GREAT WESTERN

1

ELECTRIFICATION

Wales

Alastair Byers – Consents Manager, Wales on behalf ofEssel Hagan – Highways & Utilities Co-ordinator

Bridge Works in Wales

Wales 2

Bridge Works in Wales

Updates: May 2014 to January 2016

Farm Road, Caldicot Station [SWM2-15-55]

Reconstruction E: 347498 N: 187597

• Proposed Start:

May 2014

• Proposed Finish:

August 2014

Wales 33

August 2014

• C3 Budget Estimates

received from BT.

C3 requested from

WPD and Wessex

Water.

Church Road [SWM2-150-15]

Reconstruction & Track Lower E: 344031 N: 187158

• Proposed start:

October 2014

Wales 44

• Proposed End:

January 2015

• C3 requested from

Welsh Water.

Maesglas Road [SWM2-160-15]

Reconstruction E: 330313 N: 185880

• Proposed start:

November 2014

• Proposed End:

Wales 55

• Proposed End:

March 2015

• C3s requested from

Wales & West, WPD

and Welsh Water.

Parsons FB [SWM2-150-28]

Reconstruction E: 343770 N: 187043

• Proposed start:

December 2014

• Proposed End:

Wales 66

• Proposed End:

March 2015

• C3 requested from

Welsh Water.

The Ramp [SWM2-150-42]

Reconstruction E: 343507 N: 186930

• Proposed start:

December 2014

• Proposed End:

Wales 77

• Proposed End:

March 2015

• C3 received from

Wales & West and

BT. Awaiting

responses from WPD

and Welsh Water.

Llandavenny Road [SWM2-152-01]

Reconstruction E: 341142 N: 187002

• Proposed start:

December 2014

• Proposed End:

Wales 88

• Proposed End:

March 2015

• C3s received from

BT. Awaiting

responses from WPD

and Welsh Water.

Somerton Road [SWM2-156-70]

Reconstruction E: 333359 N: 187740

• Proposed start:

December 2014

• Proposed End:

Wales 99

• Proposed End:

March 2015

• C3 received from BT.

Awaiting responses

from Wales & West,

WPD and Welsh

Water.

Whitewall FB [SWM2-151-00]

Reconstruction E: 342774 N: 186863

• Proposed start:

December 2014

• Proposed End:

Wales 1010

• Proposed End:

March 2015

• C3s requested from

WPD and Welsh

Water.

Mardy Road [SWM2-167-10]

Reconstruction E: 322291 N: 178820

• Proposed start:

January 2015

• Proposed End:

Wales 1111

• Proposed End:

March 2015

• C3s: Requested from

WPD, and Welsh

Water. Received

from Vodafone and

BT.

Rogiet Road [SWM2-148-68]

Reconstruction E: 346125 N: 187534

• Proposed start:

January 2015

• Proposed End:

Wales 1212

• Proposed End:

April 2015

• No services

Undy Halt FB [SWM2-150-52]

Reconstruction E: 343346 N: 186888

• Proposed start:

January 2015

• Proposed End:

Wales 1313

• Proposed End:

April 2015

• C3 requested from

WPD and Welsh

Water.

Chepstow Road [SWM2-157-71]

Reconstruction E: 331903 N: 188428

• Proposed start:

January 2015

• Proposed End:

Wales 1414

• Proposed End:

April 2015

• C3s: Requested from

Wales & West, WPD,

Welsh Water.

Received from BT.

Bridge Street [SWM2-158-62]

Reconstruction E: 330695 N: 188079

• Proposed start:

January 2015

• Proposed End:

Wales 1515

• Proposed End:

April 2015

• C3 received from BT

and Wales & West.

Awaiting responses

from, WPD and

Welsh Water.

Tunnel Terrace [SWM2-158-64]

Reconstruction E: 330695 N: 188079

• Proposed start:

February 2015

• Proposed End:

April 2015

Wales 1616

April 2015

• C3 received from BT.

Awaiting responses

from WPD and Welsh

Water. Wales & West

confirms LPs can be

protected.

Cuckoo Bridge [SWM2-160-77]

Reconstruction E: 330200 N: 184652

• Proposed start:

February 2015

• Proposed End:

Wales 1717

• Proposed End:

May 2015

• C3 received from BT.

Beresford/Moorland Road [SWM2-168-53]

Reconstruction E: 320367 N: 177317

• Proposed start:

February 2015

• Proposed End:

Wales 1818

• Proposed End:

May 2015

• C3s requested from

WPD, Welsh Water,

and Wales & West.

Received from BT.

Newport Station FB [SWM2-158-43]

Reconstruction E: 330901 N: 188348

• Proposed start:

April 2015

• Proposed End:

Wales 1919

• Proposed End:

June 2015

• C3 requested from

Welsh Water.

Maerdy Farm [SWM2-162-28]

Reconstruction E: 328625 N: 183157

• Proposed start:

April 2015

• Proposed End:

Wales 2020

• Proposed End:

July 2015

• No service on this

Bridge.

Adamsdown Place [SWM2-169-37]

Reconstruction E: 322291 N: 178820

• Proposed start:

July 2015

• Proposed End:

Wales 2121

• Proposed End:

October 2015

• C3s requested from

WPD and Welsh

Water.

Wentloog Road [SWM2-166-57]

Demolition E: 322890 N: 179107

• Proposed start:

October 2015

• Proposed End:

Wales 2222

• Proposed End:

December 2015

• C3s requested from

WPD, Welsh Water

and received from

BT.

Hawse Lane [SWM2-162-68]

Reconstruction E: 327965 N: 182684

• Proposed start:

October 2015

• Proposed End:

Wales 2323

• Proposed End:

January 2016

• No service on this

Bridge.

Green Lane / Heol Las [SWM2-164-57]

Reconstruction E: 325533 N: 180927

• Proposed start:

October 2015

• Proposed End:

Wales 2424

• Proposed End:

January 2016

• No service on this

Bridge.

Trowbridge Road [SWM2-166-27]

Reconstruction E: 323408 N: 179391

• Proposed start:

October 2015

• Proposed End:

Wales 2525

• Proposed End:

January 2016

• C3 requested from

WPD.

Summerway [SWM2-163-48]

Jacking E: 326982 N: 181976

• Proposed start:

November 2015

• Proposed End:

Wales 2626

• Proposed End:

February 2016

• No service on this

Bridge.

Pellett Street [SWM2-169-72]

Reconstruction E: 318887 N: 176068

• Proposed start:

November 2015

• Proposed End:

Wales 2727

• Proposed End:

February 2015

• C3s requested from

WPD and Welsh Water.

Wales & West service

to be protected.

Cardiff Road [SWM2-159-52]

Reconstruction E: 330233 N: 186754

• Proposed start:

December 2015

• Proposed End:

Wales 2828

• Proposed End:

March 2016

• C3 received from BT

and Wales & West.

Awaiting responses

from WPD and Welsh

Water.

Splott Road [SWM2-169-07]

Reconstruction E: 319961 N: 176786

• Proposed start:

January 2016

• Proposed End:

Wales 2929

• Proposed End:

April 2016

• C3s requested from

WPD, Welsh Water.

Received from BT

and Wales & West.

Parapet Works – provisional dates

BEFORE AFTER

Wales 30

BEFORE AFTER

• Parapet compliance works.

• Contractors to be appointed early 2014 (to be confirmed).

• Following the appointment of the Contractors we would expect a provisional programme of works and traffic

management proposals to have been developed, where we would discuss the programme and the traffic

management requirements for each of the structures with the various Local Authorities.

• Starting works in mid 2014 and completing all GWML structures within a 12-18 month period.

• Parapet compliance works will take place on 13 Welsh structures.

Occupation Bridge No.10363

Occupation Bridge No.10419

Accomodation Bridge No.10453

King Grove Lane Farm Bridge No.10477

Parapet works

Severn Tunnel Junction Footbridge No. 14861

Eastern Access Road No. 15162

Spytty Road Bridge No. 15603

Docks Access Road A4042 No. 16018

Wales 31

King Grove Lane Farm Bridge No.10477

Dodington Road-Lilliput-No.10520

Overbridge Bridge No.10632

Halfpenny FB No.10826

Dragon Road Bridge No.11015

Docks Access Road A4042 No. 16018

Penstaff Brachdy Lane No. 16742H

Marshfield Road No. 16370

Foxes Court No. 16167

CONTACT DETAILS

Alastair Byers Consents Manager, Wales

E: alastair.byers@networkrail.co.uk M: 07790 395381

Essel Hagan

Wales 32

Essel Hagan Highways & Utilities Coordinator

E: essel.hagan@networkrail.co.uk M: 07932 047870

Margaret BurgessWestern Highways Interface Advisor

E:margaret.burgess@networkrail.co.uk