Page 1 of 9
MCDR INSPECTION REPORT
General: File No.CHG/DNT/Fe-4/RPR30MPR02005
S.N. Particulars Details 1 Name of the Mine
Date of Inspection:
Name of Inspecting Officer
Bailadila Iron ore Deposit -05 ML
07/02/2019
Shri Rudra N Mishra (Senior Mining Geologist)
2 Total Lease Area (Ha) with breakup
of Non-forest and forest land
Forest Land: 540.05HA
Non-Forest Land: NIL
3 Mine code 30MPR02005
4 IBM Registration Number under rule
45 of MCDR,2017
IBM/270/2011
5 Name of the Lease, Address, Phone,
email and fax number
NMDC Ltd, Masab Tank, Hyderabad,
PIN-500028, Telangana.
pksatpathy@nmdc.co.in
Fax no: 040-27172569, Phone 040-23538713-
21,23538723 & 23538767
6 Village Bacheli
7 Taluka/Mandal Bade Bacheli
8 District Dantewada
9 Pin code 494553
10 State Chhattisgarh
11 Post Office Bacheli
12 Nearest Police Station Bacheli
13 Nearest Railway Station Bacheli
14 Date of Grant of Mining Lease 11.02.1965
15 Date of Execution 11.09.1965
16 Date of opening of Mine 27.01.1968
17 Date of First Renewal, if applicable
and its period & expiry
11/09/1995, Expiry-10/09/2015 for 20 years with
validity of ML Extended upto 31/03/2020
as per Rule 8A (6) of MMDR (Amendment) Act, 2015.
18 Date of Second Renewal, if
applicable and its period & expiry
Lease Executed from: 11.09.2015 to 31.03.2020 (As per
MMDR Amendment act 2015 section 8A).
19 Date of submission of renewal
application if Mining Operations are
continuing under deemed extension
Lease Executed from: 11.09.2015 to 31.03.2020.
20 Name of the Nominated Owner with
Address, phone, email, fax number
and date of appointment
Shri P.K. Satpathy, Director (Prodn.),
NMDC Ltd, Masab Tank,
Hyderabad, PIN-500028, Telangana.
pksatpathy@nmdc.co.in
Fax no: 040-27172569,
Phone No: 040- 23538701, 23538704.
DOA:13/12/2014
21 Name of the Mine Agent with
Address, phone, email, fax number
and date of appointment
Shri T.S. Cherian
BIOM, Bacheli complex,
Ph.no: 07857 230323
Page 2 of 9
e-mail: tscherian@nmdc.co.in
fax: 07857 - 230423
Date of appointment: 30.09.2018
22 Name of the Mine Manager with
Address, phone, email, fax number
and date of appointment in mines
Shri Sanjeev Sahi
BIOM, Bacheli complex,
Ph.no: 07857 230223
e-mail: ssahi@nmdc.co.in
fax: 07857 230423
Date of appointment: 18.12.2014
23 Name of the Mining Engineer,
Qualification and total experience
with address, phone, email, fax
number and date of appointment in
the mine
Shri C. Raja Lenin Babu
Qualification: M. Tech
Total experience:22 years
BIOM, Bacheli complex
Ph.no: 9425266318
e-mail: crlbabu@nmdc.co.in
Date of appointment: 08.07.2011
24 Whether Geologist and Mining
Engineer appointment in mines
satisfy the rule 42 & carrying out
their duties as per rule 43 & 44.
Appointed under Rule-55 and carrying out duties as per
rule 56 & 57 of MCDR-2017.
25 Date of Approval of Mine
Plan/Modified Mine Plan with five-
year period and specific condition in
approval letter, if any.
Vide Letter No: BST/FE/MPLN-198/NGP-15, Dated:
29.03.2016. pan period: 2015-16 to 2019-20.
26 Date of Approval of Scheme of
Mining/Modified Scheme of Mining
with five- year period and specific
condition in approval letter, if any.
NA
27 Mineral(s) granted in lease and
approved for Mining
Iron Ore (Hematite)
28 Method of Mining (Opencast,
Underground)
Opencast
29 Category (Fully Mechanized, Others
or Manual)
Fully Mechanised
30 Captive/Non-Captive Non-Captive mine
31 Environment clearance 10.0 Million Tonne
Exploration
S.N. Item Proposals (2017-
18)
Actual Work
(2017-18)
Remarks
1a Backlog of previous year 5433 mtrs 5451 mtrs Drilling cost
Rs.17891/m
(approximately) 1b Exploration over lease area for
Geological axis 1 or 2. 167 Ha 167 Ha
1c Exploration Agency &
Expenditure in Lakh Rupees
during the year
NMDC
Rs. 8.78 crores
NMDC
Rs. 9.75 crores
1d Balance area to be explored to
bring Geological axis in 1 or 2. 5 Ha 5 Ha
1e Balance reserves as on 01.04.18 253.08 MT
Page 3 of 9
1f General remarks of Inspecting
officer on geology, exploration
etc.
Biladila Deposit 05 is the southernmost in the western
ridge of the Bailadila Range. The ridge itself forms an
overturned syncline with ferruginous shale outcropping
on both sides of the iron formation and iron ore complex
occupying the core of syncline. The structure is however
complicated by cross folding. The regional N-S Strike
direction with steep easterly dips, swings a few degrees
away to both east and west wards. Based on topography
and configuration of the ore bodies, deposit 5 is basically
divided into four blocks viz., South Block, Central Block,
North west Block and North Block. South Block extends
upto the cross section 11, central and North west blocks
extends from cross section 11 to 21 and the part of
deposit between cross section 21 and 31 is known as
North Block.
BHQ is occurring as mother rock, usually parallel bands
along the strike direction. Iron ore is formed due to
enrichment of iron by leaching of silica from BHQ by
supergene enrichment occurring as a main ore type”
Hematite’’ in soft (as Blue Dust) and homogeneous,
massive and hard and compact steel grey and hard to
medium hard blue hematite form. Mineral deposit is
meta-sedimentary stratiform deposit.
Development
S.
N.
Item Proposals (2017-18) Actual Work
(2017-18)
Remarks
2a Location of Development w.r.t.
lease area
Bench MRL: S1008,
S1068, S1080, S1092,
S1104, C1128, C1140,
C1176 N1128
S1128, S1116,
S1104, S1092,
S1080, S1068,
S1008, C1152,
C1140
Top soil
not
available
2b Separate benches in topsoil
overburden and mineral (Rule 15)
Topsoil: NIL
OB: 9
Mineral: 9
Topsoil: NIL
OB: 9
Mineral: 9
2c Stripping ratio or ore to OB ratio 0.31 0.09
2d Quantity of topsoil generation in
m3 NIL NIL
2e Quantity of overburden generation
in m3 1111111 m3 291604
2f General remarks of Inspecting
officer on development of pit w.r.t
type of deposit etc.
Mining carried out by fully mechanized open cast bench
mining method with deployment of HEMM and in
conjunction with deep hole blasting. Production activity
is scheduled in three shifts in rotation Development is in
order.
Page 4 of 9
Exploitation
S.N
.
Item Proposals
(2017-18)
Actual Work
(2017-18)
Remarks
3a Number of pits proposed for
production 3 2
3b Quantity of ROM mineral
production proposed (2017-18) 90 LT 84.09 LT
3c Recovery of Salable/usable mineral
from ROM production 98% 97%
3d Quantity of mineral reject
generation 5.5 LT 0.58 LT
3e Grade of mineral reject generation
and threshold value declared
45 - 55 % Fe
Threshold value -
45% Fe
45 - 55 % Fe
Threshold
value - 45% Fe
3f Quantity of sub-grade mineral
generation 19.20 LT 18.76 LT
3g Grade of sub-grade mineral
generation Below 62% Below 62%
3h Manual/Mechanized method
adopted for segregation from ROM
Mechanized Mechanized
3i Any analysis or beneficiation study
proposed & carried out for sub-
grade mineral and reject
No study Proposed No study
Proposed
3j Provision of drilling & blasting in
mineral benches
As per Rule 106
MMR-1961, doing
drilling and blasting
Length*width*
Depth=
5m*5m*13m
3k Provision of mining machineries in
mineral benches
Yes Yes
3l Whether height of benches in
overburden and mineral suitable
for method of mining proposed in
MP/SOM
Bench Height:12Mtr
and Over Burden
Bench Height:
30Mtr
Bench
Height:12Mtr
and Over
Burden Bench
Height: 30Mtr
3m Total area covered under
excavation /pits 167 Ha 167 Ha
3n Ore to OB ratio for the pit/mine
during the year 0.31 0.09
3o Total area put in use under
different heads at the end of year 390.06 215.18
3p Production of ROM in Tones
mineral during last five-years
period, as Applicable
2013-14 8200000T 6830060T
2014-15 8200000T 6820670T
2015-16 8200000T 6489610T
2016-17 9000000T 7984700T
2017-18 9000000T 8408620T
3q General remarks of inspecting
officer on method of mining etc.
It’s a Mechanized opencast working by using heavy
earth moving machinery for drilling, excavation &
haulage.
Page 5 of 9
Solid Waste Management-Dumping
S.N. Item Proposals (2017-18) Actual Work
(2017-18)
Remarks
4a Separate dumping of
topsoil, OB & mineral
reject (Rule 32,33)
YES YES
4b Location of topsoil, OB &
mineral reject dumps
OB: Dump no.3 / SB /
Between CS8 and CS12,
Dump no.4 / CB /
between CS15 and CS19,
Dump no.5 / NB /
Between CS18 and CS31
& dump no.2 / SB /
between CS9 and CS15.
Mineral reject:
subgradestockpile1 /
between CS19 and CS22
& subgradestockpile2 /
between CS17 and CS19.
OB: Dump no.3 /
SB / Between CS8
and CS12 & dump
no.2 / SB / between
CS9 and CS15.
Mineral reject:
subgradestockpile1
/ between CS19 and
CS22 &
subgradestockpile2
/ between CS17 and
CS19.
4c Number of Dumps within
lease area and outside
lease area
4 within ML and NIL
outside ML
2 within ML and
NIL outside ML
4d Location of Dumps w.r.t.
ultimate pit limit (Rule
16)
Beyond ultimate pit limit Beyond ultimate pit
limit
4e Number of Active &
Alive dumps 04 02
4f Number of deed dumps 0 0
4g Number of dumps
established 04 02
4h Whether Retaining wall or
garland drain all along
dumps are there
YES YES
4i Length of Retaining wall
or garland drain all along
dump
250m 495m
4j Number of settling ponds NIL NIL
4k Specific commends of
inspecting officer on
waste dump management
There is no top soil encountered in this stage. Waste is
being dump at designated place as per approved documents.
Solid Waste Management-Backfilling
S.N. Item Proposals
(2017-18)
Actual Work
(2017-18)
Remarks
5a Status on part or full extraction of
mineral from mined out area
before starting backfilling
Back Filling not
proposed
Back Filling not
proposed
Mines
extension in
depth wise so
Page 6 of 9
5b Area under backfilling of mined
out area
Back Filling not
proposed
Back Filling not
proposed
there is
proposal for
backfilling at
this stage. 5c Concurrent use of topsoil for
restoration or rehabilitation of
mined out area (Rule 32)
Top soil storage
not proposed
Topsoil not
available
5d Total area fully reclaimed &
rehabilitated
Reclaimed &
Rehabilitated
not proposed
Reclaimed &
Rehabilitated
not available
5e General remarks of inspecting
officer on backfilling, reclamation
etc.
Mines extension in depth wise so there is proposal
for backfilling and area reclamation at this stage.
Progressive Mine Closer Plan
S.
N.
Item Proposals
(2017-18)
Actual
Work
(2017-18)
Remarks
6a Whether Annual report on PMCP
submitted on time and correctly-Rule
23E (2). Details should be given in the
format as given in Annexure-20
For 2017-18
PMCP
proposed
PMCP
compliance
report
submitted
Details of
Environmental
monitoring data
for air, water,
noise &
vibration
during summer
and Monsoon
for the year
2018
submitted.
6b Management of worked/mined out
benches
Not proposed
within
Mining Lease
All along the
Safety Zone
2000
plantation
Area available for rehabilitation (Ha)
Afforestation done (ha)
No. of saplings planted during the year
Cumulative no. of plants
Any other specific method of
rehabilitation
Cost incurred on watch & care during
the year
6c Compliance on reclamation and
rehabilitation by backfilling
i) Voids available for backfilling
(L*B*D)
ii) Void filled by waste/tailings
iii) Afforestation on the backfilling
iv) Rehabilitation by making water
reservoir
v) Any other specific means
As per PMCP
PMCP report
submitted
6d Compliance of Rehabilitation of waste
land within lease
i) Afforestation
ii) Area rehabilitation
iii) Method of rehabilitation
Nil Nil
Page 7 of 9
6e Compliance of Environment
monitoring (core zone & buffer zone)
Proposed Being done
6f General remarks of inspecting officer
on PMCP compliance & progressive
closer operations
PMCP proposal are implemented
Mineral Conservation
S.N. Item Proposals
(2017-18)
Actual Work
(2017-18)
Remarks
7a ROM mineral dispatch or grade
wise sorting within lease area
Subgrade mineral
to be blended
simultaneously with
high grade mineral
during feeding to
the crushing plant
Subgrade
mineral blended
simultaneously
with high grade
mineral during
feeding to the
crushing plant
7b Method of grade-wise mineral
sorting i.e. manual or
mechanical
Mechanical Mechanical
7c Different grade of mineral sort
out at mine
Below 55 Fe%,
55 to 58 Fe%,
58 to 60 Fe%,
60 to 62 Fe%,
62 to 65 Fe%
65%and Above
Below 55 Fe%,
55 to 58 Fe%,
58 to 60 Fe%,
60 to 62 Fe%,
62 to 65 Fe%
65%and Above
7d Any beneficiation process at
mines
Crushing and
Screening
plan Crushing
and Screening
7e General remarks of inspecting
officer on Mineral conservation
& beneficiation issues
Crushing is being done to sizing of ore and separate
clayey-soil & silica.
Environment
S.N. Item Proposals
(2017-18)
Actual Work
(2017-18)
Remarks
8a Separate removal and utilization of
topsoil (Rule32)
Not in
proposal
Top soil not
available
Mines
extension in
depth wise.
CGRVVN is
the executing
agency for the
plantation work
of NMDC,
BIOM, Bacheli
Complex
8b Concurrent use or storage of topsoil Top soil not
available
Top soil not
available
8c Separate dumps for overburden
waste rock, rejects and fines (Rule
33)
OB dump
proposed
As per
Proposed waste
dump available
8d Use of overburden, waste rock,
rejects and fines dump for restoring
the land to its original use
Not
Proposed
NA
8e Phased restoration, reclamation and
rehabilitation of lands affected by
mining operations (Pits, dumps etc.)
Not
proposed as
no voids
available for
R&R
NA
Page 8 of 9
8f Baseline information on existence of
plantation & additional plantation
done (Rule 41)
Not
proposed
Lease Safety
zone area.
8g Survival rate 100 % 77.5%
8h Water sprinkling on roads to control
airborne dust
As per
proposal
Water
sprinkling is
done on road to
control the air
borne dust, Wet
Drilling, Water
mist sprat at
crusher.
8i General remarks of inspecting
officer on aesthetic beauty in and
around mine area
EMP parameters are regularly being monitored.
Well-developed thick plantation within and
outside the lease area. Due to plantation around
the mining area aesthetic beauty increased.
Compliance of Rule 45
S.
N.
Item Comments Remarks
9a Status of submission of monthly
and Annual returns
Feb_19 Monthly Return submitted
2017-18 Annual Return Submitted
9b Scrutiny of Annual return for
information on Mining Engineer,
Geologist and Manager
Mining Engineer: Shri C. Raja Lenin
Babu
Geologist: Dr D. Mandal
Mines Manager: Shri Sanjeev Sahi
9c Scrutiny of Annual return on
land use pattern for area under
pits, reclaimed area, dumps etc.
Area Under Pit: 167.00 Ha
Reclaimed area: 2.30ha
Use for waste disposal: 20.10Ha
Occupied by plant, building residential,
welfare building and roads: 27.60ha
Other purpose (Mineral
Storage):32.68ha
9d Scrutiny of Annual return on
afforestation
2000 number of saplings and survival
rate: 90%
9e Scrutiny of Annual return on
mineral reject generation (Grade
& Quantity)
58300Tonne
9f Scrutiny of Annual return on
ROM stock and/or grade ore
Opening Stock: 290548.00T
Production: 8408620.00T,
Closing Stock: 344154.00T
9g Scrutiny of Annual return on
sale value, Ex. Mine price &
production costs
Rs. 3788.00 per tone ex-mine price
(above 65%) for Lumps.
Rs. 2747.32 per tone for Fines (above
65%).
Cost of production: Rs 1155.84
Violation
pointed out
DMF &
NMET not
included in
the cost of
production.
Page 9 of 9
9i Scrutiny of Annual return on
Fixed assets
Value of Fixed Assets: Rs (in ₹) 435.94Cr
9k Scrutiny of Annual return on
mining Machineries
Type of
machinery
Capacity of
each unit
No. of
machinery
Blast Hole Drill
(Elec.)
250.000 MM 3
Blast Host Drill 102.00 MM 2
Blast Host Drill 165.00 MM 1
Shovel
(Mechanical)
8.000 CUM 5
Shovel (Hydraulic) 8.800 CUM 1
Dumper 100.000 TONNE 4
Dumper 85.000 TONNE 9
Water Tanker 28000.000 LITRE 3
Water Tanker 30000.000 LITRE 1
Dozer 416.000 HP 4
Dozer 2500.000 HP 6
Dozer 850.000 HP 1
Motor Grader 280.000 HP 2
Front End Loader 8.000 CUM 1
Air Compressor 450.000 CUM/MN 3
Details of Violations observed during current Mining Plan inspection: -
नियम उल्लघंि के प्रकार का ब्यौरा 11 (1) Mining Operation are not being carried out in accordance with the Mining plan
approved vide No BST/FE/MPLN-198/NGP-15 dated 29/03/2016 to the extent below:
i) As per approved Mining Plan, 23 Exploratory Pits with Dimensions (4m x 2m x 2m)
were proposed during the year 2017-18, but these Pits have not been done so far.
45(7) On scrutiny of annual return of mine it is noticed that DMF and NMET contribution is
not included in the cost of production of Iron ore per tonne. Needs to be rectified.
Last Inspection Details: Shri S. Kartikeya (JMG) held on dated 19/07/2017. Violations
pointed out during last inspections have been complied.
Date: 27/3/2019 Name: Shri Rudra. N Mishra
Designation: Senior Mining Geologist
top related