guide handi-matetm shedstratcousa.com/wp-content/uploads/2019/05/sliding-door-storage... · option...
Post on 03-Nov-2020
1 Views
Preview:
TRANSCRIPT
SLIDING - TYPE HM5
SHMSSSDHM5##
HOLD DOWN LUGS MUST BE INSTALLED
ACCORDING TO WIND CLASSIFICATION
WIND CLASSIFICATIONN1, N2 = 4x HOLD DOWN LUG (HMHL)
N3 = 8x HOLD DOWN LUG (HMHL)
Handi-MateTM Shed
INSTALLATIONGUIDE
2
x7 x6x4
SSPH
MW
SCN
R1
90
0#
#C
ORN
ER W
ALL
SH
EET
WA
LL S
HEE
T
RO
OF
SHEE
T
SSPH
MW
S19
00
##
SSPH
MR
S10
90
AZ
x2
BEFORE YOU START
TOOLS REQUIRED
COMPONENTS
Prior to installation, it is important that you contact your local government authority to determine if building approval is required.
To ensure that the installation and erection of your Stratco Handi-MateTM Shed proceeds smoothly you should confirm that all the components and materials listed on the delivery documentation, and in this installation guide, have been supplied. Carefully read this installation guide to familiarise yourself with all the steps involved, and ensure that you have the correct tools and equipment for the job.
NOTE: Use heavy gloves when handling steel sheeting and flashings and never attempt to install a shed in windy conditions.
3
x1 x1 x1 x1 x2 x2
SPLI
T W
ALL
SH
EET
SPLI
T D
OO
R S
HEE
T
TO
P D
OO
R C
HA
NN
EL
BO
TT
OM
DO
OR
CH
AN
NEL
VER
TIC
AL
DO
OR
CH
AN
NEL
DO
OR
JA
MB
! !
! !
SSPH
MSW
19
00
##
SSPH
MSD
19
00
##
HM
DC
TO
10
90
GA
HM
DC
BO
10
90
GA
HM
DC
VE1
90
0G
A
HM
DJ1
90
0G
A
4
HMBCL1110## HMBCR1110##
x2 x2
RID
GE
CA
P
RID
GE
BEA
M
DO
OR S
HRO
UD
BA
RG
E SU
PPO
RT
SLID
ING
RA
IL
RU
NN
ER R
AIL
BO
TTO
M C
HA
NN
EL
2100 W
ALL
CH
AN
NEL
LEFT HAND BARGE CAP RIGHT HAND BARGE CAP
HM
RC
1135G
A
HM
RB2150G
A
HM
DSB
O1010G
A
HM
BS2
047G
A
HM
SR2100G
A
HM
BR2100G
A
HM
RRBO
2047G
A
HM
WC
2100G
A
x2 x1 x1 x1 x1 x1 x1 x6
HM
DT
HANDLEMOUNT
DOORLATCH
DOORSTOP
10x16WAFER
DOORWHEEL
DOORNUT
HM
DM
##
HM
DLG
A
HM
SS
WTK
1016
HM
DW
HM
NN
6
x2
x2
x2
x1 x1
CORNERBRACKET
DOORTONGUE
ALUMINIUM RIVET
10x22WAFER
DOORHANDLE
10x16SCREW
10x16WASHER
SCREWRIVET
HM
CBG
AH
MT
H
RIV
4-3
RIV
4-3
##
WTK
1022
TEK
NN
W1
01
6TEK
1016
M8x47MASONRYANCHORM
AA
84
7
HOLD DOWN
LUGHM
HL
TEK
1025##
x8
x1
x1
N1/N2N3
x4x8
N1/N2N3
x8x12
10x25WASHER
SCREW
5
2.21
2.00
2.15 2.25
SITE AND ASSEMBLY PREPARATION
Important Notes
• It is essential to clear and level the site prior to assembling your Stratco Handi-MateTM Shed.• Before starting to build the shed, please refer to the previous pages of this guide for a list of
recommended shed assembly tools and shed components.• Also note there are different types and colour screws. Ensure that the right type and colour screw is
being used at each location.
• Stability and performance of the shed relies on the door being closed during high wind events.
• Do not traverse the roof of the Handi-Mate MateTM. If this is unavoidable, ensure crawl boards orladders are used over the roof surface to distribute load.
Preventing Wind Uplift
All Stratco Handi-MateTM Sheds must be securely bolted to a permanent concrete base with sufficient masonry anchors to prevent wind uplift. It is particularly important that masonry anchors are placed within all four corner brackets of the Handi-MateTM Shed. Further anchors and mounting brackets are also used to fix the Handi-MateTM Shed to the permanent concrete base according to shed size. The mounting brackets are to be evenly spaced along the length of the wall.
Concrete Floor
Option 1 - Before building the shed, pour a base that is larger than the area by at least 200mm in each direction. The base should be poured so the concrete that will be outside the shed floor area slopes away from the shed to help prevent water from entering the shed.
Option 2 - Substantial concrete pads may be used at each anchor location as an alternative to a complete concrete floor. It is recommended pads are minimum Ø250mm x 400mm deep, embedded into a firm natural soil base.
6
DOOR WHEEL
DOOR NUT
DOOR NUT
DOOR WHEEL
TOP DOOR CHANNEL
DOOR ASSEMBLY
2
1
3
VERTICAL DOOR CHANNEL
HANDLE MOUNT
HANDLE MOUNT
10x16 WAFER SCREW
SPLIT DOOR SHEET WALL SHEET
BOTTOM DOOR CHANNEL
!
!
!
7
4
5
VERTICAL DOOR CHANNEL
MAKE SURE PRE-PUNCHED HOLES LINE UP IN ALL 4 CORNERS
!
!
!
!
10x16 WAFER SCREW
10x16 WAFER SCREW
10x16 WAFER SCREW
10x16 WAFER SCREW
55mm
45mm30mm
1. FIX OUTSIDE CORNERS.2. CHECK SQUARE.3. FIX INSIDE CORNERS & HANDLE MOUNT.4. FLIP & FIX ON FRONT SIDE.
DRILL Ø12mm HOLE
RIVET
6
8
1
CORNER WALL SHEET SPLIT WALL SHEET
!
FRONT WALL ASSEMBLY
9
!
SLIDING RAIL
BOTTOM CHANNEL
DOORJAMB
1
10x16 SCREWx2
POSITION THE WALL SHEETS SO THE SCREWS ARE DRIVEN INTO THE CENTRE OF THE PEAK.
1
1
2
150mm
!10x16 SCREW
DOOR JAMB
DOOR JAMB
POSITION THE WALL SHEETSSO THE SCREWS ARE DRIVENINTO THE CENTRE OFTHE PEAK.
RIVET
3
2
10
CORNER WALL SHEET
WALL SHEETWALL SHEET
2100 WALL CHANNEL
2100 WALL CHANNEL
!
1
2
BACK WALL ASSEMBLY
11
3
4
10x16 SCREW
x41
2
1
1
2
2
POSITION THE WALL SHEETSSO THE SCREWS ARE DRIVENINTO THE CENTRE OF THE PEAK.
!
!
10x16 SCREW
10x16 SCREW
POSITION THE WALL SHEETSSO THE SCREWS ARE DRIVENINTO THE CENTRE OF THE PEAKFOR ALL SCREWS.
RIVET
12
2100 WALL CHANNEL
2100 WALL CHANNEL
!
CORNER WALL SHEET
WALL SHEETWALL SHEET
2
1
SIDE WALL ASSEMBLY
13
10x16 SCREW
x41
2
1
1
2
2
POSITION THE WALL SHEETSSO THE SCREWS ARE DRIVENINTO THE CENTRE OF THE PEAK.
!
!
10x16 SCREW
10x16 SCREW
POSITION THE WALL SHEETSSO THE SCREWS ARE DRIVENINTO THE CENTRE OF THE PEAKFOR ALL SCREWS.
RIVET
3
4
14
!
15
REPEAT PROCESS FOR THIRD WALL
CORNERBRACKET
10x16 SCREW
1
2
!
MAKE SURE PRE-PUNCHEDHOLES IN CORNER BRACKET
AND WALL PANELS ARE ALIGNED.
1
2
SHED ASSEMBLY
16
3
17
RIVET
10x16 SCREW
10x16 SCREW
1
2
2
4
4
4
3
3
DOOR SHROUD
USE DOOR SHROUD AS SPACER TEMPLATEBETWEEN BOTH DOOR JAMBS. DO NOT FIX.
!
4
18
1
20°
10mmMAX.
10x16 SCREW
10x16 SCREW
RUNNER RAIL
BARGE SUPPORT
BOTTOM CHANNEL
SLIDING RAIL
!
!
!
!
600mm10x16 SCREW
600mm10x16 SCREW
5
19
RIDGE BEAM
1005mm
1
10x16 SCREW
7
6
!
MASONRY ANCHORFIX TO CONCRETE
ONCE SQUARE
CHECK DIAGONALS
FOR SQUARE
20
ALIGNED
TURN UP VALLEYS ON SHEET TO ENCOURAGE WATER TO FLOW
TOWARDS WALLS
1
FIXING LOCATIONS FOR ALL ROOF SHEETS
ALL FIXINGS 10x16WASHER SCREWS
1.1
2.1
1.2
2.2
1.3
2.3
2
8
21
ALUMINIUM RIVET3
3
12
FIXING LOCATIONS FOR ALL ROOF SHEETS
FIXING ORDER1.1
2.1
1.2
2.2
1.3
2.3
1.4
2.4ALL SCREWS 10x16 WASHER SCREWS
9
22
10x16 WASHER SCREW
RIDGE CAP
205mm IN FROM BACK EDGE OF RIDGE CAPTHEN CONTINUE WITH 300mm SPACINGS
1
2
5mmRIDGE CAP
RIDGE BEAM
RIDGE CAP
10
23
DOOR STOP &10x22 WAFER
630mm
REMOVE ANY SWARF FROM SLIDING RAILBEFORE SLIDING DOOR ONTO SHED
11
24
10x22WAFER
TIGHTENSCREW
12
25
DOOR SHROUD
10x16 SCREWX2
10x16 SCREW
13
26
MAX 20mm
LEFT BARGE CAP
10x25WASHERSCREW
10x25WASHERSCREW
14
27
210mmMIN
RIGHT BARGE CAP
LEFT BARGE CAP
RIGHT BARGE CAP
15
BROCSSDHM5
SECURE THE SHED
HANDY HINT
MAINTENANCE
The installer is responsible for ensuring the slab or concrete squares are sufficient to support the shed and sustain wind loading. Do not directly anchor your shed to pavers.
Your Stratco Handi-MateTM Shed will maintain its good looks for even longer with a simple wash and wipe down. Cleaning should be performed as often as is required to remove any dirt, salt and pollutants.
Stratco Handi-MateTM Sheds are produced from the highest quality materials and will provide many years of service. Refer to the ‘Selection Use and Maintenance’ brochure for more information on how to get the best out of your product.
www.stratco.com.au
CONTACT
1300 165 165
© Copyright April 2016 14/04/16
All brands and logos/images accompanied by ® or ™ are
trade marks of Stratco (Australia) Pty Limited.
MAX. DIST.MAX. DIS.
MAX. DISTANCEMAX. DISTANCEMAX. DIST.
MA
X. D
IST.
MA
X. D
ISTA
NC
EMA
X. D
ISTA
NC
EM
AX. D
IST.
FIX TO CONCRETEWITH MASONRY
ANCHORS
1
TEK10162
(NOT ACTUAL SHED)
!MAXIMUM DISTANCE BETWEEN
HOLD DOWN LUGS (CENTRE TO CENTRE)IS DETERMINED BY WIND CLASSIFICATION
WIND CLASSIFICATIONN1, N2 = 1400mm MAXIMUM (CENTRE TO CENTRE) N3 = 900mm MAXIMUM (CENTRE TO CENTRE)
SHEETS OFF GROUND DURING WALL ASSEMBLY
HOLD DOWN LUG
ALL HOLD DOWN LUG SCREWS SHALL BE SECURED THROUGH BOTH THE WALL CHANNELS AND WALL SHEETS.
top related