Human Analysis & Requirements Planning System (HARPS)
AUTOMATED NTSP DATABASE
Gayla LutmanCSC(559-585-1907)glutman@csc.com
2
OPNAVINST 1500.76B
•Per OPNAV direction, future NTSPs are to be electronic versions posted on applicable web based database.
•New instruction 1500.76C - mandates use of SPAWAR HARPS database.
–Scheduled for distribution later this year
3
What is HARPS
The Human Analysis & Requirements Planning System (HARPS) provides:
•A platform and guidance for data collection and analyzes supporting efficient management of the human element of work for a materiel solution.
•Automated business processes and workflow to collaboratively define, analyze and document human demand signals for the Manpower, Personnel, & Training (MPT) communities.
4
Background
•Developed under agreement with the Virtual Systems Command for Human Systems Integration (HSI VS)
–MOA Signed out by all of the SYSCOM Commanders
•SPAWAR, NAVAIR, NAVSEA–HSI Integrated Architecture development identified processes most ripe for automation
•Initially funded by CONGRESS–Part of the larger SEAPRINT Project
•Implemented by OPNAV N151 •Developed/Maintained by SPAWAR
5
NTSPTRPPM
HARPS Portal
•NTSP• Common NTSP data storage across SYSCOMS• Automated workflow & threaded discussion• Standardized NTSP output
• Standard Database• Common Software• Standard Edits• Repeatable Processes
TASK ANALYSIS
• Multiple views of the data• Drive M&P resource decisions• Establish framework for training requirements
NAVAIR
NAVSEA
SPAWAR
ENTERPRISE
STAKEHOLDERS CMATT
6
DRAFT – REVIEWERSPROVIDECOMMENTS
PMWEditNTSP
InDevelopment
Concurrence UploadConcurrence Letters
PENDINGAPPROVAL
Sponsor UploadApproval Letter
LockNTSP
ApprovedNTSP
No Issues
1
3
Issues
In-edit
In Review
HSI Voting
PROPOSED
2
PMWEditNTSP
LockNTSP
Review
MessageBoard
Discuss
Review
MessageBoard
Discuss
30 DayReview
End 30 DayReview
All Accept30 DayReview
Reject
PMWNTSPCreation
LockNTSP
NTSPEditable
NTSPEditable
NTSPEditable
AdjudicationsClosed
Roles
AcceptSubmitTo QA
QAReview
Reject
DRAFT COLDS NTSP DATABASE UPLOAD INTO HARPS
7
ROLES
•Program Manager (PM) – Bob Dittmer (acting on behalf of SSPO)
–Edits data–Grants access to COLDS automated database
•Action Officer (AO) – Gayla Lutman–Assigned by PM–Grants access to reviewers and editors
•Reviewers–Assigned by PM or AO in database as directed by user commands–Read-only access to NTSP data–Submits recommendations/changes through threaded discussions via the Workflow Tool
8
ROLES (cont’d)•Workflow Manager –Jordan Haleftrias (SPAWAR)
–Participates in threaded discussion–Advances NTSP from Draft to HSI acceptance, request PM action, closes threads
QA Representative – designated by PMo Checks integrity of NTSP before releasing to
community N15/N151 – Manpower approval (NAVMAC)o Uploads concurrence letters, participates in discussions
Resource Sponsor (N85)o Approves NTSP – uploads approval letter
9
COLDS NTSP REVIEWERS
•Designated reviewer names submitted to the Project Manager – Bob Dittmer•PM/AO enters Reviewer names into HARPS•Reviewers notified via email - then log in to HARPS to set up profile
–Must use CAC card–Training available via computer/phone by SPAWAR
•Reviewers notified via email when NTSP is placed in DRAFT STATE for review
10
Contact Jordan Haleftrias for HARPS Training
https://harps.nmci.navy.mil/
11
WORKFLOW HOMEPAGE SCREEN
04/07/2023
12
DOCUMENT SCREEN
04/07/2023
13
THREADED DISCUSSION
14
REPLY SCREEN
04/07/2023
15
NEW THREADED DISCUSSION SCREEN
16
WAY AHEAD
•Commands review TOs 7 Jul– Submit changes to NBG
•Commands resolve TO differences 22 Jul•CSFE/CSC complete revision of NTSP 20 Aug•Commands forward Designated NLT 20 Aug Reviewer names to PM•Designated Reviewers request HARPS NLT 16 Sep Training from SPAWAR•CSFE/CSC complete upload of 20 SepCOLDS NTSP into HARPS database
17
WAY AHEAD
•Command’s Designated Reviewer notified by email when NTSP available for review on HARPS database – automatically generated through HARPS – 26 Sep (tentative date only)•Commands complete review of NTSP - 5 Oct 11
–Available in PDF format on HARPS database–Recommendations/comments/changes submitted via threaded discussions in HARPS
–Reviewers notified by email when new threaded discussion point is uploaded
•Issues must be resolved prior to submitting NTSP for approval
•Project Manager submits for approval.•NTSP completed when Sponsor uploads approval letter
18
WAY AHEAD
Issues not concurred through HARPS threaded discussions will require NTSP conference
Points of Contact Commands provide name no later than 30 JunAssigned to action items as requiredShould have at least 1 to 2 years remaining at command during review of NTSP