HiRadMat : report from WG2 – WANF dismantling

December 10, 2009S. Evrard

1

• WANF cleaning• T1 removal• Access and Ventilation hardware• Integration : naming convention• Short Term Planning : co-activities in January 2010• Long Term Planning

Agenda

WANF cleaning

December 10, 2009S. Evrard

2

• Technical specification worked out with RP : WANF cleaning• PE launched (S. Sonnerat, purchase officer)• 4 companies enquired (all contacted):

– Cerap (F, Mr X. Labat)– Salvarem (F, Mr B. Agret)– Techman (F, Mr O. Rotelle)– Technubel (B, Mr K. Lenie)

• Deadline offers return: Tues. 15.12• Work foreseen in week 4 (18 22 January)

T1 removal

December 10, 2009S. Evrard

3

• MCA + 6 TAX blocks• Procedure prepared by EN/HE• Forklift shielding study in progress• Forklift preparation in Weeks 2 • Work foreseen in week 3 (11 15

January)

ACCESS

December 10, 2009S. Evrard

4

Ventilation door

December 10, 2009S. Evrard

5

Co-activities in January 2010

December 10, 2009

6

EN-HE

EN-HE

EN-CVContractor

EN-HE

GS-ASE, IT

-CS

EN-HE: T1 : MCA + Tax blocksEN-HE: furet removalEN-HE: Electrical cabinet refurbish.