green productivity – integrated community development approach for poverty alleviation by nguyen...

Post on 03-Jan-2016

215 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Green Productivity – Integrated Community Development Approach for Poverty Alleviation

By Nguyen Thi Bich HangManaging Director

Vietnam Productivity Centre

Green Green Productivity -Productivity -

Integrated Integrated Community Community

Development Development Approach Approach for Poverty for Poverty AlleviationAlleviation

The Experience of The Experience of VietnamVietnam

The 2nd WCGP

GP programs milestoneGP programs milestone

2002 onward2002 onward

Nov: Workshop on GP-ISO 14000 for Cement Industry

19981998

Apr: GP Workshop- GP first introduced in Vietnam

July: Start SPE-GPDP-98-2058 Project

19991999

Jan:GP workshop

Apr: Workshop on Biogas chamber constructionAug: SPE-GPDP-98-2058 project finished

Aug: Training course on GP and ISO14000 for Electroplating and Textile Industry

20002000

Apr:Started ICD-DMP-00 and SPE-GPDA-00 project

Apr:International workshop on GP promotion based on ITSep: Workshop on 5 year Strategy for GP in VietnamSep: Workshop on Natural Farming

20012001

Mar-Apr: Practicum workshop for Trainers on GP

Aug: GP Closing and Starting GP-ICD expansion for

60 communities

Training for GP specialists are done for 21 provinces

GP practices own by increasingly larger group of atakeholdersThe first National GP Team Convention

GP milestones in VietnamGP milestones in Vietnam

First introduced in Vietnam First introduced in Vietnam

April 1998, GPPMApril 1998, GPPM

Enhance ProductivityEnhance Productivity

Protect EnvironmentProtect Environment

SustainableSustainable

DevelopmentDevelopment

apO Pilot project on

GP- ICD

1999-2002

CÇn Th¬

TP HCM

Phó YªnGia Lai

BÕn Tre

VÜnh Long Bµ RÞa-Vòng Tµu

TP §µ N¼ng

Qu¶ng Nam

Thõa Thiªn- HuÕ

TP Hµ néi

Qu¶ng NinhTh¸i Nguyªn

Hµ TÜnh

NghÖ An

Ninh B×nh

H¶i D ¬ngB¾c Giang

Phó Thä

Hoµ B×nh

Projects in 1999/00

Projects in 2000/01

Projects in 2001/02

72 Villages in 21 out of 61 Provinces

Kontum

200200 Training Training

coursescourses 7000 7000 ParticipantsParticipants

Achievements of GP Achievements of GP in Vietnam in Vietnam

Awareness buildingAwareness building

Involvement of different group Involvement of different group in GPin GP

GP contestGP contest

Drilling WaterDrilling Water

Water Filtration SystemWater Filtration System

Biogas UtilizationBiogas Utilization

Over Over 200200 Biogas Plants Have Been Constructed Biogas Plants Have Been Constructed

Over Over 370370

Energy Energy Efficient Efficient Stoves Stoves Have Been Have Been ConstructedConstructed

Drainage System ConstructionDrainage System Construction

Solid Waste Collection

Solid Waste Collection

Solid Waste Collection

Solid Waste Collection

Solution for safe fruits and vegetables

Close cooperation between the groups implementing the projectOrganic integration with other programsCommitment of the local authoritiesSound reinforcement of options/measures addopted by incorporating into local regulationLocal experts development and working together with foreign experts

Key factors for GP implementationKey factors for GP implementation

The manila declaration On Green Productivity The manila declaration On Green Productivity (GP)(GP)

All stakeholders should promote awareness and mutual cooperation in Green

Productivity by actively participating in networking of

complementaray activities, exchanging of ideas and

experiences, disseminating information, and encouraging the

involvement of everyone in the Green Productivity Movement as

the strategy for better quality of life for all.

First World Conference on Green Productivity 6

December 1966

Who is owner of GP

top related