george street boundary road pimlico street camarero … · 2/7/2020  · boundary road pimlico...

Post on 06-Aug-2020

2 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

10m

10m

33.2m

10m

10m

33.4m

10m

10m

33.7m

7m5.6m

30.4m

11m

34m

8.1m

5.6m

26m

11.9m

4m

51.9m

A7.8

10.2m

29.3m

9.6m

A8.1

10.2m

29.5m

4m

A6.85.8m

12.5m

30.1m

10.2m

10.2m29.4m

12.5m

12.5m

29.4m

10.2m

10.2m

29.4m

10.2m

10.2m

29.4m

10.3m

10.3m

29.4m

13.2m

561m²

29.4m

14m

29.4m

1001

1003 (A)

(A)

(A)

(B) (B) (B)(B) (B) (B) (B) (B) (B)

(B)

(B)

(B)

(B)

(B)

336m²

333m²

368m²

339m²

352m²

351m²318m²369m²300m²368m²300m²300m²302m²400m²

1004

1002

1015

1010 10141013

1011 10121008 1009100710061005

29.9m

30m

278m²

254m²

375m²312m²375m²315m²315m²375m²375m²465m²

11.87

m

5.7m

14m

15.87

m

18m

14.13

m

18m

14.13

m

12.5m

12.5m

30m

10.4m

10.4m

30m

12.5m

12.5m

30m

10.5m

10.5m

30m

10.5m

10.5m

30m

12.5m

12.5m

30m

11.8mA&C0.7

12.5m

30m

A13.2

7.4m

2.8m5.7

m

18m

9.5m

30m

1024

1025

10231022102110201019101810171016

(B) (B) (B) (B)

(B)

(B)

(A)(A)(A)(A)

Disclaimer: This lot plan is indicative only.

Purchasers must rely on their own enquiries, the contract for sale of land and the building contract. Dimensions, contours and areas are subject to final survey and are subject to council approval.

Easement and sewer locations are indicative only and are subject to change. Information shown is accurate as of January 2020.

RAWSONCOMMUNITIESBox Hill

LEGEND:

(A)

SEWER PIPELINE

RETAINING WALL

EASEMENT FOR DRAINAGE OF WATER 1.5m WIDE

(B)

STREET TREES

EASEMENT FOR MAINTENANCE 0.9m WIDE

DRIVEWAY CROSSING

LOT LEGEND:

FUTURE STAGE

EXISTING STAGE

ADJACENT DEVELOPMENT

79-91 BOUNDARY ROAD

BOX HILL

Stage 1a

NORTH

FLEMINGTON PARKWAY

FLEMINGTON PARKWAY

L

IM

E

R

IC

K

S

T

R

E

E

T

GEORGE STREET

BO

UN

DA

RY

R

OA

D

PIM

LIC

O S

TR

EE

T

CA

MA

RE

RO

S

TR

EE

T

STAGE 1A LOTS

top related