter)

Logistics

▪ Prepare parts list

▪ Determine final budget

▪ Contact local partner

- Check prices and availability of parts.

- Make concrete appointments with shops, welders, …

2 weeks

▪ Parts list

▪ (Optional) Slightly corrected budget estimation

Preparation for work on site

Prove practical feasibility

▪ Construction of working model to test practicality

▪ Analyse and solve practical issues that you encounter

▪ Prototype & Tests

Intermediate report

2 wks

PresentationFinal literature study

Projectoutline

Choice concept

Application

Literature Study

Design & Budget

Practical pilot & Logistics

Construction of project

Project planning

17

November

Intermediate Report

& presentation

Final literature studyDecember

April

June

July-Sept. (2 months)

1 year project Final report

Sept.-Okt.

What we expect from a student

Collaboration with local partner

Process and quality of work

Project within budget

Efficient communication

Solidarity with Humasol

Sustainable, robust & safe

design

Humasol

• Collaboration with local citizens

• One-pager about safety

• One-pager about installation for broader population, e.g.

• Flow chart of physical principles

• Appointment of local technicians (to maintain the installation)

• User manual for local technicians

• Project needs to remain within budget

• Detailed financial budget, verified by Humasol & local partner

• Detailed list of expenses

• Detailed explanation of variances vs. budget (if any)

• Regular communication with Treasurer in case of variances

• Organization of and attendance to Humasol activities

• Request of subsidies of local government

• Right level of internal communication (within team, towards Humasol)

• Update blog whilst on site

• Communication with local partner about local boundary conditions affecting project design

• Pragmatic design, checked with external experts

• Working installation

• Tested at least 1 week

• Delivering planned output (e.g. kWh)

• Meeting the Humasol deadlines

• High quality of deliverables

• High quality of the presentation

Business Model – Social Enterpreneurship

Long-term social impact

Enterpreneur

Technology & concept Proof of

concept

Plan

Strategy

Implemen- tation

Constructio

n & fo

llow-

up

Social entrepreneu

r

Idea

▪ Establishing contact and correct info on need and boundary conditions

▪ Implementation of first machine

▪ Building the organization and socio-economic model

▪ Hand-over to local partner

Description

Projects

Key stakeholders

▪ No full fledged project on site

▪ Visits of location manager (or any other equivalent)

▪ Technical installation (2-3 engineering students / machine)

▪ Educational project (2-3 engineering students)

▪ Socio-economic model and organisation (2-3 comm. engineers / other)

▪ Communication with location manager and local partner

▪ Ad-hoc support from distance

▪ Location manager ▪ Location manager▪ 2-3 engineering students

▪ Location manager▪ 2-3 engineering students▪ 2-3 comm. engineers /

other

▪ Location manager

Exploration phase Installing the machine(s)

Building the sustainable model Hand-over phase

Business Model – Social Enterpreneurship

Humasol Fiesta 2012 21

Humasol Day 22

Humasol in the media…