The company
Since its foundation in 1989 in Madrid, GEOCONSULT is at the top of
Spanish firms in Tunnels Engineering.
Specialized in Tunnels, Underground Works, Mining and
Geotechnics.
Geoconsult takes part in:
� CIVIL WORKS TUNNELS PROJECTS
� MINING PROJECTS.
� TUNNELS EXPLOITATION INSTALLATIONS
�SUPERVISION AND WORK CONSULTANCY.
�INSPECTION AND TUNNELS REHABILITATION PROJECTS
�GEOTECHNICAL SURVEYS.
� LINEAR INFRAESTRUCTURE GEOPHYSICS.
� HYDROGEOLOGY.
�TUNNELS GROUND WORKS AND MONITORING
Accredited experience
�The tunnels works budgets designed by Geoconsult in last
years add up 2.250 millions €
�Geoconsult has turned over above 45 millions € for design
contracts of these tunnels
�Geoconsult has designed more than 200 tunnels along its�Geoconsult has designed more than 200 tunnels along its
history
� The tunnels designed by Geoconsult include all the
construction methods: NATM, TBM, etc.
Underground works and tunnels
projects and supervision
FLAC3D 3.10
Itasca Consulting Group, Inc.Minneapolis, MN USA
©2006 Itasca Consulting Group, Inc.
Step 949808 Model Perspective10:06:44 Thu Jul 08 2010
Center: X: 3.893e+000 Y: 2.341e+001 Z: -1.872e+000
Rotation: X: 10.000 Y: 0.000 Z: 20.000
Dist: 5.427e+002 Mag.: 4.77Ang.: 22.500
Job Title: Túnel Las Calbezadas
View Title: Sostenimiento Tipo II
Block Group Live mech zones shown
sost_avanceterrenocontrab_inter_dddestroza_ddrevest_ddzapata_ddsost_ddrefinocontrabovedazapata_disost_di
SEL Geometry Magfac = 0.000e+000
SEL Geometry Magfac = 0.000e+000
SEL Geometry
Plano de Sostenimiento Método Austriaco
Cálculo 3D con Elementos Finitos Simulación Numérica de Incendios
� Field geology and geological cartography
� Outcrop analysis
� Geological risks studies.
� Borehole surveys design and management
Outcrop analysis
Geology , geological cartography
and geological risks
Borehole survey
Geological profile
Railway filling slopes stabilitySection: Tocón – Valderrubio. Córdoba - Málaga
High Speed Railway
� Tunnels geotechnics.
� Slope stability analysis.
� Structure geotechnics.
� Fillings geotechnics.
� Materials reuse
Geotechnical surveys of linear
infraestructure and building
3 D Model . Section Tocón – Valderrubio. Córdoba – Málaga high Speed Railway Line
�Modelling and characterization of
Aquifer systems :
� Flow and transport models in underground
waters
� Pumping tests analysis and interpretation
�Hydrogeology applied to civil works:
Pumping tests
Hydrogeology
� Hydrogeological surveys
� Treatments and surveys of infiltrations in
underground works
� Analysis and remediation of barrier effect
�Environmental hydrogeology:
� Hydrologic impact surveys
� Hydrogeological control and monitoring
software applications
Numerical modelling: Piezometry before and after the
tunnel excavation
Piezometric drilling control
Our own equipment:
�Electrical tomography.
� GPR.
� Seismic refraction.
� Full waveform sonic log.
� Impact echo equipment for determining
concrete thickness and segments extrados
fillings .
Electrical tomography equipment
Geophysics
fillings .
Detección de Cuevas mediante tomografía eléctrica. LAV Nuevo Acceso Ferroviario al País vasco (Y-Vasca)
Impact echo equipment
�Monitoring equipments
installation.
�Geotechnical measuremenst and
its interpretation
�Retrospective and present
monitoring of subsidences by radar
satellite
� Web based GIS display Presentación de datos de
Monitoring
� Web based GIS display Presentación de datos de auscultación a través de Internet
en formato GIS
Mapa de Subsidencias obtenido mediante Radar Satélite
Quality and Environment Certificates
Shield TBM, Chamartín tunnel(Madrid).
Shield EPB TBM. MetroSur tunnel(Madrid, Spain)
Long tunnels
Double shield TBM, La Cabrera tunnel (Valencia, Spain)
La Cabrera tunnel. TBM Cutting head
TBM Dismantle chamberLa Cabrera tunnel, (Valencia)
Pajares tunnels(Asturias – León, Spain)
High Speed Railway tunnels
Geoconsult has taken part in 40 tunnels, above 120 km for ADIF..
N NAME LONG (m) CONSTRUCTIVE METHOD HIGH SPEED RAILWAY LINE
1 PAJARES 24.648 TBM MADRID- ASTURIAS
2 FORCAREY 17.426 TBM ORENSE-VIGO
3 SORBAS 7.536 TBM CORREDOR MEDITERRÁNEO
4 LA CABRERA 7.246 TBM MADRID - VALENCIA
5 PONTONES 3.817 TBM MADRID – ASTURIAS
6 KORTAXO SAKON 3.180 CONVENTIONAL Y- VASCA
7 EL BOSQUE 3.128 CONVENTIONAL MADRID – VALENCIA
8 LEGORRETA 2.952 CONVENTIONAL Y – VASCA
9 ORDIZIA 2.832 CONVENTIONAL Y – VASCA
10 PRÁDANOS 2.775 CONVENTIONAL BURGOS – VITORIA
11 BUBIERCA 2.433 CONVENTIONAL MADRID – BARCELONA
12 VEGA DE CIEGO 2.418 CONVENTIONAL MADRID – ASTURIAS
13 JOMEZANA 2.077 TBM MADRID – ASTURIAS
14 BEASAIN ESTE 1.968 CONVENTIONAL Y – VASCA
15 BUÑOL 1.858 CONVENTIONAL MADRID – VALENCIA
16 PICO DE SIERO 1.674 CONVENTIONAL MADRID – ASTURIAS
17 LA TORRASSA 1.530 CONVENTIONAL MADRID – BARCELONA
18 ALBA 1.132 CONVENTIONAL MADRID – ASTURIAS
19 EL ALMENDRAL 1.106 CONVENTIONAL CORREDOR MEDITERRANEO
20 BRIVIESCA 1.085 CONVENTIONAL BURGOS - VITORIA
21 OLABARRIE 1.041 CONVENTIONAL Y– VASCA
22 SOTIELLO 1.009 CONVENTIONAL MADRID – ASTURIAS
23 LUKO 961 CONVENTIONAL Y – VASCA
24 LAS CABEZADAS 904 CONVENTIONAL BURGOS – VITORIA
25 LAS DEHESILLAS 861 CONVENTIONAL MADRID – BARCELONA
26 MAYORALES 827 CONVENTIONAL CORREDOR MEDITERRANEO
27 BUEN SUCESO I 736 CONVENTIONAL MADRID – ASTURIAS
28 PEREDILLA 711 CONVENTIONAL MADRID – ASTURIAS
29 SAN ANDRÉS 703 CONVENTIONAL Y – VASCA
30 NOCEDO 701 CONVENTIONAL MADRID – ASTURIAS
31 URLEZAI 654 CONVENTIONAL Y – VASCA
32 TESO 636 CONVENTIONAL MADRID - ASTURIAS
33 CASTRO 493 CONVENTIONAL MADRID – ASTURIAS
34 ARRIARÁN 479 CONVENTIONAL Y – VASCA
35 SIETE AGUAS 424 CONVENTIONAL MADRID - VALENCIA
36 CASTEJÓN 392 CONVENTIONAL MADRID - BARCELONA
37 LOINATZ 370 CONVENTIONAL Y – VASCA
38 BUEN SUCESO II 251 CONVENTIONAL MADRID – ASTURIAS
39 ITOLA 219 CONVENTIONAL Y – VASCATOTAL LONGITUD (Km) 105, 2
These pictures show our most remarkable works developed in last five years.
High Speed Railway Tunnels
Pajares tunnels (Adif)
Location .- León and Asturias
Length. - 2 tubes , 24.6 km
Execution method .- TBM
Free cross section .- 56.7 m²
Siete Aguas-Buñol (Adif)
Location.- Valencia
Length .- 3 tunnels, 9.5 km
Execution method.- TBM, Conventional
Sorbas (Adif)
Location .- Almería
Length. -.- 2 tubes , 7.5 km
Execution method.- TBM
Free cross section.- 85 m²
method and artificial tunnel
Free cross section.- 55, 110 and 145 m²
Vigo-Das Maceiras (Adif)
Location . - Pontevedra
Length. - 2 tubes, 8.2 km
Execution method .- TBM
Free cross section .- 56.7 m²
Geoconsult has participated actively in the development of subway networks in several Spanishcities. The most remarkable projects took place in cities such as Madrid, Bilbao and SanSebastian
Subway Tunnels
METRO DE BILBAOLine 1: Section :Arenal -Casco ViejoLine 2: Geotechnical supervision to the constructionSection :Aritz-BasauriLine 3 : Geotechnical supervision to the construction.Section :Txurdinaga- Casco Viejo
METRO DE MADRIDLine 1 : Section :Plaza de Castilla-Pinar de ChamartínLine 4: Section: Pinar de Chamartín-Parque de SantaMaríaLine 6: Section :Príncipe Pío-MoncloaLine 7 : Section :Av. América-Alonso CanoLine 10 : Section: Alonso Martínez-Nuevos MinisteriosLine 12 (Metrosur) Section VII .- Juan de la Cierva-Alonso de Mendoza (Getafe). Moncloa Interchange
METRO DE SAN SEBASTIANLine 1Section Herrera – Altza
In the last five years, Geoconsult has designed above ten road tunnels for highways, it means,above 25 km excavation. Besides, we have participated as Supervision in importantinfrastructure works such as bypass highways in cities like Bilbao, Madrid, etc
Road tunnels
SOUTH METROPOLITAN BYPASS IN BILBAO:(Pais Vasco. SPAIN)This infrastructure runs a bypass beltway aroundBilbao city. For this, it was designed seven tunnelswith a big section ((Argalario, Mesperuza, SantaÁgueda, Arraiz, Larraskitu, Arnotegi andSeberetxe), above 20 km excavated.
Some of our pioneer designed works are knownworldwide such as the construction of a hugechamber in Arraiz tunnel, 28 m wide and 100 mlong.
Big chamber in Arraiz tunnel
Larraskitu and Arnotegi tunnels portal
PEINADOR TUNNEL(Vigo. SPAIN)Double tunnel for highway that runs 20 m underPeinador Airport. The tunnel has been designed tobe built without interrupting the landing and takeoffoperations.
Peinador Tunnel. Vigo Airport
Geoconsult has participated in the main hydraulic projects developed lately in Spain:
Hydraulic tunnels
PRELIMINARY PROJECT OF SORBE – BORNOVA DIVERSION(Guadalajara. SPAIN)Survey of Alternatives andpreliminary project for theconstruction of big diversion tunnels( 9.000 -4.000 m).
INTAKE AND OUTAKE TUNNELS.(Escombreras. Murcia. SPAIN)Design of outfall and headracetunnels, 2.5 km long. Undersea tunnel,by drill and blast
HYDRAULIC TUNNELS. SEGARRA –GARRIGUES CHANNEL(Lérida. SPAIN)Four tunnel design for diverting water. 1, 2.5 y 3 km long.
Geoconsult is also especialized in tunnel exploitation installations:
Tunnel installations
TUNNELS INSTALLATIONS PROJECTS FOR THE NEW ACCESS TO SAN MAMES(Bilbao. SPAIN)
We have designed the exploitationinstallations (electrification, ventilation,lighting, safety, signalling, etc) in fiveartificial tunnels and tunnel in mine for theredesigning of the access to Bilbaothrough San Mamés.
TUNNELS EQUIPMENT ADEQUACY FOR THE ROAD NETWORK IN ASTURIAS(Asturias. SPAIN)(Asturias. SPAIN)The project redesigns the road tunnelinstallations for its adequacy to theminimum safety requirements. It includesnew designs of connection galleries toaccess to emergency vehicles, CRT,ventilation, lighting, protection againstfires, CCTV, safety, etc
INSTALLATIONS ADEQUACY FOR THE SOMOSIERRA TUNNELThe project adecuates the installations and the existing equipment
Geoconsult has carried out the biggest geotechnical surveys campaigns developed in Spain inthe lineal infrastructure works range.
Inspection and tunnel
rehabilitation projects
INSPECTION AND TUNNEL REHABILITATION PROJECT. LINES 1 AND 2. METRO DE MADRID.(Madrid. SPAIN)Inspection to verify the structuraland functional status of the oldestlines in Metro de Madrid (Lines 1and 2).With the data obtained by theinspection, it was carried out aproject of structural support andtunnels improvements
INSPECTION AND TUNNEL REHABILITATION PROJECTS FOR BASQUE RAILWAY NETWORK IN GUIPUZCOA(Guipúzcoa. SPAIN)The project consists of theinspection and drawing-up oftunnels rehabilitation projects forBasque Railway network.To carry out this work, it wasused modern inspectiontechniques with our ownequipments (GPR, Impact-Echo,termography, etc.)
Geoconsult designs projects in huge underground mining exploitations
Mining
“A FRAGUIÑA” MINING EXPLOITATION CHAMBER (Orense. SPAIN)
In O Barco de Valdeorras (Orense), it has beendesigned several underground chambers toexploit shales.Their dimensions are enormous for this type ofmaterial: 60 m high x 30 m wide x 120 m long.
“APARIO” CHAMBER FOR CALCAREOUS AGGREGATES EXPLOITATIONAGGREGATES EXPLOITATION(Vizcaya. SPAIN)
In Lemona, it was developed the project AparioChamber. It is an underground exploitation forcalcareous aggregate. It uses the sublevelsmethod.
MINING PONDS MONITORING. “LAS CRUCES” COPPER MINE (Sevilla. SPAIN)Monitoring by inclinometers, piezometers and surveying.
Geoconsult has carried out the greatest geotechnical surveys campaigns developed in Spain intolinear infrastructure works range.
Geotechnical surveys for linear
infraestructure
GEOTECHNICAL SURVEY IN PAJARES BYPASS(Asturias - León. SPAIN)Geotechnical survey of a high speedrailway section, 45 km long, includingPajares tunnel (25 km). It was drilledmore than 20 km.
GEOTECHNICAL SURVEY OF THE NEW RAILWAY ACCESS TO BASQUE COUNTRY (Y-VASCA(Vizcaya - Guipúzcoa. SPAIN)
Survey referred to layout mountainsection belonging to the new basquenetwork of high speed railway, 32 kmlong, It was carried out more than 250drillings, 10 km long
Offices
o Madrid. headquarters
C/ Arrastaría, 21. Módulo A, 2ª P
28022 Madrid
Phone: (+34) 913 041 846
Fax: (+34) 913 042 047
info@geoconsult.es
o Local Office in Euskadi
C/ Santiago de Compostela, 12, 3ª, F
48003 Bilbao (Vizcaya)
Phone/Fax: (+34) 94 415 49 55
euskadi@geoconsult.es
o Local Office in Barcelona
C/Entença 332, 7º 2ª
BarcelonaPhone. (+34) 93 451 12 52
o Bogotá. Local Office in Colombia.
Carrera 13 # 29-19. Manzana 1. Oficina 302 y 303.Parque Central Bavaria. Bogotá (Colombia)Phone: (+571) 3467205
internacional@geoconsult.es
colombia@geoconsult.es
o Lima. Local office in Perú.
Av. del Pinar 124, of. 303 Santiago de Surco
Lima (Perú)
Phone: (+511) 3720413
peru@geoconsult.es
o Panamá City . Local office in Panamá
Avda. Balboa, Ph Bay Mall L-07,Pb.
Panama CityPhone. (+34) 93 451 12 52 catalunya@geoconsult.es
Panama City
Phone: (+507) 69 89 69 55
Panama@geoconsult.es
o Irvine. Local office in USA
2081 Business Center Dr. – Suite 195
Irvine, California 92612
Phone: (949) 500-4634
usa@incgroup.es
top related