ground marker regional briefing to awp acp wgf10/wp14
Post on 27-Mar-2015
218 Views
Preview:
TRANSCRIPT
Ground MarkerRegional Briefing
to AWP
ACP WGF10/WP14
2
Definition of Program
• What is Ground Marker? System utilizing existing avionics to broadcast a digital voice
message to the cockpit. For the prototype system, the message will indicate to the pilot their exact position on the airport surface.
• Extends ILS marker system to surface (i.e. ground marker)
• Prototype System components :– Transmitter
– Antenna
– Inductive loop sensors
– Laptop computer
– Marker Receiver (standard equipment on all ILS equipped aircraft)
3
75MHz RF CELL
TAXIWAY EMBEDDED ANTENNA
AIRCRAFT DETECTION SYSTEM
(Inductive Loop)
CONTROL AND TRANSMITTER UNIT
WITH VOICE FILE LIBRARY1
Airplane/vehicle is detected by inductive loop which triggers GM transmitter 2
Transmitter sends voice message through antenna to 75MHz marker beacon2 receiver in airplane or vehicle
1Maintainer inputs message into GM transmitter memory. 2The 75MHz marker beacon is modulated by a signal from the GM transmitter. No new equipage is necessary.
3Message is received via headset or cockpit speaker within the airplane and via speaker within a vehicle
1
Concept of Operations
4
Organizational Mission & Goals
To provide research, development, and acquisition for products and services that enable the FAA to enhance the safety of the NAS and satisfy current and future operational needs of the U.S. civil aerospace system for national and international operations.
FAA provides a safe, secure, and efficient global aerospace system that contributes to national security and the promotion of U.S. aerospace safety. As the leading authority in the international aerospace community, FAA is responsive to the dynamic nature of customer needs, economic conditions, and environmental concerns.
FAA
MISSION
ARA
GOALS
AND 500
AND 520
Evaluate and demonstrate emerging technologies via the Safe Flight 21 and Surface Technology Product Teams
Reduce the fatal aviation accident rate by 80% in ten years
…. Within the scope of the Runway Incursion Reduction Program (RIRP), AND-520 evaluates a range of technologies aimed at providing increased pilot and controller awareness of surface traffic….
Install the Ground Marker system, a low cost technology, at an operational airport by 9/03 and evaluate it by 2004.
Reduce the fatal accident rate by developing and deploying those capabilities and systems needed to address pilot decision-making.
Incubate and exploit technologies and expedite the deployment of operationally validated NAS Capabilities for the aviation community
5
Why Ground Marker?
• Inspector General’s Reports June 2001 April 2003
• Determine Ground Marker’s effectiveness in increasing pilot situational awareness in an effort to curb:
PD/VPD Runway incursion rate PD/VPD Surface incident rate Confusion regarding position on surface
• Early Human Factors studies indicate that over 90% of pilots believe that a voice message indicating position on surface aides in increasing situational awareness (2001-2002 Honeywell study of 60 pilots)
• System will also be useful to pilots during hours that airport is closed
6
Ground Marker - Accomplishments
“Demonstration of New and Emerging Technologies Aimed at Increasing Safety on Airport Movement Areas”
BAA Proof of Concept @ WJHTC/ACY
9/00
NATCA Letter
11/01
WJHTC
10/02
8/01
Bournemouth Int’l Airport, UK
Ground Marker should be aggressively pursued
Concept demonstration
9/01
Alternative antenna designs and voice quality improvements evaluated.
Further development needed to - 1) test for radiated frequency (RF) interference, 2) optimize human factors issues, and 3) integrate inductive loops into system to trigger messages.
5/98
MNS #323
11/98
IRD
For Airport Surface Movement Enhancement & Runway Incursion Prevention
Airport Surface Movement Enhancement & Runway Incursion Prevention
Ground Marker RFP
12/02
Program plan completed
1/03
Findings – System can transmit clear voice messages to cockpit via 75 MHz Marker-Beacon
Program Plan
Key Site Selected
3/03
Contra Costa County, CA (CCR)
4/03
Test NCP
Test NCP submitted
Draft Key Site
MOU
Ground Marker RFP accomplished, contractor proposal received, negotiated and approved in December 2002.
3/03
Prototype Design
Final Prototype System Design completed
Draft MOU submitted to key site for comments
4/03
Contract Awarded
2/03
System Integration contract awarded
7
Approval of WJHTC Quick Look is scheduled for July 2003
Ground Marker - Near Term Schedule
Scheduled to submit NTIA requests for CCR and LGB
NTIA Request
WJHTC Quick Look
5/03
NATCA Article 7
Brief
7/03 6/046/03
NCP Approval
NATCA Article 7 Brief scheduled for July 2003
NCP approval by CCB
7/03
The Operational Evaluation is scheduled to begin in early October 2003 and will be completed by June 2004
5/03
Key Site Survey
5/03
WJHTC Testing
WJHTC testing scheduled for May 12-30
Key Site Survey scheduled at CCR for May 5-9, 2003
Operational Evaluation
8/03
Key Site System Installation is scheduled to begin in August 2003 and will be completed by September 2003.
Key Site System
Installation
9/03
10/03
6/03
Key Site MOU Approval
MOU approval by CCR
8
Pilot Education
• Local and transient population
• Three weeks on-site at CCR educating users
• Leave-behinds at airport user groups
• Website
• Local and regional newsletters
• NOTAMs, ATIS, AFD (Airport Facility Directory)
• AOPA, Flight Standards coordination
• Questionnaire
• Incentives
9
Why Concord?
Concord among Top10 sites that most closely matched the following Ground Marker Site Selection criteria
Total Runway incursions from 1997 to November 2002Percentage of A and B incursionsPercentage of incursions that were NOT Operational ErrorsRecommendations from RIAA studyPercentage of Commercial trafficNumber of instrument operationsFocus on Non-ASDE/AMASS sites
Approximately 60% of GA Aircraft equipped with a Marker receiver
Concord currently #1 in Runway Incursion Rate
10
CCR Runway Incursions/Surface Incidents
1999 2000 2001 2002 Total
Runway Incursions (RIs) 3 7 7 7 24
Surface Incidents (SIs) 3 5 6 1 15
Total Annual RIs & SIs 6 12 13 8 39
Pilot Deviations (PD) Percentage of RIs/SIs
583.3%
1083.3%
969.2%
787.5%
3179.5%
Vehicle/Pedestrian (V/PD) Percentage of RIs/SIs
116.7%
216.7%
430.8%
112.5%
820.5%
Note: There were no operational errors associated with Runway Incursions in this timeframe.
11
Proposed Ground Marker Locations
12
Ground Marker Program Objectives
• Program Goal To EVALUATE the system, NOT to roll out nationally
• Objectives Design and build GM prototype to support field evaluation Perform tests to verify technical performance at WJHTC Install and evaluate prototype at operational site (CCR) Determine operational suitability for acquisition
top related