gfmi aerospace division line card 4jun10
Post on 06-Jul-2015
256 Views
Preview:
DESCRIPTION
TRANSCRIPT
ALL SERVICES UNDER ONE ROOF – A ONE STOP SHOP
Design Engineering Programming Machining Tooling Composites Fabrication Surfacing Paint Assembly Quality Control Test Shipping
ENGINEERING & DESIGN CATIA V5 - Primary Software FTP Secure Data Transfer Alias Design Vericut Tool path Simulation Delmia Process Simulation
PROCESS
PROJECT MANAGEMENT Planning/Scheduling Primavera P6 software Real time planning – budget vs. actual Resource planning
(3) JOBS 5-AXIS CNC MILLS Simultaneous 5-Axis X=256”, Y=70”, Z=55” 16,000 RPM 16 HP
(2) FIDIA 5-AXIS CNC MILLS
Simultaneous 5-Axis X=65”, Y=30”, Z=28” 24,000 RPM 46 HP
LASER – 3 KW – 5-AXIS
Cut – up to ½” thick Flat and compound shapes Steel, Aluminum Plastics - Acrylic
SLS RAPID PROTOTYPE High Strength Nylon Parts from CAD data Max. part size – 17” x 17” x 17” Complex structural parts
BLADDER PRESS 5000 PSI Max. part size – 31” wide x 72” long x 4” high GFMI produces the tooling
GLASS FORMING
Compound Formed Glass Tempered and Laminated Large Vacuum Former (acrylic) Auto/Aerospace/Locomotives
PAINT SYSTEM (3) SAICO Downdraft Booths (7) Downdraft Sanding Stations Climate Controlled PPG Paint Mixing System (Cert.)
CMM INSPECTION ROOM
Climate controlled Certified Granite Table CMM Digitizing System Leica CMM
CNC PRE-PREG CUTTING
Table size – 6.5ft. x 12ft. Cuts Pre-Preg Carbon Fiber Cuts Bagging Materials for Kits CAD data input
SHEET METAL FABRICATION
Shrinkers Stretchers Edge Formers Iron Worker English Wheels
COMPOSITES CLEAN ROOM Class 100 Climate controlled Large walk in Freezer (pre-pregs) Vacuum bagging system
AUTOCLAVE Computer controlled Up to 220 psi and 650 degrees F Liquid Nitrogen Storage Tank 11ft. dia. x 22ft. long inside
METAL STAMPING 2000 ton – triple action 450 ton – double action 50 ton – mechanical press Hydraulic 12’ brake Hydraulic 10’ shear
CATIA V5
All Services Under One Roof - A One Stop Shop
Contact Information
www.gfmiaero.com www.metalcrafters.com George Gaffoglio Adrian Corbett Catherine Merola CEO Operations Manager Business Manager 714-481-0786 714-481-0781 714-481-0790 714-351-2050 cell 714-719-0419 cell 714-920-1782 cell ggaffoglio@metalcrafters.com acorbett@metalcrafters.com cmerola@metalcrafters.com
Engineering & Design Services
Prototype & Mock-up Production
Tooling Production
Manufacturing & Composites
Company Information
GFMI Aerospace and Defense 11161 Slater Avenue Fountain Valley, CA 92708
Facility Size 130,000sq.ft. Number of employees 140 Year Established 1979 DUNS number 045954625 CAGE Code 4FLK3 Quality System AS9100B ISO 9001:2000
FEA - NASTRAN
top related