Global Programme for

Sustainable Ship Recycling

Dhaka 12 – 13th January 2008

Mark Gilligan

Golder Associates

THANK YOU

Introduction to

H&W,

Golder Associates.

LOCATION OF SITE & FACILITIES

H&W Belfast

Europe

NorthernIreland

WHY?

HOW?

PLAN OF SITE & FACILITIES

Direct SeaDirect SeaAccessAccess

Fabrication Fabrication HallsHalls

Repair Dry Repair Dry DockDock

Main Dry Main Dry DockDock

Photograph January 2005

PLAN OF SITE & FACILITIES

Photograph January 2005

GANTRY CRANES

• 2 x 840 tonne SWL• Span 140m• Lifting height 80m• Loading / offloading

directly from sea.• Combined lifting

capacity of 1600 tonnes.

MULTI-WHEEL TRANSPORTERS

• 400 Tonne• 250 Tonne• 75 Tonne

BUILDING / CONVERSION DOCK

• 556m x 93m• 7m Draft• Intermediate dock

gate - at set locations along the length of the dock.

SHIP REPAIR DOCK

• 335m x 50.29m

• 12.2m draft above the blocks

• Slops reception / Permit

• TBT paint removal

• Open grit blasting

More than 150 countries

More than 6,500 staff

globally

More than 12,000 projects each year

Engineering solutions since 1960

Golder Associates

Golder Associates

Locations and Staff Distribution 2008

More than 6,500 people, 144 offices, 6 continents

Canada2650

USA1250

South America

600

Europe850

South Africa250

Asia Pacific

900

Land Development

Water Resources

Mining

Agriculture & Forestry

E.D.D.(Finance)

Waste

Power

Oil & Gas

Manufacturing

Transportation

Golder’s Market Breadth

Global Demolition Team : Full range of sectors

Oil Refineries

Chemical Plants

Breweries

Residential

Marine Vessels

Offshore

Airports

Hospitals

Post-conflict / Disaster

Silos

Certification and Licenses

H&W has a ‘Waste Management Licence for the Dismantling of Marine Vessels and Marine Structures’

H&W has operational planning permission for ‘…ship and marine structure…dismantling,’

H&W’s Quality Management System is ISO 9001:2000 accredited

Leading Edge: Ship RecyclingMSC Napoli

Onshore decontamination and dismantling of the forward section (11,300t)

Accelerated onshore recycling within strict UK regulations and legislation on H&S, waste management and environmental control.

Sound and auditable solution for client’s liabilities.

Leading Edge: Ship RecyclingMSC Napoli

Leading Edge: Ship RecyclingMSC Napoli

LeadingEdge:ShipRecycling

MSC Napoli

The H&W – Golder Associates

Solution:

“To provide vessel owners with a

sound, environmentally beneficial

and cost effective solution to their

assets and liabilities”

THE NEXT STEP

Harland and Wolff

Golder Associates

V Navy

THANK YOU

Any Questions?

CONTACT INFORMATION

Harland & Wolff HI LtdQueens IslandBelfastNorthern IrelandLawrence CobainTEL: +44(0)2890 534389 FAX: +44(0)2890 534027 LawrenceC@harland-wolff.com

Golder Associates (UK) LtdCarnmoney House Edgewater RoadBelfastMark GilliganTEL: +44(0) 7770 803575FAX: +44(0) 2890 787770mgilligan@golder.com