GOVERNJVIENT OF ANDHRA PRADESH DEPARTMENT OF MINES & GEOLOG Y ~ .
I· rom 'To I' . Raja Babu, M .~c (Tech), Smt M. Gayathri,
W/o M. Prasad, [1eputy Director of Mines & Geology, l•.URNOOL. 11.No: 4/ 134, Krishnamreddypalli,
Chjyyedu (V), Anantapuramu (M), Anancapuramu District.
.. . ~ Ir, Letter No. 2904/MP-A TP/2017, dt: q.1'-08-2017
S ub:· l\1ines & Quarries - Approval o f Mining Plan (including Progressive M ine Ck,sure Plan) for a period of 5 years for Road M etal and Building. Stone over an extent of 1.000 Hectare in Sy.No: 231 of Cbiyyedu Village, Anantapuramu Manda!, Kurnool District in favour of S1nt M. Gayathri, prepared by Sri G. Eswar Reddy, M.Sc., B.L ., R.Q.P. - M ining Plan· Approved - Regard(ng.
Ref:- 1) 2)
3)
4)
5)
G.O.Ms.No: 56, Jnd. & Comm. (M.11) Dept., dated: 30.04.2016. Prodgs.No : 28594/P.RQP/2001 , dt: 13.05.2016 of the Director of Mines and Geology, Hyderabad. Letter dated: 0 1.08.2017 alongwi th draft Mining Plan from the applicant received in this office on Ol.08.2017. Lr. No.2904/MP-ATP/2017, dt: 09.08.2017 to the R.Q.P. / Applicant of the Deputy Directo r of Mines & Geology, Kumool. Letter dated: 16.08.2017, alongwith five sets of fai r copies of mining plan from the app licant received in this office on 17.08.20 I 7.
Jn exercise o f the powers 'conforred as per runended·Rule 7 A (I), Cll), (III) and (IV) of
Al'MMC Rules, 1966 read with Proceedings No: 28594/P.RQP/2001, cit: 13.05.2016 of the
Director of Mines and Geology, GoAP, Hyderabad and G.0 .Ms.No: 56, Ind. & Comm. (M.11) Dept., elated: 30.04.2016, I hereby approve the M ining Plan (including Prngrcssive Mine
Clus ul'e P lan) fo1· a period of S years for Road Meta l and Building Stone over an extent of
1.000 Hectare in Sy.No: 231 of Chiyyedu Village , Anantnpur::1mu M:mclal, Kuruool District il1 favour of Smt M. Gayatbri. ·
This approval is subject to the following conditions.
l. This Mining Plan (includ ing Progressive Mine Closure Plru1) is approved wi thout prejudice to any othe r laws applicable to the mine area from time to time whether made by the Central Govenunent, State Government or any other autJ1ority.
'• It is clarified that this approval of the Mining Plan (including Progressive Mine Closure Plan) does not in any way imply the approval of the Government in terms o f any other provisions of the Mines and Minerals (Development and Regulation) Amendment Act, 20 I 5 and any other law~ including the Forest Conservation Act, 1980 ·and APMMC Rules, 1966.
J. The approval authority does not owe responsibility with regard lo recovery factor of Road Metal and Building Stone and assessment of reserves, any erroneous ce11ification made by the R.Q.P. if any, s ince the evaluation.is done on random basis.
4. The Mi11ing Plan (including Progressive M ine Closure Plan) is approved subject to strictfy adhering to the relevant Regulations of MMR, 1961 and obtaining prior permission from the Director General Mines Safely whenever and wherever it is requ ired.
5. The a,Pplicant/ lessee sha0
1l safeguard the structures, publ ic bu ild ings, roads, ra ilway line, electric line and water bodies exists if any as per regulations 109 & 127 ofMMR, 1961.
' Contd ... 2
-2-
<. The appro val of Mining Plru1 (including Progressive Mine Closure Plan) slfall be subjected 10 vacation of prohibitor~ orders <)r notices or determination orders etc., if any issued by <he competent authority.
·· If anything is folmd to be concealed as required by the Mines Act in the contents of the approved Mining Plan and the proposal for rectification has not been made or if at later s1age the information furnished in the document to be incorrect or misrepresentation of facts, the approval shal l be revoked with immediate cffec~.
!.. The approYal authority does not owe responsibility with regru·d to erroneous certification made by the R.Q.P if any and approval is tentative subject ·to modification of ryew findings ::it a later date as per the provisions of Rules inforce, since the evaluation is done on random basis.
E11cl: (2 copies of A.M.P.)
Deputy 01 ec1or o ·
HJ __......,..Ku
Cop) ~11bmi1ted to the Director of!VJines and Geology, A.P1afo;;; with A. .P.
Cop) submitted to the Zonal Jo int Director of Mines and Geology, Kadapa for favour of kind information.
GJp) to Sri G. E:;war Reddy, RQP/Geologist, D.No.13-2-155-1, Shirdi Nagar, Anantapuramu - 515001 for i11formation.
C.>py to the Regio11al Controller of Mines, IBM, Sultan Bazar, Hyderabad.
C•lp) submitted to the Director of Mines Safety, Bellary for favom of kind information.
Copy to the Asst. Director of Mines & Geology, Anantapuramu along with A.M.P.
,
)'
)
)
)
>
)
)
' )
>
)
)
)
}
}
)
)
)
)
)
)
)
)
)
,\
MINI~fG
OVER A"! E
(V), ANANTHA~.~4Mim:191
OTHER THAN FULLY MECHANIZED OPEN CAST QUARRY 'B' CATEGORY
GOVT. REVENUE LAND
(Under Rule 7(A) of A.P.M.M.C.R., 1966)
FOR
Smt. M.Gayathri, W/o Sri M.Prasad,
H.No: 4/ 134, Kr ishnamreddypalli,
Chiyyedu(V) , Ananthapuramu District . Contact No. 9866 791085.
Prepared by
G.ESWAR REDDY M.Sc., BL., RQP /Geologist,
RQP/DMG/AP/07 /2014, RQP/HYD/302/2013/A'
D.No. 13-2-155-1, Shirdi Nagar,
ANANTAPURAMU A.P. 515001. Mobile:09849132789.Phone No:08554 222737.
Email:eswarreddygeologist@gmail.com saigeoservices@ mail.com
AUGUST-2017
/
. J
) for Road Metal & Building
in Sy. No.231 of Chiyyedu Village,
Ananthapuramu Mandal, Ananthapuramu District, Andhra Pradesh State,
prepared in consultation with me and I understand its contents and
agreed to implement the same in accordance of APMMC Rule 28.
Place : ANANTHAPURAMU.
Date :10-08-2017.
CERTIFICATE
Applicant
H·~ Smt. M. Gayathri
This is to certify that Mining Plan in respect of quarry lease area for
Road Metal & Building Stone over an extent of 1.000Hects. in Sy. No. 231
of Chiyyedu Village, Ananthapuramu Mandal, Ananthapuramu District,
Andhra Pradesh State, prepared by Dr G.Eswar Reddy, Consultant
Geologist & RQP from M/s. SAi GEO SERVICES I office at
Ananthapuramu. The applicant agrees to follow the same in accordance to
the provisions of law.
Place: ANANTHAPURAMU.
Date :10-08-2017.
Applicant
M·~ Smt. M. Gayathri
.J
J
I )
)
J
CERTIFICATE
The provisions of Granite Conservation and Development Rules 1999 &
APMMC Rule 28 observed in preparation of Mining Plan for quarry lease
area for Road Metal & Building Stone over an extent of 1.000 Hects. in
Sy. No. 231 of Chiyyedu Village, Ananthapuramu Mandal, Ananthapuramu
District, Andhra Pradesh State.
Wherever specific permissions are required the applicant will approach the
concerned authorities.
Certified that the information provided in the mining plan is correct to the
best of my knowledge.
Date:l0-08-2017.
PLACE: ANANTHAPURAMU.
SIGNATURE OF THE RQP
( G.ESWAR REDDY)
G. ~SWAR REDDY, M.Sc., Bl... Ph.D., Recognised Geologist
IBM!ROP/HYD/302/2013fA RQP/DMG/AP/07/2014
)
INDEX \\ _. \.1..:, . ,· .. ~ ·.,;.1 • ! . - .J
'I .... j
S.NO. \-• • •• • . • ' • J I ··-. '
PAGE No . . I ·:\, ··.:. ··y ff ~' I . -:', ,./GONTENTS -., 1 I
II
Ill
IV
v
VI
VII
VIII
IX
x
XI
PLATE-1 PLATE-2 PLATE-3 PLATE-4 PLATE-5 PLATE-6 PLATE-7
'~~ · .........-·(''.'"-.:..: ".':..:.:,,·, . ..,, . ~/ '··..t . : .. • .• - "' . . . 4 2 t~ftRQbUC'.Tf ON ..
'~~ .. ~:'/.:.. •• : \ t ( " •• -:,.',,,.
........... ' ..... - · .. GENERAL LOCATION AND ACCESSIBILITY
GEOLOGY
EXPLORATION
RESERVES
MINING
DRILLING AND BLASTING
SITE SERVICES
SCHEME OF WASTE MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN
ANY OTHER RELEVENT INFORMATION
LIST OF PLATES
LOCATION CUM KEY PLAN LEASE SKETCH SURFACE GEOLOGICAL PLAN GEOLOGICAL SECTION YEAR WISE WORKING PLAN & SECTION S CONCEPTUAL PLAN & SECTIONS ENVIRONMENT PLAN
LIST OF ANNEXURES
1:50000 1:4000 1:1000 1:1000 1:1000 1:1000 1:5000
ANNEXURE-1 ANNEXURE - II
Photographs of the Area & boundary pillars. Copy of the Procds: No: 214 7 / 04/ 201 5, Dated: 22-07-2015, of DDMG, l<urnool.
3 5
6
7
9
1 1
12
18
19
20
21
25
ANNEXURE - Ill Copy of the Procds: No: 1307/ 03/ RM/ 2015, Dated: 12-08-2015, of ADMG, Anantapuramu.
ANNEXURE - IV Copy of the Registration Certificate of R.O.P
)
)
)
' }
. }
I )
)
}
)
)
)
)
)
)
)
)
)
Smt. M.Gayathri, has filed an application for grant of Quarry Lease for
Road Metal and Building Stone over an extent of 1.000 hectares in Sy. No.
231 of Chiyyedu village, Ananthapuramu Mandal, Ananthapuramu District for
further period of 10 years in the office of ADM&G, Ananthapuramu on 01-04-
2015 in Meeseva and received in office on 02-04-2015.
The Asst. Director of Mines & Geology, Ananthapuramu recommended
the quarry lease application of Smt. M.Gayathri, for the grant of Road Metal
and Building stone over an extent of 1.000 hectares in Sy. No. 231 of
Chiyyedu village, Ananthapuramu Mandal, Ananthapuramu District for the
period of 10 years, subject to satisfaction of A.P.M.M.C. Rules, 1966 and
subsequent Govt. Instructions issued from time to time.
The Deputy Director of Mines & Geology, Kurnool after careful
examination of the proposals of the Asst. Director of Mines & Geology,
Ananthapuramu it is decided in principle to grant of Quarry Lease for Road
Metal & Building stone over an extent of 1.000 hectares in Sy. No. 231 of
Chiyyedu village, Ananthapuramu Mandal, Ananthapuramu District for a period
of 10 years in favour of Smt. M.Gayathri,. under Rule 12 (1) of APMMC Rules,
1966. Vide Prcds: No. 2147 /Q4/2015, dated: 22-07-2015 DDM&G, Kurnool and
subject to satisfaction of terms and conditions laid down in APMMC Rules, 1966.
Subsequently Quarry Lease deed was executed in favour of Smt.
M.Gayathri on 12-08-20015 a period of Ten (10) years commence from 12-
08-2015 to 11-08-2025 for Road Metal & Building stone over an extent of
1.000 hectares in Sy. No. 231 of Chiyyedu village, Ananthapuramu Mandal,
Ananthapuramu District vide Prcds: No. 1307/Q3/RM/2015, dated: 12-08-2015
ADM&G, Anantapuramu and subject to satisfaction of terms and conditions laid
down in APMMC Rules, 1966 .
.t.nnroved subject to the ~ M"ouni Plan" "t'r· - • 1 1
stS l tions mdicatetl m the Mrnnn~. LJe:::r1/ Q/o I CondihOD upu a z_ c, o I L t4Jf- r / I I i
l Letter NO••• ;.t. •••'"ff• • -· Plan Approva f
~(JI ~-- Vo l ()a\edu•~t"'b ,J.
1
J
. )
J
}
}
)
' }
)
)
/
)
)
)
)
) ,
)
)
)
)
O~ OF~~ c~~,,~~ f\1 ;-. i~~
The submi ~fp~·~~~-.~ a pre requisite for Quarry lease as per IT ·- I "" -:i · ~·~ ' . " ' l
Rule 12 (5) (C ~~~~i~JM~1~1\~,~i ~':-- ~ . .D.R. 1999. The proposed mining plan
covers a scienti t~~$~~f.~~~~.m-~~~-~~~~· sment of the deposit which indicates the
details of conser . i'Elf:i;\qt th~._:-qep:6 it and protection of environment in and .. / '"'· .. '·· ·• . . . ;. · around the mining a'rga~/fn:e g1rvey comprises of Topographical Survey, Large
Scale Mapping with contours.
"Granite Conservation and Development Rules 1999" formulated by
Government of India under section 18 of "Mines and Minerals" (Development
and Regulation) Act 1957", aims at the conservation and systematic
development of Granite resources of India, and hence insists on submission of
mining plan prepared by a duly registered qualified person.
Hence the Lessee has entrusted the work to RQP Dr.G.Eswar Reddy for
preparation of mining plan in systematic manner under provisions of rules.
Accordingly, the mining plan is prepared and submitted under provisions of
GCDR, 1999, in accordance with G.0.Ms. No.56, of Industries & Commerce
(M .II), dated: 30-04-2016. In this connection it is to submit that the mining
plan is prepared for first five years.
This survey enables the Lessee to take up the exploration of color Granite
in a systematic manner and plan for future expansion programme.
In this connection it is submitted that as envisaged in the Environment
Impact Assessment (EIA) Notification, 14th September, 2006, the mining
projects with lease area of 5Ha and above irrespective of the mineral ( major or
minor) to obtain prior environment clearance under the provisions thereof.
Further all Category A and Category Bl projects shall under take public
consultation in accordance to EIA Notification, 2006. Further the Government
of India, Ministry of Environment & Forest vide office memorandum No. L-
11011/47 /2011 -IA.II(M), Dated: 18th May, 2012 in order to ensure compliance
of the Honourable Supreme Court Dated:27.02.2012 in I.A.12-13 of 2011 in
J SLP( C ) No. 19628-19629 of 2009, instruction were issued that all the mining
projects of minor minerals including their renewal, irrespective of the size of the
lease would hence forth require prior environment clearance.
2
I
J
,· )
}
)
I
)
)
J /
)
)
' )
)
}
)
)
)
)
)
)
}
~-OF"'tit-A;;~ qc~-~~~l/,N
c,."' Q~~~!Yy~~~~ . . . . The - · ... ~'.l;lt:~1? '\~.~ N1de Not1f1cat1on No. 141(E), Dt: 15.01.2016
I / ... ~-· ·'"\'•''.< ~' ' · · t'~t notified g • \ e:~0,t~?:f-1'.~·:~1~tf~~ion of District Level Environment Impact
Assessmen ;);.,. 'i'J/!~.'fJ,~~f;:r.J'~er guidelines for issue of Environmental
clearances f ~r.;;~!t::l~r~(;:t~ses for an extent of less than 5.00 hec. etc.,
accordingly, mlrtr~f':jfflr~j,e~ome a pre-requisite for obtaining Environmental
clearance. Hence a Provision to the effect that quarry operations for minor
minerals shall be conducted in accordance with the approved mining plan has to
be incorporated by the State Government vide G .. O.Ms. No. 56, Inds.& Comm.
(M .II) Department, Dated: 30.04.2016.
M/s. Smt. M.Gayathri, approached Dr.G.Eswar Reddy, Consultant
Geologist & RQP to prepare the Mining Plan following the guidelines and hence
this Mining Plan is prepared under Rule 7 (A) of APMMC'1966 and submitted .
I GENERAL
Smt. M.Gayathri, W/o Sri M.Prasad,
1.1 Name and Address of the Lessee H.No:4/134, Krishnamreddypalli, Chiyyedu(V),
Ananthapuramu District. Contact No.9866791085.
1.2 Status of the Lessee {Individual/
Private Company Private Company/ Firm)
1.3 Mineral {s) which are included in
ROAD METAL & BUILDING STONE the Letter of Intent
G.ESWAR REDDY M.Sc., B L., RQP /Geologist,
Name and Details of RQP/DMG/ AP/07 /2014,
person RQP/HYD/302/2013/ A, 1.4 employed for preparing Mining D.No.13-2-155- 1,
Plan Shirdi Nagar, ANANTHAPURAMU. A.P. 515001. Mobile : 09849132789. Phone No:08554 222737.
1.5 E-Mail & Website Email: eswarreddygeologi st@gmail.com
1.6 RQP Registration No. & Validity RQP/DMG/AP/07/2014 & RQP/HYD/ 302/2013/ A' Valid Up to Dec-2024
II. LOCATION AND ACCESSIBILITY:
3
)
. )
J
J
I
J
)
) /
)
)
' J
)
)
)
. )
)
)
)
)
)
)
)
)
Geo Coordinates of lease area Datum WGS - 84
B.P No LATITUDE LONGITUDE
A N14° 35' 14.8" E77° 41' 10.0"
B N1 4° 35' 14.2" E77° 41' 17.3"
c N14° 35' 12.9" E77° 41' 17.4"
D N14° 35' 13.0" E77° 41 ' 10.4"
Revenue Stones
Q1 N14°34' 54.5" E77° 41' 35.7"
Q N14° 34' 46.5" E77° 41' 34.9"
*Map Datum: WGS-84
State District Manda I Village Sy. No. Extent in Status of hects. occupancy
Andhra Ananthap Ananthap Chiyyedu 231 1.000 Govt .land Pradesh uramu uramu
( barren)
2. Attach a general location map showing area and access routes:
The Q.L.area is located at 1. 75 km towards South of Krishna ma reddipalli
village. Cart road is having from the village. The village is on road side which is
connecting Ananthapuramu to Kadiri NH-205 Road. The Q.L. area can be
approached from Ananthapuramu to Kadiri NH-205 Road at about 12 km take
left diversion at Krishnama reddipalli village cross towards North along
Chiyyedu road after 1.5km Krishnama reddipalli village is reached then take
right diversion by travelling 1.5km QL area can be reached. The Q.L. area has
good accessibility to the National Highway of NH-205 Ananthapuramu to
Chennai at 2 .50Kms connecting at Krishnama reddipalli village cross. Water is
available at the nearby site in Agricultural Bore Well from Q.L. area . Power
connections are available up to Krishnama reddipalli vi llage, Ananthapuramu
Mandal, Ananthapuramu Dist. Tele communication facility is available at
Ananthapuramu (V), which is at a distance of about 12.5 km all cell networks
can function in t he site area .
4
/
J
)
. )
J
)
)
)
)
)
)
)
}
)
. }
)
)
j
)
)
J
)
)
n (~k~ or-~ . ~-.::~ '' :m·"··.
".','<":' ;_,.-,-... ···- .... f ,;:.:.:.~ I ~ ~~'.M~;J\tr-~/., The _ ,_,~~~~~:i!~J\'% .. ,~ · n is at Jangalapalli which is about 5.0Km.
Nearest P ~fe'ti! ['ti~~-... 4;r;~~: ~~~·:.i nnai, Krishnapatnam, and Mangalore. High
school is p _ ~~,} ri:1~h~i~r~fa~rtf~~illage, Degree level Educational facilities exist ~ ~~· ' •. I: 'J"' 7:; l9/.
at Ananthap ~~~).:H~·~-P.~\~~~lity (PHC) is available at Ananthapuramu which :.,...'\ f . . ........... .J ,-#'. . ·,.:.ti
is 14.5 km. from:.f~'a©ujr.ry site.
Lease Boundaries:
North: Govt. Land QL area .
Govt. Land QL area.
Govt. Land.
South:
East:
West: Govt. Land.
Ill DETAILS OF APPROVED MINING PLAN/ SCHEME OF MINING IF ANY
This is the first Mining plan being submitted.
PART-A
1. General details of the area:
Physiography I Topography:
Topographically the Q.L. area is a hillock gently slopes towards West
direction. Generally it is low lying plain land with an average altitude of 430m
to 485m above M.S.L. and dendritic to sub dendritic drainage is observed .
The area is elevated towards East of the Q.L. area and sloping towards West
direction. The area is devoid of any forest or tree cover. It comprises big size
Boulders and shrubs only. The subject area covers the part of the hillock
comprising negligible soil cover along the depressions of the big size Boulders
& sheet rock exposed over the subject area . The drainage pattern is dendritic
to sub-dendritic. The Q.L area belongs to rocky terrain it does not have
much vegetation . The climate is tropical with temperatures ranging from
28 °C to 38 °C in the summer and 18 °C to 20 °C in the winter. The average
annual rainfall is about 529 .6 mm and 818.6 mm in the year 2010-11.
5
I
-..)
)
~)
)
J
}
')
)
)
)
I )
)
)
)
)
)
. )
)
)
)
)
-cjp-qt-}'?;-_.~.
"' "" v..,..._ \'.\11:-· c~ , .. "<.:L.\~~-'-~'2.~J,,... ~
2. GEO ~ ~~rtg~~~P. · ifION: ,~ .._'f , . . , . .• "· ' ' ,I
a) Reg eJI~f ~~~J.~~1~~ I~ ~ . The Geolo ·~~>t~r~:·~~!.?.fii ~~(:76:..1 Ananthapuramu District can broadly be divided
in two dist1 it~ttd. w~U{m'.9( ~ groups and older group of Metamorphic rocks ' ·' ~..... : . _: • ...... . ,.J,7 ~·z, ...... ...,,,.. ,. .. /
belonging to Arc~~-~-:~ .V{)unger group of Sedimentary rocks belonging to the
Proterozoic age the later cover part of Gondwana block. The remaining parts of
District are occupied by Archean Rocks which consist of Schist, Gneisses,
Quartz veins and basic dykes. The Archean rocks have suffered considerable
degree of tectonic disturbances, as a result of which the rocks have been
metamorphosed and recrystallized.
Stratigraphic Sequences established in the area is as follows:-
Geological age Litho logy
Recent
Pleistocene
Alluvium
Late rite
------------------------------ ---Unconformity-------------------- --- ----- -- -----
Peninsular gneissic complex
(Migmatite group)
Archean
Younger intrusive, epidote veins,
quartz veins and reefs.
Pegmatite's veins of Alkali Feldspar
granite and syenite
Dolerite / Ga bbro / Basa It dykes
Leuco Granite
Nebulitic to homophonous biotite
granite
Nebulitic to homophonous
Hornblende Granite and Leuco
Hornblende granite
Biotite Granite Gneiss, Hornblende
Granite Gneiss, Porphyritic
Hornblende Granite.
6
)
)
)
·1
)
)
)
)
)
)
)
( )
)
)
)
)
)
)
)
)
)
)
)
)
c) Details of the Quarry License Holder: Smt. M.Gayathri,
W/o Sri M.Prasad, H.No:4/134, Krishnamreddypalli, Chiyyedu(V), Ananthapuramu District. Contact No.9866791085.
d) Details of the Prospecting carried out: The subject area is demarcated
on the ground with reference to Revenue Pillars. Later the topographical survey
of the area was carried out. The ABM (BP-Al- 414m) is connected to Grid of
N 14° 35' 14.8" & E 77° 41' 10.0" located on the NW of the Q.L area . Based on
topographical survey and geological features, collected from the surface data,
the surface geological plan is prepared on 1: 1000 scale with 5.0 m contour
interval and enclosed as Plate -3 .
e) Surface Plan area on 1: 1000 scale: The surface cum Geological Plan and
Cross Sections of the Q.L. area is prepared on 1: 1000 scale and is enclosed as
Plates-3 & 4.
f) Geological plan is enclosed as Plate-3.
g) Geological cross sections have been shown on Plate-4.
h) Future Program of Exploration programme planned in next five
years:
As this Quarry Lease is being granted for Road Metal and Building Stone for the
purpose to use as raw material to company own Crusher.
i) Reserves and Resources as per UNFC :
(i) Type of Deposit as per UNFC Guidelines
Road metal and building stone is not failing in any category of UNFC
classification. It is localized mineral available anywhere utilized for
construction purpose such as laying roads, construction of buildings etc. ,
depending upon the characteristics of the rock. Granites, dolerites etc
7
)
}
)
)
)
J )
)
)
)
) . , )
)
) I
)
)
)
I
)
)
)
)
J
ii)
As the ROM is intended for use in the Road metal and Building stone no
specific parameters were considered. The bu lk density of 2.5 is adopted
for estimating the reserves.
The sectional area was considered and assumed thickness of sheet rock
and 60 m on either side of the leased area. The Bulk Density was
considered at 2.5.
ii) Status of exploration: G 1
GEOLOGICAL AXIS:
1. Geological Survey:
i) Mapping: Detailed geological survey was carried out in the area on
1: 1,000 scale with 5.0 meter contour interval.
ii) Preparation of detailed topographical cum Geological map : The
topographical cum Geological map including all surface Geological
features, extent of deposit, structures, have been prepared on 1: 1,000
scale duly marked with surface geological features, GCP's etc. (Plate-3) .
iii) Topo grid / Triangulation stations: The topo grid with Geological
cross sections has been prepared on prescribed scale showing litho-units.
Relevant plans are enclosed as Plate- 4 .
2. Geo-Chemical Survey: Geo Chemical survey is not warranted. The
suitability for aggregates was tested .
3. Geophysical survey: Not carried out because sheet rock of Granite is
exposed on surface itself.
4. Technological survey: Not applica ble.
8
)
)
)
o~ r~r---.ri .... ; '(.,.~ ·;:..Jf'ft~ I :.1 ~
• Detail ~~~~~ra~~ geological survey was carried out on 1: 1,000
scale ~9/.-~~W~~~:~.'°'ftr\f e features, contours at 5.0 m interval, the • . ~ ! ~ ·.~1 ~,'·.'/ .. ': :~· ·t~ · t "' • t ,I
lease ._. R~~.r~~~~i~~!09;/~ ·~~~'-; ogy & Structural features. • The e • . 'ctb.itknes;~,:.o~·: li)>ad metal & Building stone found to be more
{ ... ~~JJl~~ ·~. ' 'f , J ',:.r·~· , I ~
than 60 ~s~¥ci!:c6r~elated from the bore hole inventory data in the
adjacent lands ." · ... -
•Reserves are estimated by cross section method
FEASIBILITY AXIS:
1. Geology: ) The detailed Geology has been detailed in Part-A, Para-2 which may kindly
) be referred to.
2. Mining:
Road Metal and Building stone will be exploited through opencast other than
J fully mechanized mining methods with drilling & Blasting. ROM will be
directly consumed by the Lessee for own crushing plant and intended for the
)
)
)
)
)
)
j
)
)
)
highways Project from Ananthapuramu to Bangalore. The Lessee has already
established the crusher and hot mix plant adjacent to the proposed quarry
lease area.
3. Environment:
The deposit will be mined adopting conventional opencast semi-mechanized
mining methods without any adverse environmental impact. The Lessee will
obtain statutory clearances as soon as this Mining Plan is approved . Mining
in the -leasehold does not disturb any human settlements as they are far
away from the lease area. On the other hand the mining operations will
create livelihood to the villagers nearby. The Lessee will develop green belt
around the QL area as part of his commitment to environment protection .
4. Processing:
After blasting the ROM will be fed directly on to the crusher for crush ing in to desired sizes of aggregates. The crusher is already in place outside the quarry lease area.
9
J
)
)
,I
)
)
le Size/ Make Motive power H.P capacity
1.2 cum L&T Diesel 200
17 tons Diesel 60 Diesel
Diesel 3 compressors
5 Water Tankers 2
6 Loaders 2 3 cum
5. Infrastructure: The entire necessary infrastructure such as office, rest
shelter, magazine, explosive van, water tankers, power connection etc., will
be provided once the mining plan is approved. The Q.L. area is connected
with roads to the Ananthapuramu Manda! and District headquarters.
6. Costing: The cost of production of Road Metal & Building Stone works out
to be Rs. 250/- per ton.
7. Marketing: Road Metal and Building stone is not intended for outside
sale. It is for captive purpose for the crusher and Hot mix plant
established for use in the Highway road project from
Ananthapuramu to Kadiri and other construction projects in
Ananthapuramu District.
8. Economic Viability: As the proposed quarry lease is in the near vicinity
and captive use it is surely economic and viable.
9. Other factors: Relevant clearances shall be obtained for continuing the
mining operations in the QL area.
ECONOMIC AXIS:
1) Detailed exploration:
Detailed topographic survey and geological mapping the Q. L. area was
subjected to detailed exploration by field traverses and well inventory data .
The depth of sheet rock is assessed by the litho log observed in the boreholes
of agricultural lands.
10
I
2) Mini
)
) The entire Q.L. area is covered by Government lands. Durgam Reserve
) Forest Boundary is 4.00 km East of the Q.L area. The interstate boundary
between Andhra Pradesh and Karnataka is 80 Kms North West of the Quarry
)
)
)
)
)
)
)
)
)
')
}
)
)
lease applied area. Hence, considering the above parameters discussed
reserves/ resources are categorized as E-1 Axis.
(j) Feasibility Report along with financial analysis per economic
viability of the deposit: The cost of production of road metal and building
stone is arrived at Rs250/- per ton inclusive of taxes and royalty. The entire
ROM is for only captive purpose as such it is surely economic and profit
oriented.
(k) RESERVES
(i) Mode of Mining, recovery Factor, Mining Losses, Processing Losses etc.,
Road Metal and Building stone will be mining by open cast other than fully
mechanized method with drilling and blasting. The recovery factor is
considered as 95°10 with 5°10 interstitial voids and fractures. There will not be
any mining losses excepting handling loss which will be again recovered
during further loading.
(ii) Cut off grade and Ultimate Pit depth: There is no cut off grade as the
ROM will be put to use for road metal as aggregates. The UPL will be 430m at
the West and 485m in East portion of the QL area during the filth year of this
mining plan period.
(iii) Mineral blocked due to the presence of/ maintenance of benches,
> barriers, internal roads, electrical lines etc,: The mineral will be blocked
in 7.5m safety barrier zone, Roads, Benches which is computed separately
and tabulated in the succeeding paragraphs.
11
)
)
)
)
)
)
)
)
)
)
)
)
)
~·(jr .. ~~~ (iv) Tota l ~· ~~~i~~~'\ The reser
0 ~f:.~~~\[i)~~~~;~Rg field traverses and the litho log of t he well
inventory ~ ~~.:a.~~;f~~f,~;i,ural fields and cross sections drawn on the
ore body. ~f~)~,~tt!l,,:;:~.:~~.~~~ce and the cross sections were taken at 30 m
.. ·~~j;:i:~;.&f.on>~flher side of the Cross section . The occurrence of . . : i, t '• . .
the Granitoid gnei·~~···i~~ore than 50.0 m BGL. Based on the field traverses
and correlated data from the boreholes in the adjacent agricultural lands to a
depth of 150.0m, the estimated reserves are considered as Proved reserves.
The cross sections A-A' & B-B' are considered for computation of reserves.
The present area which is explored is considered for computation of reserves
under G- 1 category.
Table-2
Deposit RESERVES Category SECTIONS Sectional Height Volume OF
Area m3 AGGREGATE in m @ 95% IN
m3
5270 2 10540 --
Proved A-A' 5270 45 237150 225293
247690 225293
4730 2 9460 --
Proved B-B' 4730 78 368940 350493
378400 350493
Total 10000 626090 575786
AFTER BUFFER ZONE 604940 555693
AFTER SLOPE DEDUCTION 528424 502003
Reserves Blocked Under 7.5 M Buffer Zone=20093m 3
Reserves Blocked Under Safety Slopes
Production
RESERVES Rock OF AGGREGATE Waste Topsoil
@5% in m3 @ 2.5/m3 IN
Tons in m3
--- --- 10540
563231 11858
563231 11858 --- --- 9460
876233 18447
876233 18447 1439464 30305 20000 1419371 30247 20000
1255007 26421 20000
) No reserves will be blocked under Safety Slopes
) RESERVES IN UNFC CODE
J
S. No. Category of Reserves UNFC Code Reserves in Cu.mts.
1 Proved 111 502003
) TOTAL 502003
12
/
)
)
)
)
J
)
}
)
)
)
)
Total Mined Reserves of Road Metal 3
= 7872m
Net Mineable Reserves of Road Metal & Building Stone in Q L. area
Total Mineral waste available in Q L. area
(v) Mineable Reserves and Life of the Quarry:
= 502003- 7272 = 494731 m3
3 = 26421 m
Initially, the total quantity of mineable reserves is considered as (economic)
marketable reserves. In this way a total mineable reserves of 494731 m3 are
available in this Q.L. area. The production is proposed to obtain 60167 m3 per year. At
this rate of production, the expected life of the quarry is calculated as given below.
(vi) Life of the Quarry: Mineable Reserves/ Average Annual production =
494731 /60167=8.2Years.
3.0 MINING
) (i) OPEN CAST MINING METHOD (Mining Carried out)
i) This is a running Quarry. The mining are carried out by opencast other than
) fully mechanized mining method with drilling and blasting. The ROM will be
sized and sorted in the crusher established outside the quarry lease area and
loaded on to tippers and tractors using JCB. Mining are carried out by formation
of bench of height 6 mts. The details and sections are depicted on Plate-5.
)
(ii) Year wise tentative excavation in Cubic Meters indicating
development, ROM, Pit wise: About 6,821m2 of excavation out of which
intended ROM 3,30,312m3 of Road Metal & Building Stone will be mined by
13
/
) forming ach after removing the 2mr top soil. The year
) wise det
)
)
)
)
)
)
)
' x.~·.'\{,:·,~-. ·-· ./~ .... i/ / ~> ... -..:· ~. .~ .. , /. Q ""' . 1: .. .. ~-: ....... -_·_-.:: • • ~/.~.I' ·' ..... .
"' '."'"· .. -.. ~, . -. - . I·,;; '-') i\ .... _~...._-:;__ ; . .::-• .... · ·~ .. -· ....... . .J[ l ( . .. .... ,,,,... wo'n<irig~ ~working
Year areas Length m2 in m
1331 2 1st year
1331 50
2nd year 1377 2 1377 48
3rd year 1439 2 1439 46
4th year 1424 2 1424 45
5th year 1250 2 1250 43 6821
GRAND TOTAL
Volume m3
2662
66550
69212
2754 66096 68850 2878
66194 69072 2848
64080 66928 2500
53750 56250
330312
PRODECTION RESERVES RESERVES Rock
OF OF Waste@ Topsoil AGGREGATE AGGREGATE
5% in in m3 @ 95% IN @ 2.5/ m3
m3 in Tons m3
---- ---- ---- 2662
63223 158056 3161
63223 158056 3161 2662
---- ---- ---- 2754 62791 156978 3140 62791 156978 3140 2754
---- ---- ---- 2878 62884 157211 3144 62884 157211 3144 2878
---- ---- ---- 2848 60876 152190 3044 60876 152190 3044 2848
---- ---- ---- 2500 51063 127656 2553 51063 127656 2553 2500
300837 752091 15042 13642 ) (iii) Dump Management: There is no proposal for Dump Yard.
)
\ /
Lay out of Mine Workings, pits, roads, etc.
The Lessee intends to extract Road Metal and Building Stone production to the
tune of ROM 3,30,312m3 of road metal and building stone during the Mining
Plan period.
During this period, it is proposed to exploit the road metal from the total area
of 6,821m2 to an average depth up to 60 m over the lease area from East to
West RL 430 to RL 480 m as shown on Plate 5.
There is no problem in the quality of Road Metal & Building Stone which
confirms to the specifications Aggregates.
The Lessee proposes to carry out mining by opencast other than fully
mechanized method with drilling and blasting. The mineral will be sized and
14
/
I )
J
)
)
d6¢f J]f'1;~- ~ ,((,~ ~l~1f.{l; ~<~·
sorted in crus , rfl\~~~~~~'~·~.~~aration. Trucks/ tippers will be deployed ._ t5J ~:[~~~~~'\ ~t'"' . for transporta .':Jit.i~€71'S 1 -.. ... ·· \/ ... . -... ~~ ''Jj -
1st year : Du ~?1f$'~~e}'~~·; · s it is proposed to develop the working pit "y .(';\ ::--:-- '-.,.,,-</-/~...:.,-1.
Eastern end by !d:9~tJt~ f~~, into 3-6 benches of 7m height each with RL 1\1 --\c~: .·· ·
430 to RL 452 m. The·wbri6-rrgs will be carried out over an area of 1331m2• The
benches will be oriented in NS direction and obtained about 63223m3 of Road
) metal and 3161 m3 of waste and 2662m3 top soil in this year.
)
)
)
)
)
)
2"d year : In second year, the production of Road metal will be obtained by
advancing to the East of 7m benches of first year workings an area of 1377 m2
without changing the orientation of the benches with RL 455 to RL 468m. In this
year about 62791m3 and 3140m3 of waste and 2754m3 top soil in this year.
3rd year : In third year, the production of Road metal will be obtained by
advancing to the East of 7m benches of Second year workings an area of
1439m2 without changing the orientation of the benches with RL 468 to RL 472
m. In this year about 62884m3 and 3144m3 of waste and 2878m3 top soil in this
year.
4th year : In fourth year, the production of Road metal will be obtained by
advancing to the East of 7m benches of third year workings an area of 1424m2
without changing the orientation of the benches with RL 472 to RL 478 m. In this
year about 60876m3 and 3044m3 of waste and 2848m3 top soil in this year.
5th year : In fifth year, the production of Road metal will be obtained by
advancing to the East of 7m benches of fourth year workings an area of
1250m2 without changing the orientation of the benches with RL 478 to RL 478
m. In this year about 51063m3 and 2553m3 of waste and 2500m3 top soil in this
year.
1.1 Drilling and Blasting: 1.2 Drilling and blasting plays an important role for extraction Rom of Road metal and building stone. The primary drilling is done with Crawler drills of 4.5 " diameter and secondary drilling is done with jackhammers and compressor. The compressor attached to the wagon drill
J has 450 CFM capacity and compressor attached to jacks can cater needs of 2 jackhammers. Tippers are of 20T capacity will be utilized for
15
I
)
J
)
..?~ \.~, -1 ·- · :-''~~
£~~~~~~<\~, '£t.c'/ -<-:.~:!-::'JS:. \a,~.~ transp°""'111111np t!~pY{t~~I~~~-.. !~- area to crusher. Broad p l;\t~ts:Qf:(f}l·as;i!\· ~ -
4"1' \ \,·\?.!:;-~;. : .•;< )f h r. ~ P.-\ ) \f f~'· "·.. ... .... ..... \ . '•'i
' ' .\ ''"'"'~: .'./·, .... ,,... "' ' • v
H = Heig ~~Q'CJ!;$~:~~;:f1?1 = Length of drill hole = 11 m B = Burden = 3.0 m S = Spa 'tfg11'0~~ .. ~;~p,·.¥ Diameter of the blast hole = 100 mm VR = Vol., of broken Rock ~'B~*~·-*· L = 3.5 * 3 * 10 = 105 m3 Volume of rock generated from one hole = 105 x 2.5 sg = 262.5 T
After blasting the rock, the excavator is used for loading rocks. The oversize buildings are dealt with secondary blasting. The material thus transported is fed to 250 TPH capacity crushing plant. The products are stored separately from where they are dispatched to customers. Explosive consumption:
Taking on powder factor basis, with a PF of 4 total explosive needed per year is
10,00,000/4 = 250 Tons.
Explosive used:
> The proponent should get permission to use ANFO and also got permission
) under MMR 106 (2(b)) for deep hole drilling and blasting. The explosives that
are used in the quarry are ANFO, cartridge slurries for booster, Pentolite
)
)
)
boosters and other blasting accessories.
Storage of Explosive/ Ammonium Nitrate:
The proponent should have approved explosive magazine 1 with capacity of 4.5
tons. Thus each magazine has filling permission for 10 times per month i.e. 90
tons the magazines can cater the need of explosive storage requirement.
Ammonium Nitrate storage license of 100 tons at a time and twice in a month
i.e., 200 tons of Ammonium Nitrate can be used in a month The client has also
J obtained permission for ANFO mixing shed, where the ANFO is mixed.
)
Manpower Requirement:
A total of 34 persons shall be engaged to carry out the various operations at
the Q.L area. The man power required for the mining operations shall be as per
Table given below.
16
)
)
)
)
)
\ I
)
I I
)
ipper operators
Drill operators Compressor operators Unskilled labours
Deployment of Machinery
The mining machinery and equipment proposed to be deployed in the mine
for different mining operations during the Scheme period are described in
the table below:
Details of Mining Machinery Required Purpose Type of machinery Capacity&. Nos. Make
1. Breaking Crawler drill 4.5" 100 mm dia 450 Atlascapco I cfm / 2 nos. CP
2. Loading Loader / Excavator 2 no.
3. Haulage Tippers 25- tonner, 6nos
4. Water Tractor type tanker 1 no
a) Conceptual Mine Planning: The worked out pit will occupy an area of
6,821 m2 or 0.6821 Hectares to a depth of 60 m reaching 485 m (FRL) at
the Eastern portion of the quarry lease area. The area occupied by internal
roads would be 0.0150 Hectares, while plantation will be occupying an area
of 0.0750 Hectares on the East & Western side of the Q.L area. The
Conceptual plan with Sections is enclosed as Plates 6.
(b) UNDERGROUND MINING: NOT APPLICABLE.
4.0 MINE DRAINAGE -- ----
a) The Q.L. area is over an elevated mound to a height of 15.0 m above ground level. Rain water constitutes the drainage system of the area. Normal course of drainage is a sheet wash over lower reaches and flows through the
) seasonal nala located on North of Q.L area. Groundwater level is observed to be ranging in depth from 60-70 m bgl in the nearby agricultural fields.
17
I
~
)
)
}
)
)
)
)
)
)
)
)
)
)
)
)
)
)
b) Them 1
of workin
c) Quantit estimated
d) The entire Q.L. area is over a sloping terrain and only sheet wash is anticipated during monsoon in the Q.L area. Regional drainage pattern is observed to be dendritic to sub-dendritic in nature. 5.0 STACKING OF MINERAL REJECTS, SUB-GRADE & DISPOSAL OF WASTE
There is no mineral reject or sub-grade mineral in this quarry. However, about 5°/o interstitial voids and intercalated waste is anticipated which is computed separately. This will be utilized for the formation of internal roads and balance utilized to form a barrier all along the 7.Sm buffer zone of the QL area to a height of 2.0m.
6.0 USE OF MINERAL & MINERAL REJECTS The ROM will be fed in to the crusher established outside the QL area
where it will be crushed to desired sizes and utilized for the State & National Highway projects from Ananthapuramu to Bangalore. Entire ROM is intended to use for crushers. 7 .O PROCESSING OF ROM & MINERAL REJECTS
In this area ROM will be sized and sorted in crusher for road metal and input to hot mix plant. There is no Mineral Reject from this Quarry. 8.0 OTHERS
a) SITE SERVICES: Site services such as office Room cum First Aid, Separate Shelter and toilets for Gents & Ladies will be proposed to provide at the QL area.
18
J
)
)
}
PART-B
......... ~ ..... PLAN UNDER RULE 23 OF MCDR' 1988
a)
"\ about 6821
)
1 b) Human Settlements: The QL area is surrounded by 6 villages. The main
·) occupation of the local people is agriculture, Sheep rearing and business. The
J details of villages, location, distance and population are given in the following
1 table:
')
)
)
)
)
)
)
)
)
)
S.No. Name of the village Population Distance Directions in km
1 Itikalapalli 650 4.0 NW
2 Chiyyedu 600 2.7 NE
3 Krishna ma redd i pa 11 i 800 1.5 North
4 Kandukuru 900 4.7 WEST
5 Mannila 850 4.0 South
6 Errayapalli 450 4.5 SE
c) Public buildings, Places of Worship and Monuments: No buildings or
places and Monuments are witnessed in the Q.L area.
d) Indicate any Sanctuary is located in the vicinity of the leasehold:
No Sanctuary, eco-sensitive areas etc. are located in the vicinity of the
leasehold.
e) Flora and Fauna
The subject area is most of the area is covers rocky terrain and does not
consists any major trees or major vegetation. Except the presence of repti les
and other minor wild life like rabbits, field rats etc., no major wild life exists
in this area .
19
I
J
'J
}
)
1
) /
)
J
,1
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
will be degraded for the
(b) Air
of moist clay, sprinkling of water at blasting site and haulage roads. Masks,
earplugs and safety goggles will be provided to the workmen at mine to avoid
the negative impacts of dust arising.
(c) Water Quality: The subject area is far from industries and as such water is
not polluted . The water drawn from bore wells will be supplied to workmen for
drinking .
(d) Noise Levels: The Q.L. area is quite far from the habitation area situated
1.50 Kms away from Krishnama reddipalli village. Noise is anticipated from
drilling, blasting and movement of vehicles. As the quantum of mining is on a
small scale the noise generation would be well within the limits. Therefore, the
noise pollution is expected to be negligible in the area. However, the Lessee
will take all precautions during drilling and blasting by providing mufflers.
(e) Vibration Levels due to Blasting: As the proposed drilling is by deep
hole drilling to some extent and mostly with tractor mounted compressor and
blasting the vibration levels will be maintained to be within the limits.
(f) Water Regime: Mining of road metal will be carried out on top portion of
. the mound in the Q.L. area to a maximum height of 63.0 m in East and in a
closed environment limited to working pit. The mining activity proposed would
not intersect water table of the area. The water table is observed to be 60-70 m
in the adjacent boreholes of agricultural lands.
(g) Acid Mine Drainage: Not applicable.
(h) Surface subsidence: There will not be any surface subsidence as all the
benches and ramp ways will be thoroughly rolled for hard surface.
(i) Socio Economics: Mining of road metal and building stone will create some
employment opportunities to local villagers thereby generating income and
20
J
.... , )
)
}
)
")
J
J )
J
)
)
)
)
)
)
)
)
)
)
)
)
)
)
of paying ro
istorical monuments are located near and
(k)
There is no report of existence of wild animals in this region.
3. Progressive Reclamation Plan: Mining activity will be carried out till the
completion of state highway project and the worked out pit will be protected
with barbed wire and the mined out pit will be used as storage water pit. Hence,
Progressive reclamation is not studied and will be planned in the first scheme of
mining.
4. Mined out Land: No mined out land will be formed during this Plan period
as mineral is existing much below the proposed workings during this plan
period.
The land that will be broken in the successive conceptual periods (the Life of the quarry is anticipated to be 10.6 years as of present) .
LAND USE
The on-going mining and the downstream activities have covered the lease hold for about 0.9348 Hectares as detailed below:
1) Working Pit 6821 m2 0.6821 Ha
2) Buildings 225 m2 0.0225 Ha
3) Ramp Area, Internal
250 m2 0.0250 Ha Road Ways
Total 9348 m2 0.9348
Proposed for reclamation of land affected by quarrying activity during
and at the end of mining
No reclamation is envisaged in the life of the quarry as there are adjacent
quarries that are operation . This point will be dealt while the cluster guidelines are
received. Hence, no reclamation proposals are made.
21
J
}
' ) )
\
)
)
)
)
)
·)
)
)
)
)
)
)
)
)
)
. .. .__.__ ~~~; fr~~ - . , \\J;~~·
~~;~}t13i'~1 . '.I.~ ... "'·· .. .,. ...... , ... JJ7!;·~ ... ·'.% .... \ ·~,,:-:..-,,:, ~ .. : ~:--, -;/ \
~t~~!.}'~=,~~>:· . :i~ 'l-1)!' ··-":i\:';, '·. ~.,~~ ·. •, · ',)
The qu ,).JiJa~~-;~~r~~~a.'.~'.~.i~ ~~~;~ suitable for plantation as most of area is rocky . ,. ':a~ ~ .\ .... . . .. I -o.:t There are ~·~~·;~d(tr~~ .~~.~t g in the North Western side of the quarry applied
area. Howe ~(~~::._&r,op~~i~~9· plant a few trees in the Eastern side of t he buffer
zone of qua~~p~'ffed" '~'r.ei?\t is also proposed to plant a few t rees nearby v illage =-~-.. ~
area in the place shown by the village panchayat. The details of proposed plantation
are shown below.
Details of Year wise Plantation Plan
Year Planned
Location of Plantation Type of Plants Remarks Plantation
1st Year 10 Five in buffer & Five in Neem, or Mango,
village or road sides or Peepal
2"d Year 10 Five in buffer & Five in Neem, or Mango,
village or road sides or Peepal
3rd Year 10 Five in buffer & Five in Neem, or Mango,
village or road sides or Peepal 50% of survival is
4th Year 10 Five in buffer & Five in Neem, or Mango, envisaged.
village or road sides or Peepal
5th Year 10 Five in buffer & Five in Neem, or Mango,
village or road sides or Peepal
Total so Five in buffer & Five in Neem, or Mango, village or road sides or Peepal
All around the quarry that is in the buffer/safety zone of 7.5 meters as per AP
PCB and MOEF rules, around the quarry attempts will be made to grow plants with
local arrangement of drums filled with mud. Thus it is envisaged that around 10
plants will be planted and taken care of in one year. Thus the area available around
the periphery East & West will be sufficient for around 5 years.
Although the area in general is fertile the location where the quarry is situated is
totally rocky. Expect for some wild growing medium sized plants that grow in the
cracks of boulders; there are no notable species in the area. However trees like
Neem, Ashoka, Mango, and loca l species Peepal are found in and around. Therefore
these three species are planned for plantation . Maintenance of these plants that are
grown in the buffer zone will be taken care by the quarry management. The plants
that will be grown in the village will be taken care by the management, in
coordination with the panchayat members.
22
I
)
"\ I
)
1
)
) ... .,
'
)
)
)
J
)
)
)
)
)
)
)
)
)
)
)
)
)
)
In event of any emergency the Contact person is:
Smt. M.Gayathri,
W/o Sri M.Prasad,
H.No:4/134,
Krishnamreddypalli,
Chiyyedu(V),
Ananthapuramu District.
Contact No.9866791085.
8. Care and Maintenance during temporary discontinuance:
An emergency plan to deal with the situation of temporary discontinuance
or incomplete programme due to court order/ due to statutory requirements or
any other unforeseen circumstance will be drawn by the technical and
managerial person to suit the specific situation of this mine. This would be
reviewed and modified to suit changing conditions and needs. This would take
care of preventing of access to dangerous places, pits and prevent accidental
fall in to the water logged pit of animals and men. Security is also to be looked
in to the safety measures placed at various places like firefighting equipment,
main switches etc. Security to be deployed at Explosive storage.
The mining is yet to commence. As mining continues till then the question of
discontinuance does not arise. However, any untoward incidence happens the
safety of the mining area will not be disturbed. Security / Watchmen will be
posted at the mine site for watch and ward.
23
)
1 J
)
)
I <
)
)
)
)
\
)
Management of worked out benches
Reclamation and Rehabilitation by back filling
Rehabilitation of waste land within lease
Cost including watch and care during the year
Void available for back filling( LXBXD) pit wise/ slope wise Void filled by waste I tailings Afforestation on the back filled area Rehabilitation by making water reservoir Any other means (Specify)
Area available (hectares) Area rehabilitated Method of Rehabilitation
Proposed Actual
0.0750 ha Nil
Nil Nil
Nil Nil
Nil Nil
Remarks
No dump is anticipated
No mineral is being worked from the benches.
No proposals made as the worked out pit will be utilized as water harvesting pit.
) 9. Financial Assurance:
Financial assurance can be submitted in any en cashable from preferable a
bank guarantee from a Scheduled Bank at the rates equivalent to rates
prescribed in Rule 23 (F) (2) of Mineral Conservation Development Rules, 1988
) for next 5 years period expiring at the end of validity of the document.
)
)
The proposed mining operations are by Manual method of quarrying and by
shallow drilling and blasting means and hence the cost of reclamation &
rehabilitation is calculated as per the provisions of MCDR, 1988 @ 15,000/- per
hectare or part thereof. This amount works out to be 14,067 /- for 0.9348
Hectare area.
The minimum financial assurance in the form of Bank Guarantee for
1,00,000/- will have be submitted to the Assistant Director, Department of
Mines & Geology, Ananthapuramu.
24
/
)
' )
)
)
)
)
)
)
)
)
Village, Ananthapuramu Mandal,
All statutory organizations, courts etc. have been taken into consideration
and wherever any specific permission is required the Lessee will approach
the concerned authorities.
All the measures proposed in this Mining Plan will be implemented in a time
bound manner as proposed.
10.1 Plan, Section etc,
Plans and Sections are submitted along with Mining Plan.
Date :10 -08-2017
Place : Ananthapuramu.
LESSEE
H ~-rm~ (Smt. M.Gayathri)
Consultant Geologist & RQP
(G.Eswar Reddy)
G. ;: SWAS REDDY, M.Sc., BL Pb.D., f l. ·..:i •• ,Jnised Geologist
IBM/R_-.Je/HYD/302/2013fA RCJP/DMG/AP/07/2014
P . .... rm. .... ..-..
Dcpaty:Director of , ~
~~\
25
)
)
)
)
)
)
)
)
)
)
J
)
)
)
)
)
)
ANNEXURE-1
.~~~ QUARRY LEASE AREA & SHEET ROCK FORMATION
PROPOSED WORKING AREA
26
)
)
)
)
)
)
)
)
J
)
)
)
)
)
)
)
-oOo-ORO~:
Through the reference 1st cited, Smt M. Gayathrl has applied for grant of Quarry lease for
Road Metal & Building Stone Qver an extent of 1.000 Hectare In Sy. No: ·231 of ·Chlyyedu (V),
Anantapuramu (M), Ananthapuramu District for a period of 10 years along with pre-requisites.
The Assistant Dl~ector of Mines and Geology, Ananthapuramu vlde reference 2nd cited has . ; . . . reported that the applied !area has been Inspected by their office Royalty Inspector on 07-07.-2015 and
surveyed by the Surveyqr on 10-05-20~5 In presence of the applleant's representative •. As per tile
Inspection report, the appiled area Is situated South - West of Chlyyedu (V) at a distance of 2 Km and at
a distance of 1.5 Km South - East of Krlshnamr~dypalll (V). Topographically, the ·applied are~ Is a hillock
about 45 MtS height cover~ with boulders a~d sheet rock. Geologlcally, the applied area belongs to
.. , J .rK / Hornblende-Biotite Gneiss .of Peninsular Gnesslc complex of Achaean age. The rock available In the area ~~ . · ,_.,- • Is grey In colour which Is hard and compact and shows fine to medium grain texture; consisting essential
~,;S\!fu1nerals like Quartz, grey and p.lnk Feldspars (Plagloclase & Orthoclase feldspar) and Mafic minerals like
Pyroxenes,"'Biotite and Hornblende, having numerous close spaced joints, quartz veins, The granite rock
avall~n the area is not suitable for cutting and po!lshlng, useful for Road Metal and Bu!lding Stone. ~ . . .
~-.J ""-~Y The surveyor has reported that the app.llcant's representative has shown the r~uired area
er Srld the same has been surveyed and demarcated. After survey the area has comes to a·n extent of
'i..vil'~l.000 .Hectare In Sy. No: 231 of Chlyyedu (V), Anantapuramu (M), Ananthapuramu District. ~ ~ .
v ,.;:;- Geo coordinates for the surveyed area are taken In WGS 84 Datum. The appllcant has satisfied with
~ .v' <{ sur-Yey and given her consent, signed on the surveyed sketch and promised that she does not raise ~ "'>:::> .
., • any objections regan;:llng survey In future. \¥"'""() . """' . The Tahslldar, Anantapuramu . vide Rc.A/604/2015, dt; 11-05-2015 recommended for No
~ Objection .certificate stating that the land In Sy. No: 231 _of Chiyyedu (V) measu~lng full extent of
· 459.24 Acres is a Government land and dasslfJed as "UAW (Ralla Gutta)". There are no trees, wells,
~~--\ tombs are existing over the land and there are no e lectrlcal lines are passing over the. land, mo~t of
').,'3 the area Is rocky, there Is no cu.ltlvation and no encroachment In the applied land and recommended
for grant of quarry lease In Sy. No. 231 of Chlyyedu (V) to an extent _of i.000 H~re In favour of
Smt M. Gayathrl. The R.D.O, Anantapuramu division has issued NOC vlde Rc.No.q1218/2015, dt:
13-05-20 15 and recommended for grant of quarry lease. The D.F.O, Ananthapuramu also Issued
NOC vlde Re.No: .689/2015/G6, dt: 03: 06-2015 stating that the applied area Is about 3.537 Kms
away from the nearest Durgam Reserve ~orest. Finally, the. District COiiector, Anani:hapuramu
and the Chairman, District Level Screenln~ Cominittee vlde Rc.No.G4/10524/2013, Dated: 10-07-
2015 approved the recommendations of the committee for grant of quarry lease for Road Metal and
Building Stone.
Finally, the Asst. Director of Mines and Geology, Ananthapuramli has recommended for grant of
Quarry Lease in favour of Smt M. Gayathrffor Road Metal & Building Stone over an extent of 1.000
Hectare In Sy. No: 231 of Chlyyedu (V), Anantapuramu (M), Ananthapuramu District for a period of 10
years.
(P.T.O)
27
J
)
>
)
)
)
)
)
>
)
)
)
)
/
.,,-• .-1,;.;::: ;--,· .-.::. ..... . . -;-:.·( - ~ lJ~,!~:'
/, \ ("' '- ~ _.,.~ .lit:~
,t<(/,?·r :: ~~ , 'fv. "'""' . , I 1.0 ... /<': _: ·-~ --, ; -7~" /. '.. _..,.t.. , • / ...... ,. ~"- c; Z •2· .
) ,r / , ', , I .. , \ · ~ -~ = f \~(.•'/ ~ .• ; ::: :., ...... ~<l ./.;, . >· tr:.
In ,.or the cfrC:umS.taff,..1>< s bove1 quarry lease ts here by 9, ranted In favoor o f Sm.'!' f.. •• L· ' · . ~ .'!I .... , F r Gayathri ·~ ~e1~ ~~~~~ &,:'~fldl'#~ ne oW?r an extent of 1.000 H~re 111 Sy$ No: "i.31 o·f
Chlyyedu ~~~:~.tJ;'"2J~U ~' ,. nthapura~u District for a period or 10 years under Rule '\
12(1) o f Af' ~ ~t"fTS·'.~· ,~yu1e satfsraction of terms .and condFs laid down. In APMMC .
Rufes, 1966 an~"9 ~tf.~~.'l ~ 1n:StructJons .,nd executive Instructions tsSued from tfme to t:.irne,
an• also to the c~~ ,.;· . ' . )" ; j Jj,(' ' 'c ;fu;;;J 't·'.. ; )i. • 1) The 9rantee sho1..1td pay the folrowu19 amo. unt:s be. tore .. exe<:\ltlof.H ua~,lea .· l'<ICWI : .· .. i. • • '°. ~~.- _., ·
To
· gi< :~-'-';~ l w·:r~l .. ~ · ·.- r;. { :.~i · ·-::.·~·d ··: · ~>Dead Rent : R$. 27~soo1- per hect.. ~r·annu } ,:f.t~ ~ ·,, -~~: . " 1'L.':~ .
.,., i.,.. . .. ,.... ~l~I ... ~ t 'l: !rY.~.( .- ilL~ ~..C;.{ 40
b) Land Assessment : At the rate t»eed by,the'R,e~.t~! - , · · ~· :r.~~·;~J · ..'~~t!Mf!:·E c) Ces.s on LA. : Rs.0 .37 per rupee on ~,n:~ Ai~ID: f :t ~'j i$~ .1 /r1~1;:'; . 'r~f '.-;', · d) :Sec:mlty Deposit ~ EQuN<11lcnt to One year De~d1Ren~.:Sl ;,4-. W'i:.#1t ~d .. '.1). '·"i : '"·
. · ·· ·· .. ftr ...... ~:-~~i1 1J ..t!4 ··~:~i:l~f! .,!~r·: .: ·: ,. · . 2) The grantee should exeo.ite the lease deed be!ore·~·~·:· oJ. ~ 1 :1~ :~r·M~~.~-~d :Geotogy
concerned within 90 (ninety) day.$ from ~he date. o~ t~~e . \ ~~ :!.'-~ ... ,·. ~1 1·. ;:·1• , . • . 'J'. ... • .... ~ . !: ~ ~ ;r.~. : ... J
.3) The Dead Rent, Land A.S..ses.Sme.nt, ~on LA., soou,kf ;~. ~fd~ 1 .. ~'?.~·il~ .t.!J~~ of every year in advance fo.- succeeding yea,, f~nllng whkh t~ lea~ wl.11 be te~ . . , .i~t:ed.J: ~: !
4) The grantee sho1.Jkll pay the Selge.fee @ Rs. SO/- pe~ Cbrn . . ~ ' R~ ·~ .3i'1-! pe.r ~.T. I . I . I•'· Pj .
whichever ts higher. ! · : "'.~. · !1 I 5) The Seigniorage fee or Dead Rent, whk:hevet" ls hEgher shall ~ .ssessed ~n the mjnor
mlneral disl)o'!ltches or c;onsumed from tl1e demJsed land every yearJ ! ·~ I I . : i
6) The Govemment may v~uy the rates of Seige.fee, Oead Rent etc.,: at the time during :Lhe $Vbstance cf' the lease pern::id. T he lessee soould pay and dts.cha~e 1all ttie enhl)nced taxesr rents, rates1 assessments what so-e ... er belr>g charged from t ime to, tire·
7) The grantee should produce inv<!rlab1y all t:he accounts, regis.te<rs, documents. books, records etc., connected with the QU<lrry lease held by s in April o f eYery year before the Asst. Director of Mines and Geok>gy conce-.rned, whether fonn<:!lfy demanded and called for or not.
8} :te~cIAl. CONDWONS:
The !es.see s hall not work wrtl\ln 45 meters or any railway lrne or of any publ ic w-orks or of 3ny public roads or bull'dlngs or of other penna nent stroct\Jrcs as ~ Regutatloo 10'9 of Metalliferous Mines ~egulatkms 40261 an(f Horizontal d lstarn::e of l S meters rrom c.U1er ~nk o f a River or Canal. or frQm t:he bOIJildarles of Lake, Tank or other surface rese.-volrs as per Reg'l.llatlons 127 of M.M. Rnles, 1966 and alsQ with regard to the safety margins to be let\: to t he highways and other Vifl<')ge roads.
liQIE: The grant Is llable for cancellation should It be found It was grossly tnequital>ty or wos made under m istake of ra.ct or owing to mls·repres:entatiOd'l qr frauds or In excess <>f
authority. J:r::,'~ ----:-:-
0 t! P VTY DI 0 MJ.NES & GEOLOGY, KURNOOL.
Smt M. Gayatfui, W/o Sri M. 'P'rasad, ti. No: 4-13.q, Krlshnamredd)'pilfli (V), Chiyyedu (M), Arlanthap1..1ramu District.
Copy together with ROE rs sent to the ADM&G, Anantha1puramu witfl n request to take further action fn the matter duly obt:afnln-g a notarlLcd ~ftldavit from the Grantee with regard to the Assets as per tMlnstruc:tlo11s of the DM&G, Hyd., conta lrled il!'I Memo.No.24212/ PPC.2/96, dt.17·9-9.S and al so l;)Cak!ts
,,. ,..Registration Certificate, if the lessee ls having- stock yard or Unit before execution of the Quarry lease .. ' deed. Further the ADM&G Is requested to send qu~ny lease execution deed &. wo.rk otder immediately
after e:.;ec\itkm of Quarry Lease.
Copy s.ubmit~ed to t.lle m rector or Mines & Geology, H~·de1abu.d for f avour or information.
Copy submitted to the ZoMI Joint Director of Mines & Geology, Kadapa for fovou.r of information.
28
)
)
. ··•
)
)
)
)
)
)
)
)
)
ANNEXURE-II
·'
S ub : Mines & Quarries - Quarry Lease for Road Metal & Building ·Stone over an extent of 1.000 Hect. at Sy. No: 231 of Chiyyedu (V), Ananthapuramu Mandel & D istrict - For a period ·of Ten (10) years -Granted in favour o f Smt. M. Gayathri - Quci rry -Lease deed executed - Wor k O rders - Issu ed .
Re l : 1. Progs. No: 2147/Q4/2015, Dt: 22- 07 - 2015 of the Deputy Director of-Mines and Geology, l<urnool. ~+
/ 2-.--fhis office Letter No: 1307/Q3/RM/ 2015, dt: 31-0 7-2015. ,,./ 3. Letter dt: 03-08-2015 from Smt. M. Gayathri.
/ ***** 0 R ·o ER:
Through the reference 1st cited, the Deputy Director of Mines and Geology,
Kurnool had granted a Quarry Lease for Road Metal & Building Stone ov er an extent
of 1.000 Hect. at Sy. No: 231 of Chiyyedu (V), Ananthapuramu Mandal & District
for a period of Ten (10) years in favour of SMT. M. GAYATHRI u nder rule 12(1 ) of
.i:,PMMC P.uies, 1966.
Through the refere nce 2"" c ited th is o ffi ce had r eq uestec the grantee to p a y
riccessar·y advance rental and su omit requir ed docur.1ents wi t hin i:he stipulated
period and to attend for ex ecution of Quarry Le ase Deed o n or before 17- 10-2015 . ... ~,
Accordingly through the reference 3"' c it ed, th.e grantee had paid necessary
renta ls and submitted required documents on 03-08- 2015 and attended this office
on 12-08-2015 for execution of the subject Quarry Lease deed.
Hence, the Quarry Lease deed is executed in Form-G in favour o f SMT. M.
GATYATHRI on 12-08-2015 for a period of Ten (10) ve.ars commences from
12.08.2015 to 11.08.2025. The lessee . is hereby permitted to commence the
Quarrying operations f:or Road Metal & Building St.one over an extent o f 1.000
Hects . in Sy . No: 231 of Chiyyedu (V), Ananthapuramu Mandal & District, subject to
the conditions as imposed by. the Deputy Director of Mines & Geology, ·Kurnool
through t he reference 1 st cited and subj ect to the satisfaction o f Special condit ions
as appended to the grcint orders and subject to the satisfact ion o f A~MMC Rules,
1966. The Lessee shall invariably maintain all the accounts, registers, documents,
records e tc. , connected with the subject lease b y 5 t" April o f every year before the
Assistant D irecto ;· o f Mines & Geology, Ananthapu ram. The less0.e s r.ou ld submit t he
q•_1an:P-r:y rel:urns in !=or rr -C ta t h e Director of fvi ines an d Geology, Hyderabad,
Dep•.l ty Di rector ot' Mines and Geology, Kurnoo l and Assistant D irector of Mines and
Geolc-g:-·, ,:...n anthapur<:\CT1 u as required L!nder nJie 28 (3) of .A. .P. :'-1 . M. C. Ru les 1966.
{ r>: r .o}
/'17'1 ~~
29
)
)
)
)
)
)
)
)
)
)
.Quarry leased area.
SPECIAL CONDITIONS
The lessee shall_ not work within 45 meters of any railw~-y or of any ·public works or of any publ ic road 'or building or of other permanent structures as per Regulations 109 of Metalliferous Mines horizontal distance of 15 meters from either bank of a River or Cana l or from the boundaries of Lake, Tank or other surface reservoirs as per Regulations 127 of M. M. Rules, 1961 and also with regard to the safety margins to be left to the highways and other village road.
. . -.. , [VOTE: This order will become nvll and void if it will be found that it was grossly
inequitable or was made under a mistake of fact or owing to misrepresentation of fraud or in excess of the authority.
Encl: Appendix Asst. Director o~~gy (FAC),.
Ananthapuramu.
To
....-Bfut. M. Gayathri, W/o Sri M. Prasad, H. No: 4/134, Krishnamreddypalli, Chiyyedu (V), Ananthapuramu District - with a direction to register the Quarry Lease deed before the Registrar, Stamps & Registration department. (Lease ID No: 1211150385)
Copy submitted to:
The Director of Miries & Geology, Hyderabad along with Quarry Lease deed for favour --of:information. (02 sets)
The Zonal Joint Director of Mines & Geology, Kadapa for favour of information.
The Dy. Director of Mines & Geology, l<urnool along with Quarry Lease d~ed for favour of information. ·
The Dy. Director of Mines.& Safety, Bellary for favour of information.
The District Collector, Anantapuramu for favour of information.
The Controller General, IBM, Nagapur for favour of information.
The A.P. Pollution Control Board, Krishna Nagar, Kurnool for favour of information.
Copy to:
The Registrar, Stamps & Registrar department, for information and . necessary action.
The Labour Enforcement Officer (Central), Qr.No.533, Qpp: Railway High School, Guntakal - 515 801 for information.
The Asst. Director of Mines & Geology (Vg .), Gooty for information.
The Tahsi ldar, Aqpnth<1purarnu (M) for informiJtion and necessary action .
30
)
j
)
)
)
)
ANNEXURE-111
GOVERNMENT OF ANDHRA PRADESH
DEPARTMENT OF MINES AND GEOLOGY
CERTIFICATE OF REGISTRATION
AS QUALIFIED PERSON TO PREPARE MINING PLAN
[Under Rule 14(2) of Granite Conservation and Development Rules 1999}
* * * **
Sri 6. ESWAR REDDY. Slo G Pakkiri Redd}~ Rio No: 13-2-155-1,
Pawmanilayarn, Near R. T.C. Bus 5'tand, A nanthapuram, whose photograph and
signature is ~tfixed herein above, having give n e vidence of his qual~{lcation and
experie nce is hereby g ranted renewal <?l recognition under rule I 4(2) of
Granite Conservation & De1·elopment Rules 1999 as Q11al!fted Person to
prepare Mining Plan.
Registration Number is : RQP /DMG/ AP /07 /20:1.4
This Recognition is valid .for a period of JO years with effect .fi·om
22. 12.2014
This cert~ficate will liable to be withdrawn/cancelled in the event o(
furnishing the wrong in.formation ldocwne nts in the A1ining Plan submitted by
him.
Place: Hyderabad Date :)..'},- .12. 2014
Director of Mines and G eology
31
)
. . ' .
artfamt'<l tllfiftl f6 "till -q Jt1~a1 v1fllll ~ ~ ~ Pl4'11<t<..ft. 1960 ct f.rlpr 2ffll' '$ <ml)
OEftTIFICATE OF RECOGNITION ASQUAUFIEO PERSON (Und«Rule 22C of Minend Concession Rufes, 1960)
:e ... cm q\lftq'""' ;Hst1 t l:Iis .r:egismlllon :omnber is
i~_ ... :.:D-
llW sn~dl 7 Cl'll «tft' 3Jilfl!.r ~ ~ 11R t \ill" ~ 39.62.92C ct>T ~ lWft I Tilis recogoiticn is valid for a period of ! years ending on ~- "---~~ ~ &RT JRWf ~ ~UHi 1)-~ \ilMCfil~/GWlcl\JI ~ ~ ~ ~ lf 1tE=
JJJBllT ~ ifNW 1ifm \ifl~'ft/~ ~ ~ I This ct.••.r:tificate will liable ro be ·"v.itb:lr.rwn/cancelle,d in 1be e Vd:Jt of :furni:shttag the
wmng infunnation/docum.ents in the Mining Plan . by him.
~/Phr : Hydenabad ~;17.7.2013.
32
I
)
•
I
. 196 \ ...
\
' I ~
0.0 km 1.0 km 2.0 km
•
/' •
. ,..
3.0 km 4.0 km
I $ .,-
S31.
57F/IO
Manni/a
.. ..
. ..
'
\
PLATE NO - I
INDEX
CHIYYEOU SMT M.GAYATHRI QUARRY
Signature of Lessee
Signature of R.Q.P
G. ::s wAR REDDY. M.SC. B.L.Pbll. R.:;cognised Geologist
IB"''' '.~f'/HYD/302/2013/A f....Jt>iCMG/AP/07/2014
THIS IS TO CERTIFY THAT TliE INFORMAnON IN THIS PlATE
IS TRUE ANO CORRECT TO THE BEST OF KNOWLEDGE BASED
UP ON LEASE MAP AUTHENTICATED BY STATE GOVERNMENT .
Location-Key Plan, Plate No:-1 MINING PLAN FOR ROAD METAL
S.No 231 ,
Extent 1.000 Hectare, Village Chiyyedu, Mandal Ananthapuramu, District Anantl1apuramu(Dist). A.P.
Scale 1:50000 TOpc)S.heet No 57 E/14 77•41' 10.0"E, 14•35• 14.8'N
Lessee SMT M.GAYATHRI
)
)
1
)
)
)
)
TOPOGRAPHICAL CUM GEOLOGICAL PLAN
422.0
422.1
PIT
A'
422.5 ·.
422.0
NO EO
A
Geo Coordinates of lease area Datum WGS-84
POINTS LATITUDE LONGITUDE
A N14° 35' 14.8" E77° 41' 10.0"
B N14° 35' 14.2" E77° 41 ' 17.3"
c N14° 35' 12.9" e11· 41· 17.4"
D N14° 35' 13.0" en· 41' 10.4"
Revenue Stones
01 N14° 34' 54.5" en• 41' 35.7"
a N14° 34' 46.5" E77° 41 ' 34.9"
COM ON BOUNDARY
1 82 8' . .
• . . . ~
. . . . . . . .
E150 COMMON BOUNDARY
. . . . . .
. .
E200
8
E250
PLATE-Ill
O ASSUMED BENCH MARK
c::::J LEASE BOUNDARY «=5) CONTOURS
ROAD BUFFER ZONE
.__.' SECTION LINE
TOP SOIL ROAD METAL
MINING PLAN FOR ROAD METAL & BUILDING STONE
SMT M.GAYATHRI IN S.F.No.231, Ext.1.000, Chiyyedu{V),
Ananthapuramu (Manda! & District), AndhraPradesh.
TOPOGRAPHICAL CUM GEOLOGICAL PLAN
Lessee:- SMT M.GAYATHRI, W/o Sri M.Presad, H.No: 4·134, Krishnamreddypalli(V), Chlyyedu(M) Ananthapuramu District.
Contour Interval : 5 SCALE:- 1:1000
M ·rn~ Signature of Lessee
~~ Signature of R.Q.P
Q. CS WAR KEDDY. II.Sc, B.L Pb.ll, Recognised Geologist
IBM/RQP/HYD/302/2013/A RQP/OMG/AP/07/2014
THIS IS TO CERTIFY THAT THE INFORMATION IN THIS PLATE
IS TRUE AND CORRECT TO THE BEST OF KNOWLEDGE BASED
UP ON LEASE MAP AUTHENTICATED BY STATE GOVERNMENT.
)
'l
"\ I
)
)
)
)
l
)
1
CROSS SECTIONS
B 490• ~490 ~
480-:-:. ':~ . . 480 . . . . 470 : ::·:- ·.: ...... ~'"-''5!. ;s::t" 470 . . . . .. . . . . . . 460 . ................................. . 460 . . . . .. . . . . 450 ~:·:.:·>.:·:·.:·:·.:·:'.:·~ 450
;c:( .. .. • • • • • • • • • c::(
440 b · .... '. ......... Cl. 440 . . . . . . _,, ~. ;;!!. .. .. • • • • • • • • ·~ ~ • • • • • • • • • • ::::>
430 .. o ·:. ·:. ·:. ·:. ·:. ·g >-430 a:f • • • • • • • • .. • *""" . . . . . . "2: . . . . . .. . .. . z
420 GJ· ·.'· ·:. ·:. ·:. ·.'·0'·420 •:z ' . . . ' ~ 41O, .. :i·.'.:·.·.·-.·:".':··.':"~ ·410
'O · · • · • ·O (.;) ................ ()' 400 ' .. · ........ ·. . .. . 400 . . . . . . .. . . . .. . . . . . . . . . . .. . . . . . . . . . 390 .. . . . . . . . . . . 390
A 460 ·
450 .
A' -460
·450 . . . . .. .,/'
440 · · ............. ·:. ·. : . .~~" 440 ).. . • .. • • • • . • • • • • >' a:: .·.·.· .. ·.·.·· a::
430· i . ·: ·:. ·:. ·: . .. ·. ·:. ·.~ >-430 z . . . . . . . q. '::> .. • • • .. • • • • • • • • z
420 o ' · . · . · · · • · · · · ,-=> 420 co • .. • • . • • . . • • • o . ~ z • . . . . • . . . . . . . . ~ o · ·. · .. ".· '.. · .. ·. ·5. 410
41 O· :::;:. . · ·. · ·. · '. · -. · ·. · ".:::;: :? • • • • • • • • • • • • • :?" o. . • . . . . . . . . . .. . 0
400 u · · · · · · · · · · · · ·u. -400 . . . . . . . . .. . . . . . . . . . . . . . . .. . . . . . . . . . . . . 390 .... . ...... ·. . .. 390
I
PLATE - IV
INDEX
TOPSOIL
. ' . BUFFER ZONE
PROVED ZONE
MINING PLAN FOR ROAD METAL & BUILDING STONE
SMT M.GAYATHRI IN SFNo.231, Ext.1.000, Chiyyedu(V),
Ananthapuramu (Mandal & District). AndhraPradesh.
GEOLOGICAL CROSS SECTIONS
Lessee:- SMT M.GAYATHRI, W/o Sri M.Prasad, H.No: 4-134, Krishnamreddypalli(V), Chiyyedu(M) Ananthapuramu District.
1-\ --m~ Signature of Lessee
SCALE:· 1:1000
-<l ·~-~ Signature of R.Q.P
a. ~SWAR REDDY. u.sc .. ~.L.Pb.D. Recognised Geologist
IBM/RQP/HYD/302/20131"RQP/OMG/AP/07/2014
THIS IS TO CERTIFY THAT THE INFORMATION IN THIS PLATE
IS TRUE AND CORRECT TO THE BEST OF KNOWLEDGE BASEO
UP ON LEASE MAP AUTHENTICATED BY STATE GOVERNMENT.
)
)
)
)
A N50
NO EO
Geo Coordinates of lease area Datum WGS-84
POINTS LATITUDE LONGITUDE
A N14• 35' 14.s• en· 41' 10.0"
B N14" 35' 14.2" en· 41' 17.3"
c N14' 35' 12.9" E77" 41 ' 17.4"
D N14• 35' 13.0" en• 41' 10.4•
Revenue Stones
01 N14• 34' 54.5" en· 41· 35.7'
Q N14' 34' 46.5' en• 41' 34.9"
PLATE - V
11\lni=v 'o' ASSUMEO BENCH MA.RX
= LEASE BOUNDARY FOR FIVE YEARS NTDURS
ROAD
c::=J BUFFER ZONE 1':YP .... 4'~ TOPSOIL
ROAOMETAI. - SECTION LINE DUMPYARO __ , POSSIBLE ZONE
~······ .. STOCKYARD UPl I ULTIMATE PIT lEVEl 1 82
Common Boundary
422.1 INDEX
WOR KINGS YEAR WISE ATION
I -YEAR
II -YEAR
422.0 Ill -YEAR
IV-YEAR
E 50ommon Boundary E
1 E 15a mmon BoundaryE 200 V-YEAR
x 490•
480
470
460
450
440 UPL
430·~·"" 420 .. "" ... ,,,,, ,
PIT
\P\ '' l'\I' I'\ I'
,, A ............... ,
/\
" ,, J
111
A ,/
IV I A
•
MINING PLAN FOR ROAD METAL & BUILDING STONE
SMT M.GAYATHRI IN S.F.No.231, Exl.1 .000, Chiyyedu(V),
Anantha uramu Mandal & District • AndhraPradesh.
XI YEAR WISE WORKING PLAN & SECTIONS FOR
UPL 490 FIVE YEARS /
I--~~~~--'-.!..!...-'"--'-'=.!!..!"'-~~~~~~~
480 Lessee:· SMT M.GAYATHRI, ~ ,;-- ":' ~ Wlo Sri M.Prasad,
" 7 ' • ' H.No: 4-134,
• ~ : • .', L 4 7 O Krishnamreddypalli(V), • • Chiyyedu(M)
...,..,,., • Ananthapuramu District ·:. ·:. , .' L460 1--Co-n-to-ur- l-nt-erv_a_I _: 5--'----------S-C-A-LE~:--1-: 1~00~0--I . . .
. r ,1· ~:.:-:.:' .:·: :.:-. L450 / . . . . .
" - - . . . . . . . . . . . . " ....... 440 .. • • • • .. • .. • • • • J.. . . . . . . . . . . . . . . . . . . . . .. · .. · ..... ·. . . . .. 430 . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . .
M·~~ Signature of Lessee
.. · ........ " . ·. . . 420 • .. • • • • • • • L..
o o * 0 0 0 If o o 0 • .. 0 f • 0 • 0. 0 0 f
410·
400
"' . . . . . . . .. · .. · ................... ·. . . · .. · .. · .. ·:. ·.". ·:. ·: .. · .. ·,. ·. 410 • . ~ .· • • .. • • • ... ,• • • • • • • • • • • • • • • • • L • ~ . ·~K· · .... · .. · .. · .. · ....... · .. · .. · .. · .. ·. · .... ··y··· . · ......... ·.· .. · .. · .. · .. ·: ..... · .. ·. ~jj ~ . ' . . . . . . . . . . . . . . . . . . . . . .. . . . . .. . . .. . . .. . .. . . . . . . . .. . . .. . . . . . . . . . . . . . . . .. . . . . . . . . . ~ . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 400
3901-'-'-' '-'--'-'--'-..:........:.~~~'--'--'--'--'----'-~~---'--'-~_.__._.--'-'--'--'--'--'-~" 390
Signature of R.Q.P
G. ~SWAK REDDY, M.Sc. ~.I.. Pb.D, Recognised Geologist
IBM/RQP/HYD/3021201 3/A RQPIDMG/AP/0712014
THIS IS TO CERTIFY THAT THE INFORMATION IN THIS PLATE
IS TRUE AND CORRECT TO THE BEST OF KNOWLEDGE BASED
UP ON LEASE MAP AUTHENTICATED BY STATE GOV ERNMENT.
)
}
N75 A
N50
x
NO EO
x 490
480
470 ~\) 460 ,,,~o
450
440
430
420
410
400
390 • . • .
• .
CONCEPTUAL PLAN AND SECTIONS
. . . • • .
1 82 Common Boundary
WORKING PIT X'
Common Boundary
E150 E200 E50 0 E250
. .
WORKING PIT . . . ~ . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . · ....
. . . • . . . . . • . • . . . . . . . . . . . . • . • • • . . . . • . . . . . . . • . . • . • . . . . • . . . . . . . • . . . . • . • .
. . . . • . . . . . . • • . • . . . . . • . ' . • . • . • . • . • . •
. • . . .
X' UPL 490
• . . . . . .
~480
470
460
450 . . . . . . . . . . . . . . .
. . . . . . . . . • . . . . • . . . . . • . .
PLATE - VI
0 = = BUFFERZ E TOI' SOL
SECTION LINE .._YAAD
STCX::X YARD
INDEX
YEAR WISE
I-YEAR
II -YEAR
Ill -YEAR
IV· YEAR
V-YEAR
ATION
MINING PLAN FOR ROAD METAL & BUILDING STONE
SMT M.GAYATHRI IN S.F.No.231, Ext.1 .000, Chiyyedu(V),
Ananthapuramu (Manda! & District), AndhraPradesh.
CONCEPTUAL PLAN AND SECTIONS
Lessee:- SMT M.GAYATHRI, W/o Sri M.Prasad, H.No: 4-134, KliShnamreddypalliM, Chlyyedu(M) Anantllapuramu Dislrict .
Contour Interval : 5 SCALE:- 1 :1000
t-\ -7'0~ Signature of Lessee
Signature of R.Q.P
G.. ~SWAR REDDY. M.Sc., B.L. Ph.D. Recognised Geologist
IBM/RQP/t-IYD/302/201 3/A RQP/DMG/AP/07/2014
THIS IS TO CERTIFY THAT THE INFORMATION IN THIS PLATE
IS TRUE ANO CORRECT TO THE BEST OF KNOWLEDGE BASED
UP ON LEASE MAP AUTHENTICATED BY STATE GOVERNMENT.
I
' ENVIRONMENT PLAN
vvvvvv vvv
v
vvvvvv vvv
v
vvvvvv vvv
v
vvvvvv vvv
v vvvvvv
vvv vvvvv v vvv
vvvvvv vvv
v vvvvvv vvv
v v vvvvvv vvvvvv vvv
vvvvvv vvv v vvv v
vvvvvv vvv
v vvvvvvvvvvvv v
vvv vvv vvvvvv
vvv v v vvvvvv
vvv v vvvvvv vvvvvv vvv
v
vvvvvv vvv
vvv v vvvvvv vvv v
vvvvvv vvv
v v vvvvvv vvv
v v vvvvvv
vvv vvvvvv
vvvvvv vvv v
vvv v vvvvvv vvv v vvvvvv
vvv v
vvvvvv vvv
v vvvvvv
vvv v
v vvvvvv vvv
v
vvvvvv vvv
v
vvvvvv vvv
v vvvvvvvvvvvv
vvv vvv v v
vvvvvv vvv
v
vvvvvv vvv
v
Q.L.AREAS
vvvvvv vvv vvvvvv
v vvv vvvvvv v vvvvvv
vvv vvv vv vvvv v v vvv vvvvvv vvvvvv v vvvvvv vvv
vvv vvv v v vvvvvv v vvvvvv
vv v vvv v vvvvvv v vvvvvv
vvv vvv vvvvvv
v v vvv
vvvvvv vvv
v
vvvvvv vvv
v vvvvvv
vvv v
v
vvvvvv vvv
v
vvvvvvvvvvvv vvv vvv
v v vvvvvv vvvvvv vvv
vvv v v
vv vvvv vvvvvv vvv vvv
v v
Q.L.AREAS Q.L.AREAS vvvvvv
vvv v
HILLOCK
PLATE - VII
1Nni=x l o ASSUMED BENCH MARK
I I LEASE BOUNDARY
Cl ?> CONTOURS
L . ~ PIT ROAD
vvvvvv CULTIVATION LAND "'!."' c::::::::> 60m BUFFER ZONE
c:::::::=:> 500m BUFFER ZONE EXISTING DUMP YARD
[!, VILLAGES
MINING PLAN FOR ROAD METAL & BUILDING STONE
SMT M.GAYATHRI IN S.F.No.231 , Ext.1.000, Chiyyedu(V),
Ananthapuramu (Manda! & District), AndhraPradesh.
ENVIRONMENT PLAN
Lessee:· SMT M.GAYATHRI, W/o Sri M.Prasad, H.No: 4-134, Krishnamreddypalli(V), Chiyyedu(M) Ananthapuramu District.
Contour Interval : 5 SCALE:- 1 :5000
Signature of Lessee
s 'JV~ Signature of R.Q.P
Ci. ::;s\llAR REDDY. M.Sc., B.l. P~.O., Recognised Geologist
IBM/RQPIHY0/302/2013/A RQP/DMG/AP/07/2014
THIS IS TO CERTIFY THAT THE INFORMATION IN THIS PLATE
IS TRUE ANO CORRECT TO THE BEST OF KNOWLEDGE BASED
UP ON LEASE MAP AUTHENTICATED BY STATE GOVERNMENT.
13~ '
I '
I I l
iJistric; ANANTt\PUR ---'\tlardai ANANT~B
t/ c •
ii .
~j •• d 8 •11 :>
A
91....t,i... ~ 111\A. -4-· .f •......f -+., ..... ~ ~t; ,.i,J ..., __ _
Vrl age No.·
r ie.d No: - -
I l\..'4:>r >t~ . >t-- •
,09µ I " h ". !Or 01 ""
ilJlir.es o l.;i:olcgy, KUBNOOL
\I.RO: 1018 MANNILA
~i~L~w OIO ..:JM&G\J
M ,~lESSEE
·-
\ '1
2~ - . -----
-
;; - u
4 •"
( J
, ..
" .
--· ·- -- · -- --~-·-----·
......
Vi' nge N.1me CHiYYFDU ·----... <i? b PLATE No 2
fl. P'l . .. - ··-· .
- --------~ -U . Surveyed t\ro;i
~ : - for Quarr1 l.ea3'S 1 GOO Hee. - .
I
\~ ,. --- - - --
,