GTP NKRA
- -ear to DateResultsJanuary April 2011
-
8/6/2019 GTP NKRA Results (Jan-Apr2011)
2/14
10% drop inIndex Crime
46% drop inStreet Crime
Crime
(Results : January April 2011)
Jan-Apr2010
Jan-Apr2011
,59 661,53 714
-10.0%
-5,947
Jan-Apr2009
Jan-Apr2011
,13 391
,7 286
-45.6%
-6,105
-
8/6/2019 GTP NKRA Results (Jan-Apr2011)
3/14
3
NS SurveyTNS Fear of Crime Index
Sep 2010 Jan 2011
. %52 8
. %52 0
-0.8%
:Source TNS Survey
011 Year End:arget %educe to 50
TNS Public Satisfaction
with PDRM Index
Sep 2010 Jan 2011
. %55 8
. %56 6
+0.8%
:Source TNS Survey
011 Year End:arget %ncrease to 60
Crime
-
8/6/2019 GTP NKRA Results (Jan-Apr2011)
4/14
TRACKER
Unit of measure
1 Footnote
SOURCE: Source 4
*BET5 was only launched in October 2010
Average Daily Ridership BET 1- 4 Q1 2010 vs Q1 2011
BET 1-4 ridershipimproved by
73.8%
(Kota Damansara Pasar Seni)
(Rawang Pasar Seni)
(Tmn. Sri Muda Pasar Seni)
(Subang MewahPasar Seni)
(Sg. LongPasar Seni)
Period Ridership
Q1 2010 2,668
Q1 2011 4,638
Increment + 1,970ridership
Source: Ministry of Transport, Prasarana 2011
. .P T
-
8/6/2019 GTP NKRA Results (Jan-Apr2011)
5/14
TRACKER
Unit of measure
1 Footnote
SOURCE: Source 5
Rail ridershipimprovement
16.6%
26 new 4 car train set operationalised since January 2010
Period Ridership
Q1 2010 296,058
Q1 2011 345,160
Increment + 49,102 ridership
Source: Ministry of Transport, Prasarana 2011
. .P T
KTMBEMU
On track to deliver first 6 sets six-car-train by end 2011
-
8/6/2019 GTP NKRA Results (Jan-Apr2011)
6/14
6
TRACKER
Unit of measure
1 Footnote
SOURCE: Source 6
Well-received by rakyat
Reduce 500 buses from Puduraya
ITT BTS
Opened on 16th April
World-Class Infrastructure
Puduraya (Renovated)
. .P T
-
8/6/2019 GTP NKRA Results (Jan-Apr2011)
7/14
Education
011 Target( , -755 new pre)chools
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2,000
2,200
2,400
2,600
2,800
/07 2/7 2011
07/2
/72011
/07 27/2011
/ /07 27 2011
/07
/272011
/07 27/2011
/ /07 27 2011
/07 27
/2011 /07/27201
1/ /07 272011
/07
/272011
/07 27
/2011
/07 27/2011
/07
/272011
07/2
/72011
Achieved YTD 2011
Target
:n 2010 , + + -01 144 of 4 and 5 children were enrolled in prechools nationwide , -4 569 children benefited from the new pre schools in2010
1,945 new pre-schools(71% of target achieved)
-
8/6/2019 GTP NKRA Results (Jan-Apr2011)
8/14
9,814 schools(primary & secondary)
have been assessed & ranked
Education
Composite score
Numberofschools
8555453540
Band 7
Bands
Bands7 6 5 4 3 2 1Bands
70% schools in Band 6 and 7(145 out of 209 primary schools)
achieved 40% improvementin UPSR Results
-
8/6/2019 GTP NKRA Results (Jan-Apr2011)
9/149
TRACKER
Unit of measure
1 Footnote
SOURCE: Source 9
1 Footnote
:SOURCE Source
TRACKER
Unit of measure
1 Footnote
SOURCE: Source 9
1 Footnote
:SOURCE Source
SIP has impacted student outcomes in public exams for2010
)1
:PSR % &70 of Band 6 7 schools showed upto
%40 improvement in UPSR results %Over 10 of student who sat for the
UPSR last year scored straight A s:MR The Education Minister said it was the
best PMR results in four years.
SUMMA
RY
TRACKER4
-
8/6/2019 GTP NKRA Results (Jan-Apr2011)
10/14
TRACKER
Unit of measure
1 Footnote
:SOURCE Source 10
4
LIH : OVERALL ACHIEVEMENT FOR 1AZAMPROGRAMME
A total of 13,746 KIR are participatingin 1AZAM programme. Some had started working (AZAM Kerja),receiving equipments and loans (AZAM Tani, Niaga and Khidmat) from their respective champions inimplementing1AZAM initiatives.
AZAM Performance as at 12 May 2011
Number of participants (Cumulative)
Source : Implementing agencies. Some of the initiative already started in 2010
TARGET : TO ENSURE 57,793 POOR HOUSEHOLDS REGISTERED IN eKASIH PARTICIPATE IN 1AZAM
. .I H
-
8/6/2019 GTP NKRA Results (Jan-Apr2011)
11/14
. .B I011 Target % fnnual Target
905.1km ofrural roadsto be completed
58,08
7additional rural houses
with clean / water supply
9,146additional houses for
rural poorbuild &restored
32,242additional rural houses
withelectricity supply
334.2km ofrural roadsto be completed
3,866additional rural houseswith clean / water supply
509additional houses for
rural poorbuild &restored
1,238additional rural houses
withelectricity supply
36.9%
3.8%
5.6%
6.6%
RBI : progressing well...
Remarks
On Trackto Full Year
Delivery
Currentlyexceeds
monthly target,with 29,011under
Implementation
Currentlyexceeds
monthly target,
with 22,043under
Implementation
On Trackto Full Year
Delivery
- - :ear to date 1 Jan to 30 April 2011
TD Resultsor 2011 *
-
8/6/2019 GTP NKRA Results (Jan-Apr2011)
12/14
,A single easily recalled hotline number specifically for all( ).corruption complaints was identified the MACC hotline
A
A nationwide campaign was launched to roll out hotline and mascotc r o s s a l l 5 k e y a g e n c i e s to create touchpoints with rakyatwith stickers and badges
B
Agent Lang
Car sticker
YTD whistleblower cases:
437 (Jan Mar 2011)
scot was launched along with the publicizing of torruption
-
8/6/2019 GTP NKRA Results (Jan-Apr2011)
13/14
orporate Integrity Pledge launched andaining momentum
Roundtable Sessions were held betweenthese parties which decided on theCorporate Integrity Pledge
+CIP then endorsed launched
Corruption
:ignatories to date include
nd more
-
8/6/2019 GTP NKRA Results (Jan-Apr2011)
14/14
( )Cabinet Away Day Jan 2011
Strategic ReformInitiatives KPIs
-PM Minister Mid Year Review( )2011 Mid Year Performance
( KRA Activities January 11 )ay 11
Ministers Scorecard 2011
PM Ministers Year End( )Review 2010 Performance
Progress Remarks
inisters comments on the 2011PIs have been submitted to eachi ni str ie s t o be in co rp or ate dnto the Scorecardew KPIs from the 6 SRI Labs areeing incorporated in the .inisters Scorecard Expected toomplete by Mid June 2011
KRA team is in the process ofecuring PM s time in July forhe Mid Year Performance Review
corecard for 29 Ministers wereompleted mid Jan 2011
-M M in ist er r evi ew c omp let ed, arly Feb 2011 and PM serformance appraisal letter has.een sent to all Ministers
%00
%00
%00
%0
uly 2011
MKRA Updates
On track Minor delay Major delay Not started