general list of documents - gpgc overview doc. no. 1ccg50959 rev. ind. - list of documents techn....
Post on 27-Mar-2018
222 Views
Preview:
TRANSCRIPT
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
1 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Based on M:\kunddok\admin\cti_kund.mdb - B690/As Build 050912 Author Lena Lindman Product 140 MW CCPP Appr. Ref. des. Doc. Kind List of documents Doc. des Language En
B690& AB102
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
General list of documents
Part Pos./Des. Document title Doc.Id
1A 0101 Introduction/Revision Routine 1A0101en-1
1A 0201 General Safety 1A0201en-2
1A 0301 Plant Documentation Layout 1A0301en-3
1A 0401 KKS Designation system 1A0401en-2
1A 0501 Symbol list B690-1A0501en-1
1A 0502 P&I Legends of symbols 501068
1A 0503 P&I Legends of symbols 2036835
1A 0504 P&I Legends of symbols 2038146
1A 0505 P&I Legends of symbols 2038147
1A 0506 P&I Legends of symbols 2036899
1A 0507 P&I Legends of symbols 501068
1A 0601 List of Documents BoP B690 1CCG50959
1A 0701 Total equipment list BoP B690 1CCG50146
1A 0702 Total equipment list GT11 B912 1CCG50147
1A 0703 Total equipment list GT13 B901 1CCG50148
1A 0704 Total equipment list GT22 B900 1CCG50149
1A 0705 Total equipment list GT24 B903 1CCG50150
1A 0706 Total equipment list ST10 B2520 1CCG50151
1A 0707 Total equipment list ST20 B2521 1CCG50152
1A 0801 How to search in Component Documentation 1CCG50114
2A1 0101 General B690-2A0101
2A1 0201 Operating Safety B690-2A0201
2A1 0301 Main Flow Diagram 501097
2A1 0401 Plant Operation Instruction 503240
2A1 0402 HRSG Steam and Feed Water Control 2451355
2A1 0501 Water Balance 501596
2A4 0101 Operating Introduction 2A30101en-1
2A4 0201 Operating Safety 1CCG50293
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
2 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
2A4 0301 System Operation Instruction - EG, External Liquid Fuel Oil System
503 217
2A4 0302 System Operation Instruction - G, Water Treatment System
503 213
2A4 0303 System Operation Instruction - GA, Raw Water System
503 223
2A4 0304 System Operation Instruction - LBA, Main Steam System
503 219
2A4 0305 System Operation Instruction - LCA, Condensate System
503 218
2A4 0306 System Operation Instruction - MAG, Condenser System
503 221
2A4 0307 System Operation Instruction - MAJ, Condenser Evacuation System
503 222
2A4 0308 System Operation Instruction - MAL, Drain System 503 220
2A4 0309 System Operation Instruction - PA, Main Cooling Water System
503 214
2A4 0310 System Operation Instruction - PG, Closed Cooling Water System
503 215
2A4 0311 System Operation Instruction - Q, Compressed Air System
503 216
2A4 0312 System Operation Instruction - Fire System 504 025
2A4 0401 Base Position List 501 914
2A5 0101 0.4 kV System Operation Instruction 2450362
2A5 0201 6kV BBC System Operation Instruction 2450361
2A5 0301 11 kV BBA System Operation Instruction 2450360
2A5 0401 10BRU 20BRU UPS System Operating Instruction 2414923
2A5 0501 10BUB 20BUB Battery System Operating Instruction 2414995
2A5 0601 Emergency Diesel Generator 11Brv10 22BRV10 2414997
2A6 0101 Operating Instruction Central Control Room 2A10404en
2A6 0201 Plant Protection System 2450013
2A6 0301 Man-Machine Communication (MMC) Description 1CCG50692
2B4 0101 System Description - EG, External Liquid Fuel Oil System
501 074
2B4 0201 System Description - G, Water Treatment System 501 057
2B4 0301 System Description - GA, Raw Water System 501 593
2B4 0401 System Description - LBA, Main Steam System 501 077
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
3 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
2B4 0501 System Description - LCA, Condensate System 501 076
2B4 0601 System Description - MAG, Condenser System 501 082
2B4 0701 System Description - MAJ, Condenser Evacuation System
501 083
2B4 0801 System Description - MAL, Drain System 501 078
2B4 0901 System Description - PA, Main and Auxiliary Cooling Water System
501 058
2B4 1001 System Description - PG, Closed Cooling Water System
501 059
2B4 1101 System Description - Q, Compressed Air System 501 060
2B4 1201 System Description - HRSG 99.24022
2B4 1301 System Description - Fire Protection System 503 878
2B4 1401 System Description - Distributed Control System 2414 963
2B4 1501 System Description - Data Storage System 2451 179
2B4 1601 System Description - GQA, Waste/Sewage/Rain Water System
502 196
2B5 0101 B Plant Electrical System 2450359
2B5 0201 BA/BB 11kV Electrical System 2414986
2B5 0301 11BAT10 Generator Block Transformer 2450160
2B5 0401 13BAT10 Generator Block Transformer 2450162
2B5 0501 22BAT10 Generator Block Transformer 2450161
2B5 0601 24BAT10 Generator Block Transformer 2450163
2B5 0701 BBC 6kV Electrical System 2414996
2B5 0801 400 V System 2450221
2B5 0901 10BUB 20BUB Battery System 2450224
2B5 1001 10BRU 20BRU UPS System 2450222
2B5 1101 11BRV 22BRV Emergency Diesel Generator 2450223
2C4 0101 P&ID EG External liquid fuel oil system 501061
2C4 0201 P&ID GA Raw water system 501590
2C4 0301 P&ID GC Water treatment system 501062
2C4 0401 P&ID GQA Sewage / Waste water system 502193
2C4 0501 P&ID HAC, HAD, HAH & HAD 11 Boiler drain system
501736
2C4 0601 P&ID HAC, HAD, HAH & HAD 13 Boiler drain system
503514
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
4 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
2C4 0701 P&ID HAC, HAD, HAH & HAD 22 Boiler drain system
503515
2C4 0801 P&ID HAC, HAD, HAH & HAD 24 Boiler drain system
503516
2C4 0901 P&ID HAC, HAD, HNA, LAB & LFN 11 LP Boiler system
501734
2C4 1001 P&ID HAC, HAD, HNA, LAB & LFN 13 LP Boiler system
503517
2C4 1101 P&ID HAC, HAD, HNA, LAB & LFN 22 LP Boiler system
503518
2C4 1201 P&ID HAC, HAD, HNA, LAB & LFN 24 LP Boiler system
503519
2C4 1301 P&ID HAC, HAD, LAB & LFN 11 HP Boiler system
501735
2C4 1401 P&ID HAC, HAD, LAB & LFN 13 HP Boiler system
503520
2C4 1501 P&ID HAC, HAD, LAB & LFN 22 HP Boiler system
503521
2C4 1601 P&ID HAC, HAD, LAB & LFN 24 HP Boiler system
503522
2C4 1701 P&ID LAA, LAB & LAC 10 Feed water system 501737
2C4 1801 P&ID LAA, LAB & LAC 20 Feed water system 503523
2C4 1901 P&ID LBA Main steam system 501064
2C4 2001 P&ID LCA Condensate system 501065
2C4 2101 P&ID MAG Condenser system 501087
2C4 2201 P&ID MAJ Condenser Evacuation System 501088
2C4 2301 P&ID MAL Atmospheric Drain System 501069
2C4 2401 P&ID MBV Mobile Lube Oil Filter Unit 503798
2C4 2501 P&ID MK Generator System 501880
2C4 2601 P&ID MK 24 Generator System 501881
2C4 2701 P&ID PA Main Cooling Water System 501066
2C4 2801 P&ID PG Closed Cooling Water System 501063
2C4 2901 P&ID QE & QF Compressed Air System. 501067
2C4 3001 P&ID QEC 10 Boiler Instrument Air 501742
2C4 3101 P&ID QEC 20 Boiler Instrument Air 503524
2C4 3201 P&ID QU Boiler Sampling System 501463
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
5 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
2C4 3301 P&ID SGA, SGE & SGF Sprinkler & Fire Water System
501246
2D4 0101 Valve List 501473
2D4 0201 Aggregate List 501053
2D4 0301 Pipe List 501054
2D4 0401 Instrument / Setting List 3820783
2D4 0501 Electrical Load List 2450443
3A4 0101 Maintenance Introduction 3A40101en-1
3A4 0201 Maintenance Safety 1CCG50294
3A4 0301 EG External Liquid Fuel Oil System 503230
3A4 0302 GA Raw Water System 503236
3A4 0303 GC Water Treatment System 503226
3A4 0304 LBA Main Steam System 503232
3A4 0305 LCA Condensate System 503231
3A4 0306 MAG Condenser System 503234
3A4 0307 MAJ Condenser Evacuation System 503235
3A4 0308 MAL Drain System 503233
3A4 0309 PA Main Cooling System 503227
3A4 0310 PG Closed Cooling Water System 503228
3A4 0311 QE QF Compressed Air System 503229
3A4 0312 SG Fire Protection System 503879
3A4 0313 HAC, HAD, HNA, LAB, LFN; Boiler System 503237
3A5 0101 Protection Relay Setting list 2451501-515
3A5 0201 Cable Data Sheet -
3A6 0101 Maintenance of Control System 1CCG50693
3C1 0101 Circuit Diagram Block 00 2450010
3C1 0102 Circuit Diagram Block 10 2450039
3C1 0103 Circuit Diagram Block 11 2450199
3C1 0104 Circuit Diagram Block 13 2450200
3C1 0105 Circuit Diagram Block 20 2450040
3C1 0106 Circuit Diagram Block 22 2450219
3C1 0107 Circuit Diagram Block 24 2450220
3C1 0201 Single line diagram overall 2414925
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
6 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3C1 0202 Single line diagram 11kV 2450233
3C1 0203 Single line diagram 6kV 2450183
3C1 0204 Single line diagram 400V 11BFA 2450016
3C1 0205 Single line diagram 400V 13BFA 2450429
3C1 0206 Single line diagram 400V 22BFA 2450434
3C1 0207 Single line diagram 400V 24BFA 2450439
3C1 0208 Single line diagram 400V 00BFF 2450019
3C1 0209 Single line diagram 400V 10BFF 2450496
3C1 0210 Single line diagram 400V 20BFF 2450501
3C1 0211 Single line diagram 400V 00BFG 2450021
3C1 0212 Single line diagram 400V 10BFH 2450608
3C1 0213 Single line diagram 400V 20BFH 2450613
3C1 0301 Cable list 2450232
3C1 0501 Low voltage switchgear 11BFA Wiring table 2450427
3C1 0502 Low voltage switchgear 13BFA Wiring table 2450432
3C1 0503 Low voltage switchgear 22BFA Wiring table 2450437
3C1 0504 Low voltage switchgear 24BFA Wiring table 2450442
3C1 0505 Low voltage switchgear 00BFF Wiring table 2450419
3C1 0506 Low voltage switchgear 10BFF Wiring table 2450499
3C1 0507 Low voltage switchgear 20BFF Wiring table 2450504
3C1 0508 Low voltage switchgear 00BFG Wiring table 2450423
3C1 0509 Low voltage switchgear 10BFH Wiring table 2450611
3C1 0510 Low voltage switchgear 20BFH Wiring table 2450616
3C1 0601 Low voltage switchgear 11BFA List of apparatus 2450425
3C1 0602 Low voltage switchgear 13BFA List of apparatus 2450430
3C1 0603 Low voltage switchgear 22BFA List of apparatus 2450435
3C1 0604 Low voltage switchgear 24BFA List of apparatus 2450440
3C1 0605 Low voltage switchgear 00BFF List of apparatus 2450417
3C1 0606 Low voltage switchgear 10BFF List of apparatus 2450497
3C1 0607 Low voltage switchgear 20BFF List of apparatus 2450502
3C1 0608 Low voltage switchgear 00BFG List of apparatus 2450421
3C1 0609 Low voltage switchgear 10BFH List of apparatus 2450609
3C1 0610 Low voltage switchgear 20BFH List of apparatus 2450614
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
7 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3C1 0611 Control cubicle 20CAA List of apparatus 2450624
3C1 0612 Control cubicle 10CAA List of apparatus 2450507
3C1 0613 Control cubicle 11CKP01 List of apparatus 2450047
3C1 0614 Control cubicle 11CKP02 List of apparatus 2450242
3C1 0615 Control cubicle 22CKP01 List of apparatus 2450149
3C1 0616 Control cubicle 22CKP02 List of apparatus 2450251
3C1 0617 Control cubicle 13CKP01 List of apparatus 2450246
3C1 0618 Control cubicle 13CKP02 List of apparatus 2450247
3C1 0619 Control cubicle 24CKP01 List of apparatus 2450255
3C1 0620 Control cubicle 24CKP02 List of apparatus 2450256
3C1 0621 Control cubicle 10CKN01 List of apparatus 2450041
3C1 0622 Control cubicle 10CKN02 List of apparatus 2450042
3C1 0623 Control cubicle 10CKN03 List of apparatus 2450043
3C1 0624 Control cubicle 10CKN04 List of apparatus 2450044
3C1 0625 Control cubicle 10CKN05 List of apparatus 2450045
3C1 0626 Control cubicle 10CKN06 List of apparatus 2450046
3C1 0627 Control cubicle 10CKP01 List of apparatus 2450048
3C1 0628 Control cubicle 10CKP02 List of apparatus 2450049
3C1 0629 Control cubicle 10CKN08 List of apparatus 2450197
3C1 0630 Control cubicle 10CKN09 List of apparatus 2450198
3C1 0631 Control cubicle 20CKN01 List of apparatus 2450143
3C1 0632 Control cubicle 20CKN02 List of apparatus 2450144
3C1 0633 Control cubicle 20CKN03 List of apparatus 2450145
3C1 0634 Control cubicle 20CKN04 List of apparatus 2450146
3C1 0635 Control cubicle 20CKN05 List of apparatus 2450147
3C1 0636 Control cubicle 20CKN06 List of apparatus 2450148
3C1 0637 Control cubicle 20CKN08 List of apparatus 2450237
3C1 0638 Control cubicle 20CKN09 List of apparatus 2450238
3C1 0639 Control cubicle 20CKP01 List of apparatus 2450150
3C1 0640 Control cubicle 20CKP02 List of apparatus 2450151
3C1 0641 Control cubicle 11BAY List of apparatus 2450482
3C1 0642 Control cubicle 13BAY List of apparatus 2450483
3C1 0643 Control cubicle 22BAY 2450484
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
8 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3C1 0644 Control cubicle 24BAY01 2450485
3C1 0701 Interlock diagram 11kV 2450356
3C1 0702 Interlock diagram 6kV system 2450357
3C1 0703 Interlock diagram 0.4kV system 2450358
3C1 0704 Protective interlock description 2450166
3C1 0801 Electrical & Control building MV switchgear Layout Block1
2450260
3C1 0802 Electrical & Control building MV switchgear Block2 2450261
3C1 0803 Electrical & Control building Balance of plant Control equipment
2450342
3C1 0804 Electrical & Control building LV switchgear 2450025
3C1 0805 Electrical & Control building Battery room 2450262
3C1 0806 Electrical & Control building Central control room 2450028
3C1 0807 Control room Seawater pump station 2450027
3C1 0808 Local control room 00 Switchgear 2450026
3C1 0809 Local Control room Steam turbine 2450263
3C1 0810 Local control room HRSG 2450265
3C1 0811 Low voltage switchgear 11BFA Flyleaf 2450424
3C1 0812 Low voltage switchgear 13BFA Flyleaf 2450428
3C1 0813 Low voltage switchgear 22BFA Flyleaf 2450433
3C1 0814 Low voltage switchgear 24BFA Flyleaf 2450438
3C1 0815 Low voltage switchgear 00BFF Flyleaf 2450416
3C1 0816 Low voltage switchgear 10BFF Flyleaf 2450495
3C1 0817 Low voltage switchgear 20BFF Flyleaf 2450500
3C1 0818 Low voltage switchgear 00BFG Flyleaf 2450420
3C1 0819 Low voltage switchgear 10BFH 2450617
3C1 0820 Low voltage switchgear 20BFH Flyleaf 2450612
3C1 0821 Control cubicle 10CAA 2450512
3C1 0823 Control cubicle 11CK 2450240
3C1 0824 Control cubicle 22CK 2450510
3C1 0825 Control cubicle 24CK 2450253
3C1 0826 Control cubicle 10CK 2450007
3C1 0827 Control cubicle 20CK 2450142
3C1 0828 Relay and signal converter cubicle 11BAY01 2450355
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
9 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3C1 0829 Relay and signal converter cubicle 13BAY01 2450479
3C1 0830 Relay and signal converter cubicle 22BAY01 2450480
3C1 0831 relay and signal converter cubicle 24BAY01 2450481
3C1 0832 Control cubicle 13CK 2450244
3C1 0833 Cable ladders electrical layout 501755
3C1 0834 Cable pipes in ground 501823
3C1 0901 Cable fill drawing 2450078
3C1 0902 Installation drawing connection to motor principal 2450017
3C1 0903 Wire Cable Support system, Cable ladders 2450343
3C1 0904 HV Busbar PLS 9179k017-050
3C1 0905 Protective interlock safety cubicle 10CAA 2450512
3C1 1001 Low voltage switchgear 11BFA 2450426
3C1 1002 Low voltage switchgear 13BFA 2450431
3C1 1003 Low voltage Switchgear 22BFA 2450436
3C1 1004 Low voltage switchgear 24BFA 2450441
3C1 1005 Low voltage switchgear 00BFF 2450418
3C1 1006 Low voltage switchgear 10BFF 2450498
3C1 1007 Low voltage switchgear 20BFF 2450503
3C1 1008 Low voltage switchgear 00BFG 2450422
3C1 1009 Low voltage switchgear 10BFH 2450610
3C1 1010 Low voltage switchgear 20BFH 2450615
3C1 1011 Control cubicle 10CAA 2450505
3C1 1012 Control cubicle 20CAA 2450506
3C1 1013 Control cubicle 11CK 2450241
3C1 1014 Control cubicle 22CK 2450250
3C1 1015 Control cubicle 13CK 2450245
3C1 1016 Control cubicle 24CK 2450254
3C1 1017 Control cubicle 10CK 2450015
3C1 1018 Control cubicle 20CK 2450159
3C1 1019 Connection table 2450014
3C1 1101 Short circuit calculation normal 2414924
3C1 1102 Short circuit calculation maximum 2450084
3C1 1103 Short circuit calculation minimum 2450085
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
10 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3C1 1104 Load flow calculation 2450080
3C1 1105 Motor starting calculation 2450086
3C1 1106 Cable calculation 2450182
3C1 1107 Protective device coordination no:1 2450087
3C1 1108 Protective device coordination no:2 2450088
3C1 1109 Protective device coordination no:3 2450089
3C1 1110 Protective device coordination no:4 2450180
3C1 1111 Protective device coordination no.5 2450181
3C1 1112 Short circuit calculation GT Low voltage switchgear 2450184
3C1 1113 GT Performance study 2450189
3C1 1114 UPS Sizing calculation 2450186
3C1 1115 Single failure analysis switchgear 2450365
3C1 1116 Cable information (data sheets) -
3C1 1201 List of documents 3C-1-E 2451277
3D1 0101 List of Documents 2451205
3D1 0201 DCS General Configuration Overview 2450029
3D1 0301 System Description DCS 2414963
3D1 0401 PC1 Plant Overall Control & Sequence 2450098-1
3D1 0402 PC Diagram PC1 2450098-1
3D1 0501 PC2 Electrical Systems Unit 11&13 2450098-2
3D1 0502 PC Diagram PC2 2450098-2
3D1 0601 PC3 Plant Common Systems 2450098-3
3D1 0602 PC Diagram PC3 2450098-3
3D1 0701 PC4 Balance of Plant 2450098-4
3D1 0702 PC Diagram PC4 2450098-4
3D1 0801 PC5 Block Overall Control & Sequence 2450098-5
3D1 0802 PC Diagram PC5 2450098-5
3D1 0901 PC6 HRSG & Boiler System Unit 11 2450098-6
3D1 0902 PC Diagram PC6 2450098-6
3D1 1001 PC7 Superior Control GT10 & HRSG Unit 11 2450098-7
3D1 1002 PC Diagram PC7 2450098-7
3D1 1101 PC8 HRSG & Boiler System Unit 13 2450098-8
3D1 1102 PC Diagram PC8 2450098-8
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
11 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3D1 1201 PC9 Superior Control GT10 & HRSG Unit 13 2450098-9
3D1 1202 PC Diagram PC9 2450098-9
3D1 1301 PC1 Plant Overall Control & Sequence 2450100-1
3D1 1302 PC Diagram PC1 2450100-1
3D1 1401 PC2 Electrical Systems Unit 22 & 24 2450100-2
3D1 1402 PC Diagram PC2 2450100-2
3D1 1501 PC3 Plant Common Systems 2450100-3
3D1 1502 PC Diagram PC3 2450100-3
3D1 1601 PC4 Balance of Plant 2450100-4
3D1 1602 PC Diagram PC4 2450100-4
3D1 1701 PC5 Block Overall Control & Sequence 2450100-5
3D1 1702 PC Diagram PC5 2450100-5
3D1 1801 PC6 HRSG & Boiler System Unit 22 2450100-6
3D1 1802 PC Diagram PC6 2450100-6
3D1 1901 PC7 Superior Control GT10 & HRSG Unit 22 2450100-7
3D1 1902 PC Diagram PC7 2450100-7
3D1 2001 PC8 HRSG & Boiler System Unit 24 2450100-8
3D1 2002 PC Diagram PC8 2450100-8
3D1 2101 PC9 Superior Control GT10 & HRSG Unit 24 2450100-9
3D1 2102 PC Diagram PC9 2450100-9
3D1 2201 Data Base Long List Node10 2450099
3D1 2301 Data Base Short List Sorted by KKS 2450099
3D1 2401 Data Base Cross Reference List 2450099
3D1 2501 Alarm List Node10 2450099
3D1 2601 Trip List Node10 2450099
3D1 2701 Data Base Long List Node20 2450101
3D1 2801 Data Base Short List Sorted by KKS 2450101
3D1 2901 Data Base Cross Reference List 2450101
3D1 3001 Alarm List Node20 2450101
3D1 3101 Trip List Node20 2450101
3D1 3201 Plant Control Description 2414978
3D1 3301 Plant Sequence Description 2414979
3D1 3401 Block Sequence Description 2414980
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
12 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3D1 3501 Unit Sequence Description 2414981
3D1 3601 Plant Protection System 2450166
3D1 3701 Type Circuits Description Advant version 3820274
3D1 3801 Protective Interlock Description 2450166
3D1 3901 Hookup & instrument specification 3820784
3E1 0101 Balance of Plant Pipe System Overview 502510
3E1 0102 Isometric picture External liquid fuel EGA 501532
3E1 0103 External Liquid Fuel EG Isometric 501520
3E1 010401 External liquid fuel EG Diesel fuel storage area 1-6 501520CS
3E1 010402 External liquid fuel EG Impounding north wall support // See: 3E1010401 //
501520NWS
3E1 010403 External liquid fuel EG Piperack supports - details // See: 3E1010401 //
501520PRS
3E1 010404 External liquid fuel EG Fuel unloading trench supports // See: 3E1010401 //
501520TRS
3E1 010405 External liquid fuel EG Impounding wall west side support // See: 3E1010401 //
501520WW
3E1 0105 External liquid fuel Small bore pipes (EG) 502553
3E1 0201 Isometric picture Water treatment GCB, GHC, GKB 501533
3E1 0202 Water treatment GC 501521
3E1 0203 Glass reinforced polyester lines Details MGRP-001
3E1 0204 Water treatment Pipe supports GC GC-SUP
3E1 0205 Water treatment system Small bore pipes (GHC) 502554
3E1 0301 Isometric picture Main steam system LBA 501542
3E1 0302 Main steam system LBA 501522
3E1 0303 Main steam system Small bore pipes (LBA) 502555
3E1 0304 Main steam system LBA 502701
3E1 0305 Main steam system LBA Support drawings LBA-SUP
3E1 0401 Isometric picture Condensate system LCA 501534
3E1 0402 Condensate system LCA 501523
3E1 0403 Condensate system Small bore pipes (LCA) 502556
3E1 0404 Condensate system LCA Support drawings LCA-sup
3E1 0501 Isometric picture Condenser system MAG 501535
3E1 0502 Condenser system MAG 501524
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
13 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3E1 0503 Condenser system Small bore pipes (MAG) 502557
3E1 0504 Condenser system MAG Support drawings MAG-SUP
3E1 0601 Isometric picture Condenser evacuation system MAJ 501541
3E1 0602 Condenser evacuation system MAJ 501530
3E1 0603 Condenser evacuation system Small bore pipes (MAJ)
502562
3E1 0604 Condenser evacuation system MAJ Support drawings MAJ-SUP
3E1 0701 Isometric picture Drain system MAL 501536
3E1 0702 Drain system MAL 501525
3E1 0703 Drain system Small bore valves (MAL) 502558
3E1 0704 Drain system MAL Support drawings MAL-SUP
3E1 0801 Isometric picture Main cooling water PAC 501538
3E1 080201 Main cooling water PAC - isometrics 501527
3E1 080202 Main cooling water PAC - mech drawings // See: 3E1080201 //
MGRP
3E1 080203 Main cooling water PAC - mech drawings // See: 3E1080201 //
M501527
3E1 0803 Main cooling water Small bore pipes (PA) 502559
3E1 080401 Main cooling water PA - isometrics 501527
3E1 080402 Main cooling water PA - mech drawings // See: 3E1080401 //
MGRP
3E1 080403 Main cooling water PA - improvements isometrics // See: 3E1080401 //
IK501380
3E1 080404 Main cooling water PA - improvements isometrics // See: 3E1080401 //
N501527
3E1 0805 Main cooling water PA, PAC - Support drawings PA-SUP
3E1 090101 Raw water pipe and return pipes 00GAA50BR001, 00GAA71/72/73BR001
502156
3E1 090102 Raw water system GA 504092
3E1 1001 Isometric picture Closed cooling water PG 501539
3E1 1002 Closed cooling water PG - isometrics 501528
3E1 1003 Closed cooling water Small bore pipes (PG) 502560
3E1 100401 Closed cooling water PG - Support drawings PG-SUP
3E1 100402 Closed cooling water PG - Support drawings // See: 3E1100401 //
SC
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
14 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3E1 100403 Closed cooling water PG - Support drawings // See: 3E1100401 //
SH
3E1 100404 Closed cooling water PG - Support drawings // See: 3E1100401 //
55P00
3E1 1101 Isometric picture Compressed air QE, QF 501540
3E1 1102 Compressed air system QE, QF 501529
3E1 1103 Compressed air system Small bore pipes (QE, QF) 502561
3E1 1104 Compressed air system QE, QF Support drawings QE-SUP
3E1 1105 Connection of air to air connection 503300
3E1 1201 Isometric picture Fire protection SG 501537
3E1 1202 Fire protection foam SGF - Isometrics 501526
3E1 1203 Fire protection foam SGF - Support drawings SGA-SUP
3E1 1204 Fire water SGA - Isometrics 501526
3E1 1205 Fire water SGA - Support drawings SGA-SUP
3E1 1301 Unit 11 - isometrics 20381
3E1 1302 Layout of external piping Unit 11 2038195
3E1 1401 Unit 22 - isometrics 20396
3E1 1402 Layout of external piping Unit 22 2039645
3E1 1501 Unit 13 - isometrics 20391
3E1 1502 Layout of external piping Unit 13 2039658
3E1 1503 Cooling water system PGA Unit 13 - Support drawings
PGA-SUP
3E1 1601 Unit 24 - isometrics 20396
3E1 1602 Layout of external piping Unit 24 2039657
3E1 1603 Cooling water system PGA Unit 24 - Support drawings
PGA-SUP
3E1 1701 ST 13 - isometrics 1CSD33638
3E1 1702 ST 13 - supports drawings, lube oil system LUBO-SUP
3E1 1703 ST 13 - supports drawings, gland steam pipes // See: 3E11702 //
GL-sup
3E1 1801 ST 24 - isometrics 1CSD33725
3E1 1802 ST 24 - supports drawings, lube oil system LUBO-SUP
3E1 1803 ST 24 - supports drawings, gland steam pipes // See: 3E11802 //
GL-sup
3E1I 0101 Fuel storage Equipment installation 501485
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
15 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3E1I 0102 Fuel unloading station General arrangement 501928
3E1I 0103 Comp.arr.dwg EG-separator pump unit 502171
3E1I 0104 Comp.arr.dwg EG-separator unit 502172
3E1I 0105 Comp.arr.dwg EG-fuel unload 1 502173
3E1I 0106 Comp.arr.dwg EG-fuel unload 2 502174
3E1I 0107 Comp.arr.dwg EG flow measure unit 502175
3E1I 0108 Comp.arr.dwg EG fuel sludge equipment 502176
3E1I 0109 Comp.arr.dwg EG fuel coalesher unit 502177
3E1I 0110 Comp.arr.dwg EG fuel heater unit 502178
3E1I 0201 Overland pipes on site 501912
3E1I 0202 Raw water pipe and return pipes 00GAA 502156
3E1I 0203 Comp.arr.dwg. GA return pumps 502188
3E1I 0204 Cooling water declorination installation 503873
3E1I 0301 Water treatment equipment installation 501543
3E1I 0302 Comp.arr.dwg. Demi water pumps 502179
3E1I 0401 Condenser and drain pit layout level -5.300 501 926
3E1I 0402 Comp.arr.dwg. Condensate pumps unit 13 and 24 502180
3E1I 0501 Comp.arr.dwg. Steam ejector units 10/20MAJ10AC005
502181
3E1I 0502 Comp.arr.dwg. Vacuum pump units 10/20MAL10AP001
502182
3E1I 0503 Comp.arr.dwg. Drain tanks 10/20MAL50BB001 502183
3E1I 0504 Comp.arr.dwg. Drain pump units 13 & 24 502184
3E1I 0505 Comp.arr.dwg. Gland steam units for unit 13 and 24 503875
3E1I 0601 Comp.arr.dwg. PA-tube cleaning unit 502185
3E1I 0602 Comp.arr.dwg. PA-main cooling water pumps 502186
3E1I 0603 Comp.arr.dwg. PA-aux.cooling water pumps 502187
3E1I 0604 Installation of drainage & cooling water pumps 501701
3E1I 0605 Main cooling water pipes in ground 501800
3E1I 0606 Sea water dosing equipment 503484
3E1I 0607 Cooling tower installation 503872
3E1I 0701 Closed cooling water PG 501953
3E1I 0702 Comp.arr.dwg. PG-CCW heat exchanger 502189
3E1I 0703 Comp.arr.dwg. PG-CCW pump units 502190
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
16 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3E1I 0704 Comp.arr.dwg. PG-CCW expansion vessel 502191
3E1I 0801 Erection of compressed air unit 502520
3E1I 0802 Comp.arr.dwg. Compressed air tanks 10/20QFA10BB001
503874
3E1I 0901 Comp.arr.dwg. Fire fighting pump containers 502522
3E1I 0902 Comp.arr.dwg. Argon container 503255
3E1I 1001 Comp.arr.dwg. Emergency diesel containers 502521
3E1I 1101 Control buildings Arrangement 501035
3E1I 1102 Comp.arr.dwg. Auxiliary transformers 502523
3E1I 1103 Comp.arr.dwg. Switchgear container nr.32 502524
3E1I 1104 Comp.arr.dwg. Steam turbine 13 Control room no.50 502525
3E1I 1105 Comp.arr.dwg. Steam turbine 24 & Boiler control room no.51 and no.56
502526
3E1I 1201 Cold Water GKS 502194
3E1I 1202 Sewage / Waste Water GQA 502193
3E2 010101 Site layout Phase I and II 501 026
3E2 010102 Site layout Phase I 501 027
3E2 010103 Plant layout 501 028
3E2 010104 Site layout Section looking north 501 039
3E2 010201 Location of main equipments 501 029
3E2 010301 Site plot plan 501 036
3E2 010302 Power block 1 501 038
3E2 010401 Sound layout 501 034
3E2 010501 Classification drawing 501 031
3E2 010601 Revision layout 501 921
3E2 020101 Instrument layout 501952
3E2 020201 Electrical equipment layout 502155
3E2 020301 Bus duct trenches Overview 501032
3E2 020401 Electric layouts 501755
3E2 020402 Control building Electric layout 502085
3E2 020501 Cable pipes in ground 501823
3F1 0101 General directions (K30-101) 501 101
3F1 0102 Concrete step on floor of concrete DS016
3F1 0103 Fixed wall ladder DS036
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
17 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3F1 0104 Concrete step on ground surface DS048
3F1 0105 Excavation and filling DS040
3F1 0106 Construction joint DS042
3F1 0107 Construction joint, watertight, volclay DS045
3F1 0108 Traffic barrier DS049
3F1 0109 Heavy lift crane foundation DS051
3F1 0110 Location of apparatures, lighting, wallduct and AC DS052
3F1 0111 Climbing iron DS053
3F1 0112 Bypass stack Anchor bolts A1-A4 DS101
3F1 0113 Concrete Walls Joint DS020
3F1 0114 Excavation Detail DS041
3F1 0115 Joint Between Tankfoundation and Slab DS043
3F1 0201 Site layout (K30-102) 501 102
3F1 0202 Soil resistivity measurement plan (K30-103) 501 103
3F1 0203 Borehole plan (K30-108) 501 108
3F1 0204 Excavation layout (K30-109) 501 109
3F1 0205 Excavation 3 (K30-300) 501 300
3F1 0206 Power area Excavation 1 (K30-303) 501 303
3F1 0207 Power area Excavation 2 (K30-304) 501 304
3F1 0208 Topographical Map 501743
3F1 0301 Keyplan Fencing and Gates (K30-104) 501 104
3F1 0302 Site layout Crossroads (K30-105) 501 105
3F1 0303 Access road (K30-106) 501 106
3F1 0304 Site establishing plan (K30-107) 501 107
3F1 0305 Site profile plan (K30-111) 501 111
3F1 0306 Access road (K30-112) 501 112
3F1 0307 Roads and pavements (K30-113) 501 113
3F1 0308 Site pavements (K30-114) 501 114
3F1 0309 Western boundary sections (K30-317) 501 317
3F1 0310 Western boundary south plan (K30-318) 501 318
3F1 0311 Western boundary north plan (K30-319) 501 319
3F1 0401 1 power unit 11 GT foundation General arrangement (K30-120)
501 120
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
18 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3F1 0402 1 power unit 11 R.C. details of GT Foundation (K30-121)
501 121
3F1 0403 3 power unit 13 GT foundation Embedded steel plates (K30-129)
501 129
3F1 0404 3 power unit 13 Gas and steam turbine foundation General arrangement (K30-120)
501 138
3F1 0405 3 power unit 13 GT and ST foundation R.C details (K30-139)
501 139
3F1 0406 2 power unit 22 GT foundation General arrangement (K30-171)
501 171
3F1 0407 2 power unit 22 R.C. details of GT Foundation (K30-172)
501 172
3F1 0408 Steel stair 3 Steel stairs 4, 5 and 6 (K30-183) 501 183
3F1 0409 4 power unit 24 GT foundation Embedded steel plates (K30-259)
501 259
3F1 0410 4 power unit 24 GT and ST foundation General arrangement (K30-259)
501 265
3F1 0411 4 power unit 24 GT and ST foundation R.C details (K30-266)
501 266
3F1 0501 1 power unit 11 Plan General arrangement (K30-116) 501 116
3F1 0502 3 power unit 13 and 14 power unit 24 ST Steel stairs 1A,1B,2A and 2B (K30-117)
501 117
3F1 0503 3 power unit 13 and 14 power unit 24 ST Steel stairs 3A,3B,4A and 4B (K30-118)
501 118
3F1 0504 3 power unit 13 Plan General arrangement (K30-130) 501 130
3F1 0505 3 power unit 13 Oil tank foundation General arrangement and R.C. details (K30-133)
501 133
3F1 0506 2 power unit 22 Plan General arrangement (K30-167) 501 167
3F1 0507 GT Lube oil coolers area nos, 52 and 53 Structural steel (K30-175)
501 175
3F1 0508 GT Lube oil coolers area nos, 41 and 42 Structural steel (K30-176)
501 176
3F1 0509 GT Lube oil coolers area nos, 54 and 55 Structural steel (K30-177)
501 177
3F1 0510 4 power unit 24 Plan General arrangement (K30-258) 501 258
3F1 0511 4 power unit 24 Oil tank foundation General arrangement and R.C. details (K30-260)
501 260
3F1 0601 Structural steel beams and checker plate Plan, sections and details (K30-126)
501 126
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
19 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3F1 0602 3 power unit 13 Condensate pit Plan -5,30 Foundations (K30-127)
501 127
3F1 0603 4 power unit 24 Condensate pit Plan -5,30 Foundations (K30-128)
501 128
3F1 0604 3 power unit 13 Condensate pit Plan -0,10 and plan -5,30 (K30-134)
501 134
3F1 0605 3 power unit 13 Condensate pit Sections General arrangement (K30-135)
501 135
3F1 0606 3 power unit 13 Condensate pit R.C. Details of plan -5,30 and walls (K30-136)
501 136
3F1 0607 3 power unit 13 Condensate pit R.C. Details of plan -0,10 (K30-137)
501 137
3F1 0608 4 power unit 24 Condensate pit Plan -0,10 and plan -5,30 General arrangement (K30-261)
501 261
3F1 0609 4 power unit 24 Condensate pit Sections General arrangement (K30-262)
501 262
3F1 0610 4 power unit 24 Condensate pit R.C. Details of plan -5,30 and walls (K30-263)
501 263
3F1 0611 4 power unit 24 Condensate pit R.C. Details of plan -0,10 (K30-264)
501 264
3F1 0701 1 power unit 11 Boiler HRSG 11 Foundation General arrangement (K30-122)
501 122
3F1 0702 1 power unit 11 Boiler HRSG 11 Foundation R.C. details (K30-123)
501 123
3F1 0703 3 power unit 13 Boiler HRSG 13 Foundation General arrangement (K30-131)
501 131
3F1 0704 3 power unit 13 Boiler HRSG 13 Foundation R.C. details (K30-132)
501 132
3F1 0705 2 power unit 22 Boiler HRSG 22 Foundation General arrangement (K30-173)
501 173
3F1 0706 2 power unit 22 Boiler HRSG 22 Foundation R.C. details (K30-174)
501 174
3F1 0707 4 power unit 24 Boiler HRSG 24 Foundation General arrangement (K30-267)
501 267
3F1 0708 4 power unit 24 Boiler HRSG 24 Foundation R.C. details (K30-268)
501 268
3F1 0801 5 el & control building UBA Plan -2,400/-1,000 Plan +0,000 with loads / +4,000 (K30-140)
501 140
3F1 0802 5 el & control building UBA Sections (K30-141) 501 141
3F1 0803 5 el & control building UBA Elevations (K30-142) 501 142
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
20 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3F1 0804 5 el & control building UBA G.A. of plan -2,400/-1,00 (K30-143)
501 143
3F1 0805 5 el & control building UBA R.C. detail of plan -2,400/-1,00 (K30-144)
501 144
3F1 0806 5 el & control building UBA G.A and R.C. detail of plan +4,00 (K30-145)
501 145
3F1 0807 5 el & control building UBA Roof plan and sections (K30-146)
501 146
3F1 0808 5 el & control building UBA Roof plan details (K30-147)
501 147
3F1 0809 5 el & control building UBA Reinforcement details section (K30-148)
501 148
3F1 0810 5 el & control building UBA Specification doors, windows and kitchenette (K30-149)
501 149
3F1 0811 5 el & control building UBA Structural steel Plan -2,400 and +0,000 (K30-163)
501 163
3F1 0812 5 el & control building UBA Structural steel Sections and details (K30-164)
501 164
3F1 0813 5 el & control building UBA Excavation and filling plan (K30-165)
501 165
3F1 0814 5 el & control building UBA Excavation and filling Sections (K30-166)
501 166
3F1 0815 5 el & control building UBA Suspended ceiling Equipment WC (K30-213)
501 213
3F1 0816 5 el & control building UBA Laboratory equipment (K30-215)
501 215
3F1 0817 5 el & control building UBA Structural steel Gangway and stairs (K30-216)
501 216
3F1 0818 5 el & control building UBA Water supply Sewage disposal system (V52-325)
501 325
3F1 0901 Foundations E1-E3. F1-F3 (K30-119) 501 119
3F1 0902 26 Pipe storage USU 32 Electrical building (K30-233)
501 233
3F1 1001 Transformer Foundation Unit 11 (K30-180) 501 180
3F1 1002 45 Auxiliary transformers G.A. and R.C. detail of transformer foundations (K30-181)
501 181
3F1 1003 Transformer Foundation Unit 22 (K30-182) 501 182
3F1 1004 Transformer Foundation Unit 13 (K30-198) 501 198
3F1 1005 Transformer Foundation Unit 24 (K30-199) 501 199
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
21 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3F1 1101 48 Bus duct trenches Covers type 1-12 GA and RC (K30-282)
501 282
3F1 1102 48 Bus duct trenches Covers type 21-31 GA and RC (K30-283)
501 283
3F1 1103 48 Bus duct trenches Covers type 41-51 GA and RC (K30-284)
501 284
3F1 1104 48 Bus duct trenches Covers 1 (K30-301) 501 301
3F1 1105 48 Busduct Covers 2 (K30-302) 501 302
3F1 1106 48 Bus duct trenches 1 (K30-305) 501 305
3F1 1107 48 Busduct trenches 2 (K30-306) 501 306
3F1 1108 48 Bus duct trenches, UBZ Sections and details GA and RC (K30-307)
501 307
3F1 1109 48 Bus duct trenches, UBZ Sections and details GA and RC 2 (K30-308)
501 308
3F1 1110 48 Bus duct trenches, UBZ Sections and details (K30-309)
501 309
3F1 1201 Power and control conduits (K30-296) 501 296
3F1 1202 Power and control conduits (K30-297) 501 297
3F1 1203 Power and control conduits (K30-298) 501 298
3F1 1204 Power and control conduits Details and types (K30-299)
501 299
3F1 1301 6 fuel tank farm, UEJ10 Plan GA and RC details (K30-150)
501 150
3F1 1302 6 fuel tank farm, UEJ10 Sections General arrangement (K30-151)
501 151
3F1 1303 Fuel tank 1 GA and R.C. details (K30-152) 501 152
3F1 1304 Fuel tank 2 GA and R.C. details (K30-153) 501 153
3F1 1305 9 Fuel day tank, GA and R.C. details (K30-154) 501 154
3F1 1306 10 Fuel forwarding, GA and R.C. details (K30-155) 501 155
3F1 1307 6 fuel tank farm, Sections R.C. details (K30-156) 501 156
3F1 1308 10 Fuel forwarding, Sections R.C. details (K30-157) 501 157
3F1 1309 6 fuel tank farm, Sections R.C. details (K30-158) 501 158
3F1 1310 6 fuel tank farm, UEJ10 Excavation plan (K30-159) 501 159
3F1 1311 10 Fuel forwarding, Super structure (K30-162) 501 162
3F1 1312 6 fuel tank farm, UEJ10 Steel stairs Plan and sections (K30-189)
501 189
3F1 1401 7 fuel unloading General arrangement, concrete 501 160
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
22 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
reinforcement and sections (K30-160)
3F1 1402 7 fuel unloading Sections and details (K30-161) 501 161
3F1 1501 15 cooling tower bassin Embedded steel (K30-228) 501 228
3F1 1502 15 cooling tower Access to roof plan (K30-240) 501 240
3F1 1503 15 cooling tower Access to roof plan Stairs (K30-241)
501 241
3F1 1504 15 cooling tower Screens (K30-252) 501 252
3F1 1505 15 cooling tower Plan, sections and details (K30-253) 501 253
3F1 1506 15 cooling tower Monorails for screens Plan, sections and details (K30-254)
501 254
3F1 1507 15 cooling tower Structural steel Embedded steel plates Details (K30-269)
501 269
3F1 1508 15 cooling tower GA of ground floor (K30-270) 501 270
3F1 1509 15 cooling tower GA of plan +0,500/+0,800/+1,00 (K30-271)
501 271
3F1 1510 15 cooling tower GA of ground floor and plan +0,500/+0,800 Sections (K30-272)
501 272
3F1 1511 15 cooling tower Excavation plan (K30-273) 501 273
3F1 1512 15 cooling tower R.C. detail of ground floor (K30-274)
501 274
3F1 1513 15 cooling tower R.C. detail of ground floor Details (K30-275)
501 275
3F1 1514 15 cooling tower Structural steel Embedded steel plates Details (K30-276)
501 276
3F1 1515 15 cooling tower R.C. detail of plan +0,500/+0,800/+1,00 (K30-277)
501 277
3F1 1516 15 cooling tower R.C. detail of plan +0,500/+0,800/+1,00 Sections (K30-278)
501 278
3F1 1517 15 cooling tower GA of level +0,500 Details (K30-279)
501 279
3F1 1601 Horizontal section with cooling tower air inlet Cooling cells 1 to 3 (F 01)
502 566
3F1 1602 Horizontal section, cooling fill level at +5.700 Cooling cells 1 to 3 (F 02)
502 567
3F1 1603 Horizontal section, water distribution level at +8.925 Cooling cells 1 to 3 (F 03)
502 568
3F1 1604 Horizontal section, top view of cooling tower at +12.100 Cooling cells 1 to 3 (F 04)
502 569
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
23 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3F1 1605 Longitudinal section A cell 1-3 Cooling cells 1 to 3 (F 05)
502 570
3F1 1606 Longitudinal section B, cell 1-3 Cooling cells 1 to 3 (F 06)
502 571
3F1 1607 Cross sections C and D, cell 1-3 Cooling cells 1 to 3 (F 07)
502 572
3F1 1608 Precast beams at cooling fill level and water distribution level Cooling cells 1 to 3 (F 08)
502 573
3F1 1609 Level +0,800 to 11,800 bypass tower (F 09) 502 574
3F1 1610 Walls, columns and brackets axis A-C, 7+5+3+1 Cooling cells 1 to 3 (H 01)
502 575
3F1 1611 Walls, columns and brackets axis A, 1-7 Cooling cells 1 to 3 (H 02)
502 576
3F1 1612 Walls, columns and brackets axis C, 1-7 Cooling cells 1 to 3 (H 03)
502 577
3F1 1613 Walls, columns and brackets axis B, 7-1 Cooling cells 1 to 3 (H 04)
502 578
3F1 1614 Water channel axis C, 1-7 Cooling cells 1 to 3 (H 05) 502 579
3F1 1615 Longitudinal and cross beams at level +12,100 Cooling cells 1 to 3 (H 06)
502 580
3F1 1616 Horizontal section top view of cooling tower at +12,100 Cooling cells 1 to 3 (H 07)
502 581
3F1 1617 Bypass tower Level +0,800 to 11,800 (H 08) 502 582
3F1 1701 30 auxiliary cooling water coolers UQB Plan and sections GA and R.C. details (K30-255)
501 255
3F1 1702 30 auxiliary cooling water coolers UQB Sections R.C. details (K30-256)
501 256
3F1 1703 30 auxiliary cooling water coolers Excavation (K30-257)
501 257
3F1 1801 17 water treatment plant UGD Plan GA and RC details (K30-190)
501 190
3F1 1802 17 water treatment plant UGD Sections and details General arrangement (K30-191)
501 191
3F1 1803 17 water treatment plant UGD Sections RC details (K30-192)
501 192
3F1 1804 17 water treatment plant UGD Superstructure GA roof plan, sections and details (K30-193)
501 193
3F1 1805 17 water treatment plant UGD Excavation (K30-194) 501 194
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
24 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3F1 1901 46 and 47 water tanks Plan and section GA and R.C details (K30-195)
501 195
3F1 1902 46 and 47 water tanks Sections R.C details (K30-196) 501 196
3F1 1903 28 Fire fighting pumps 46 and 47 water tanks Excavation (K30-197)
501 197
3F1 2001 29 Compressor units UTF (K30-250) 501 250
3F1 2101 18 emergency diesel unit, UBN Plan and sections GA and R.C details (K30-280)
501 280
3F1 2102 18 emergency diesel unit 45 auxiliary transformers Excavation (K30-281)
501 281
3F1 2201 22 warehouse 23 maintenance shop UST Plans (K30-217)
501 217
3F1 2202 22 warehouse 23 maintenance shop UST Sections (K30-218)
501 218
3F1 2203 22 warehouse and 23 maintenance shop UST Elevations (K30-219)
501 219
3F1 2204 22 warehouse 23 maintenance shop UST Specification Doors, windows and kitchenette (K30-220)
501 220
3F1 2205 22warehouse/23maintenance 32electr.build./26 pipe storage 31drain systems Excavation plan (K30-221)
501 221
3F1 2206 22 warehouse 23 maintenance shop UST Plans +0,000 and +3,200 (K30-222)
501 222
3F1 2207 22 warehouse 23 maintenance shop UST Reinforcement details (K30-223)
501 223
3F1 2208 22 warehouse/23 maintenance Water supply and sewage disposal system (V52-328)
501 328
3F1 2301 24 oil/25 chemical storage USU Plan and sections GA and R.C details (K30-229)
501 229
3F1 2302 24 oil/25 chemical storage USU Excavation (K30-230)
501 230
3F1 2303 24 oil/25 chemical storage USU Sections (K30-231) 501 231
3F1 2304 24 oil/25 chemical storage USU Steel details (K30-232)
501 232
3F1 2401 20 administration building, UYA Plan -0,300 and roof- and ventilation plan +2,650 (K30-205)
501 205
3F1 2402 20 administration building Sections (K30-206) 501 206
3F1 2403 20 administration building Elevations (K30-207) 501 207
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
25 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3F1 2404 20 administration building, UYA Specification Doors, windows and kitchenette (K30-208)
501 208
3F1 2405 20 administration building, UYA Excavation (K30-209)
501 209
3F1 2406 20 administration building, UYA Concrete and reinforcement plans (K30-210)
501 210
3F1 2407 20 administration building, UYA Structural steel Plan and sections (K30-211)
501 211
3F1 2408 20 administration building, UYA Structural steel Details (K30-212)
501 212
3F1 2409 20 administration building, UYA Suspended ceiling Equipment WC (K30-214)
501 214
3F1 2410 20 administration building, UYA Structural steel Gangway and stairs (K30-224)
501 224
3F1 2411 20 administration building Water supply and sewage disposal system (V52-326)
501 326
3F1 2501 27 security office 8 unloading office (K30-236) 501 236
3F1 2502 27 security office 8 unloading office Specification Doors, windows etc. (K30-237)
501 237
3F1 2503 8 unloading/27 security office Water supply and sewage disposal system (V52-327)
501 327
3F1 2601 Site building drainage Stormwater downpipes and drains (K30-110)
501 110
3F1 2602 Site layout Miscellaneous underground pipework (K30-115)
501 115
3F1 2603 Miscellaneous underground pipework Sections (K30-124)
501 124
3F1 2604 Site layout Raw water and main cooling water pipes (K30-125)
501 125
3F1 2605 Site plan Water supply and sewage disposal system (V50-320)
501 320
3F1 2606 Site plan Underground storm and waste Water drainplan (V50-321)
501 321
3F1 2607 Site plan Underground storm water Details (V50-322)
501 322
3F1 2608 Waste water system, sewage water system, cold water system, storm water system (V50-323)
501 323
3F1 2701 31 drain systems (K30-185) 501 185
3F1 2702 31 drain system Water tank Plans, sections and details (K30-186)
501 186
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
26 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3F1 2703 31 drain system Water tank Concrete reinforcement (K30-187)
501 187
3F1 2801 22 warehouse 23 maintenance shop UST Office Sprinkler (FP-203)
501 203
3F1 2802 10 fuel forwarding GA and R.C details Sprinkler (FP-204)
501 204
3F1 2803 Portable fire extinguishers (FP-234) 501 234
3F1 2804 Fire protection Site plan (FP-314) 501 314
3F1 2805 Deluge valve station 1 Sprinkler (FP-169) 501 169
3F1 2806 Deluge valve station 2 Sprinkler (FP-170) 501 170
3F1 2807 Gas turbine lube oil coolers area nos, 52, 53 Typical sprinkler design (FP-178)
501 178
3F1 2808 Steam turbine lube oil tanks area nos, 41, 42 Typical sprinkler design (FP-179)
501 179
3F1 2809 Gas turbine lube oil coolers area nos, 54, 55 Typical sprinkler design (FP-184)
501 184
3F1 2810 5 el & control building UBA Plan -2,400 / -1,000 Sprinkler (FP-201)
501 201
3F1 2811 22 warehouse 23 maintenance shop UST Ceiling Sprinkler (FP-202)
501 202
3F1 2901 28 Fire fighting pumps USG Plan and section GA and R.C details (K30-244)
501 244
3F1 3001 Pipe rack foundation (K30-311) 501 311
3F1 3002 Pipe rack foundation (K30-312) 501 312
3F1 3003 49 pipe racks ULY Anchor bolts (K30-313) 501 313
3F1 3004 49 pipe rack Foundations A:1, A:2, A:3, A:5 and B:1 (K30-330)
501 330
3F1 3005 49 pipe rack Foundations B:2, C1:2 and C1:3 (K30-331)
501 331
3F1 3006 49 pipe rack Foundations C3:1, C3:2 and D:1 (K30-332)
501 332
3F1 3007 49 pipe rack Foundations D:2 and E:1 (K30-333) 501 333
3F1 3008 49 pipe rack Foundations F:1, F:2 and G:1 (K30-334) 501 334
3F1 3009 49 pipe rack Foundations G:2, H:1 and H:2 (K30-335)
501 335
3F1 3010 49 pipe rack Foundations H:3, H:4 and H:5 (K30-336)
501 336
3F1 3011 49 pipe rack Foundations H:6, H:7, H:8, K:5, K:6, 501 337
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
27 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
M:1, M:2, P:3 and P:6 (K30-337)
3F1 3012 49 pipe rack Foundations M:7 (K30-338) 501 338
3F1 3013 49 pipe rack Foundations J:2-J:10 (K30-339) 501 339
3F1 3014 49 pipe rack Foundations C3:3 (K30-340) 501 340
3F1 3015 P&ID Sprinkler / Fire Water FP-246 501246
3F1 3016 P&ID Sprinkler / Fire Water Detail FP-247 501247
3F1 3017 Piping in Pipe Racks 502593
3F1 3101 Structural steel Piperack 3D View Overall 501 670
3F1 3102 Structural steel Piperack 3D View Part 1 501 671
3F1 3103 Structural steel Piperack 3D View part 2 (K30-672) 501 672
3F1 3104 Structural steel Piperack 3D View part 3 (K30-673) 501 673
3F1 3105 Structural steel Piperack 3D Overallplan (K30-674) 501 674
3F1 3106 Structural steel Piperack Plan phase 1:1 (K30-675) 501 675
3F1 3107 Structural steel Piperack Plan phase 1:2 (K30-676) 501 676
3F1 3108 Structural steel Piperack Plan phase 2 (K30-677) 501 677
3F1 3109 Structural steel Piperack Elevation phase 1 Rack A-C (K30-678)
501 678
3F1 3110 Structural steel Piperack Elevation phase 1 Rack E-G (K30-679)
501 679
3F1 3111 Structural steel Piperack Elevation phase 1 Rack H (K30-680)
501 680
3F1 3112 Structural steel Piperack Elevation phase 2 Rack D,K,L,M (K30-681)
501 681
3F1 3113 Structural steel Piperack Elevation phase 2 Platform P (K30-682)
501 682
3F1 3114 Structural steel Piperack Sections phase 1 A:4-G:1 (K30-683)
501 683
3F1 3115 Structural steel Piperack Section phase 1 H:1-H:9 (K30-684)
501 684
3F1 3116 Structural steel Piperack Section phase 2 D:1,K:6-M:7 (K30-685)
501 685
3F1 3117 Structural steel Piperack Section phase 1 SA-SH (K30-686)
501 686
3F1 3118 Structural steel Piperack Section phase 2 SD,SK-SM (K30-687)
501 687
3F1 3119 Structural steel Piperack Details (K30-688) 501 688
3F1 3120 Structural steel Piperack General Instructions (K30- 501 689
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
28 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
689)
3F1 3121 Structural steel Piperack Elevation phase 2 Rack K,M (K30-690)
501 690
3F1 3122 Structural steel Piperack C:2 Additional support (K30-691)
501 691
3F1 3123 Structural steel Pipe rack Sun screens (K30-692) 501 692
3F1 3124 Structural steel Piperack Overallplan Erection (K502-320)
502 320
3F1 3125 Structural steel Piperack Rack A, A:3 - A:5 Erection (K502-321)
502 321
3F1 3126 Structural steel Piperack Rack A, A:1 - A:3 Erection (K502-322)
502 322
3F1 3127 Structural steel Piperack Rack B, A:1 - B:2 Erection (K502-323)
502 323
3F1 3128 Structural steel Piperack Rack C, A:1-C:2 Erection (K502-324)
502 324
3F1 3129 Structural steel Piperack Rack C, C:2-C:4 Erection (K502-325)
502 325
3F1 3130 Structural steel Piperack Rack C, C:4-C:6 Erection (K502-326)
502 326
3F1 3131 Structural steel Piperack Rack E, A:5-F:2 Erection (K502-327)
502 327
3F1 3132 Structural steel Piperack Rack F, F:1-F:3 Erection (K502-328)
502 328
3F1 3133 Structural steel Piperack Rack G, G:1-G:2 Erection (K502-329)
502 329
3F1 3134 Structural steel Piperack Rack H, H:2-H:1 Erection (K502-330)
502 330
3F1 3135 Structural steel Piperack Rack H, H:4-H:3-H:2 Erection (K502-331)
502 331
3F1 3136 Structural steel Piperack Rack H, H:6-H:5-H:4 Erection (K502-332)
502 332
3F1 3137 Structural steel Piperack Rack H, H:7-H:8-H:9 Erection (K502-333)
502 333
3F1 3138 Structural steel Piperack Rack J Erection (K502-334) 502 334
3F1 3139 Structural steel Piperack-Phase 1 Support: Cabeltray Erection (K502-335)
502 335
3F1 3140 Structural steel Piperack-Phase 2 Rack D Erection (K502-336)
502 336
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
29 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3F1 3141 Structural steel Piperack-Phase 2 Rack K Erection (K502-337)
502 337
3F1 3142 Structural steel Piperack-Phase 2 Rack L Erection (K502-338)
502 338
3F1 3143 Structural steel Piperack-Phase 2 Rack M1 Erection (K502-339)
502 339
3F1 3144 Structural steel Piperack-Phase 2 Rack M Erection (K502-340)
502 340
3F1 3145 Structural steel Piperack-Phase 2 Rack M Erection (K502-341)
502 341
3F1 3146 Structural steel Piperack-Phase 2 Rack N Erection (K502-342)
502 342
3F1 3147 Structural steel Piperack-Phase 2B Platform P,R 3D View (K502-344)
502 344
3F1 3148 Structural steel Piperack-Phase 2B Platform P,R 3D View (K502-345)
502 345
3F1 3149 Structural steel Piperack-Phase 2B Platform P,R Plan -2,20 (K502-346)
502 346
3F1 3150 Structural steel Piperack-Phase 2B Platform P,R Plan +4,40 (K502-347)
502 347
3F1 3151 Structural steel Piperack-Phase 2B Platform P,R Sections (K502-348)
502 348
3F1 3201 Submarine pipelines Plan, profile and trench sections (2109150-600)
501 600
3F1 3202 Submarine pipelines Intake structure, dimensions (2109150-602)
501 602
3F1 3203 Submarine pipelines Intake structure, sections Reinforcement 1 (2109150-603)
501 603
3F1 3204 Submarine pipelines Intake structure, sections Reinforcement 2 (2109150-604)
501 604
3F1 3205 Submarine pipelines Intake structure, screens and chlorination pipeline (2109150-605)
501 605
3F1 3206 Submarine pipelines Outlet structure, dimensions (2109150-606)
501 606
3F1 3207 Submarine pipelines Outlet structure, slab and support Reinforcement (2109150-607)
501 607
3F1 3208 Submarine pipelines Intake pipeline, anchor block Dimensions (2109150-608)
501 608
3F1 3209 Submarine pipelines Intake pipeline, anchor block Reinforcement (2109150-609)
501 609
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
30 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3F1 3210 Submarine pipelines Outfall pipeline, anchor block Dimensions (2109150-610)
501 610
3F1 3211 Submarine pipelines Outfall pipeline, anchor block Reinforcement (2109150-611)
501 611
3F1 3212 Submarine pipelines Connections to pumping station and intake structure, General arr. (2109150-612)
501 612
3F1 3213 Submarine pipelines Connections to pumping station and intake structure, Details (2109150-613)
501 613
3F1 3214 Floating Tanks to Submarine Pipeline Outlet Riser 501654
3F1 3301 Pumping station 300 l/s Mechanical installation Plans (1140110-620)
501 620
3F1 3302 Pumping station 300 l/s Mechanical installation Sections (1140110-621)
501 621
3F1 3303 Pumping station 300 l/s Mechanical installation Isometric (1140110-622)
501 622
3F1 3304 Pumping station Site layout (1140110-623) 501 623
3F1 3305 Pumping station Connection road and erosion protection Plan, type sections (1140110-624)
501 624
3F1 3306 Pumping station 300l/s Mechanical installation Screen (1140110-625)
501 625
3F1 3307 Pumping station General arrangement (2109150-627) 501 627
3F1 3308 Pumping station Sections, details 1 (2109150-628) 501 628
3F1 3309 Pumping station Sections, details 2 (2109150-629) 501 629
3F1 3310 Pumping station Reinforcement bottom slab, 1 (2109150-630)
501 630
3F1 3311 Pumping station Reinforcement bottom slab, 2 (2109150-631)
501 631
3F1 3312 Pumping station Reinforcement, walls, 1 (2109150-632)
501 632
3F1 3313 Pumping station Reinforcement, walls, 2 (2109150-633)
501 633
3F1 3314 Pumping station Reinforcement, upper slab (2109150-634)
501 634
3F1 3315 Pumping station Reinforcement, upper slab, sections (2109150-635)
501 635
3F1 3316 Pumping station Superstructure Plan elevations (2109150-636)
501 636
3F1 3317 Pumping station Superstructure Plans, sections (2109150-637)
501 637
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
31 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3F1 3318 Pumping station Superstructure Details (2109150-638)
501 638
3F1 3319 Pumping station Retaining wall General arrangement (2109150-640)
501 640
3F1 3320 Pumping station Retaining wall Dimensions (2109150-641)
501 641
3F1 3321 Pumping station Retaining wall Reinforcement, 1 (2109150-642)
501 642
3F1 3322 Pumping station Retaining wall Reinforcement, 2 (2109150-643)
501 643
3F1 3401 Overland pipelines - Sitework Support unit for manhole Dimensions, Reinforcement (2109150-644)
501 644
3F1 3402 Pipeline, pumping station - Site Plan (1140110-645) 501 645
3F1 3403 Pipeline, pumping station - Site Plan (1140110-646) 501 646
3F1 3404 Pipeline, pumping station - Site Plan (1140110-647) 501 647
3F1 3405 Pipeline, pumping station - Site Jointing chambers for cables (1140110-648)
501 648
3F1 3406 Overland pipelines - Sitework Jointing chambers for cables Type A and B Dimensions (2109150-649)
501 649
3F1 3407 Overland pipelines - Sitework Jointing chamber for cables Type A Reinforcement (2109150-650)
501 650
3F1 3408 Pipeline, pumping station - Site Profile, typical cross sections of trenches (1140110-651)
501 651
3F1 3409 Pipeline, pumping station - Site Profile (1140110-652)
501 652
3F1 3410 Pipeline, pumping station - Site Profile (1140110-653)
501 653
3F1 3411 Pipeline, pumping station - Site Air release valves chambers Tyoe C and D (1140110-663)
501 663
3F1 3412 Pipeline, pumping station - Site Washout valves chamber, Manhole Ø2000 (1140110-664)
501 664
3F1 3413 Air release valves chamber Types A and D, Washout valves chamber, manhole Ø2000 Dim. (2109150-665)
501 665
3F1 3414 Overland pipelines - Sitework Air release valves chamber Types C and D, Reinforcement (2109150-666)
501 666
3F1 3415 Overland pipelines - Sitework Washout valves chamber Reinforcement (2109150-667)
501 667
3F1 3416 Overland pipelines - Sitework Manhole Ø2000 501 668
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
32 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
Reinforcement (2109150-668)
3F1 3417 Overland pipelines - Sitework Jointing chamber, Type B Reinforcement (2109150-669)
501 669
3F1 3501 6 fuel tank farm UEJ10 Grounding and lightning protection (K30-188)
501 188
3F1 3502 20 administration building, UYA Lighting protection cable raceway communication systems (E69-361)
501 361
3F1 3503 8/27 Security/unloading office Lighting protection cable raceway communication systems (E69-371)
501 371
3F1 3504 20 administration building, UYA Sections (E60-378) 501 378
3F1 3505 22 warehouse / 23 maintenance UST Section (E60-379)
501 379
3F1 3506 22 warehouse / 23 maintenance UST Lightning protection Cable raceway Communication systems (E69-381)
501 381
3F1 3507 Pumping station 300 l/s Sections (E60-382) 501 382
3F1 3508 Site layout Telecommunication systems (E60-383) 501 383
3F1 3509 Plant layout Public address-system (E60-384) 501 384
3F1 3510 05 el & control building UBA Lighting protection Cable raceway Communication system (E69-391)
501 391
3F1 3511 Pumping station 300 l/s Lighting protection (E69-397)
501 397
3F1 3512 Site layout Grounding system (E66-398) 501 398
3F1 3513 Connection diagram Grounding system (E66-399) 501 399
3F1 3601 20 administration building Lighting (E63-360) 501 360
3F1 3602 Boiler Lighting Elevation 0-5050 (E63-362) 501 362
3F1 3603 Boiler Lighting Elevation 5050-10650 (E63-363) 501 363
3F1 3604 Boiler Lighting Elevation 10650-16250 (E63-364) 501 364
3F1 3605 Boiler Lighting Elevation 16250-40000 (E63-365) 501 365
3F1 3606 8/27 Security/unloading office Lighting (E63-370) 501 370
3F1 3607 20 administration building Power (E63-372) 501 372
3F1 3608 8/27 Security/unloading office Power (E63-373) 501 373
3F1 3609 22 warehouse / 23 maintenance UST Power (E63-374)
501 374
3F1 3610 05 el & control building UBA Power (E63-375) 501 375
3F1 3611 20 administration building, UYA Sections (E60-378) 501 378
3F1 3612 Pumping station 300 l/s Power (E63-376) 501 376
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
33 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3F1 3613 22 warehouse / 23 maintenance UST Section (E60-379)
501 379
3F1 3614 22 warehouse / 23 maintenance UST Lighting (E63-380)
501 380
3F1 3615 Pumping station 300 l/s Sections (E60-382) 501 382
3F1 3616 05 el & control building UBA Lighting (E63-390) 501 390
3F1 3617 Site layout External power cables (E63-394) 501 394
3F1 3618 Site layout External lighting (E63-395) 501 395
3F1 3619 Pumping station 300 l/s Lighting (E63-396) 501 396
3F1 3701 5 el & control building UBA HVAC Air flow diagram (K30-140HVAC-ASB1)
505 958
3F1 3702 5 el & control building UBA HVAC /Duct layout (K30-140HVAC-ASB2)
505 959
3F1 3703 5 el & control building UBA HVAC / Equipment arrangement (K30-140HVAC-ASB3)
505 960
3F1 3704 5 el & control building UBA HVAC / Cable rooms Duct layout (K30-140HVAC-ASB4)
505 961
3F1 3705 Distribution boards Electric & Control Building (HVAC - E107)
505 962
3F1 3706 Single wiring diagram Electric & Control Building Block 1 (HVAC - E108)
505 963
3F1 3707 Single wiring diagram Electric & Control Building Block 2 (HVAC - E109)
505 964
3F1 3708 Control diagram MCC (HVAC - E110) 505 965
3F1 3709 Control diagram MCC (HVAC - E111) 505 966
3F1 3710 Control diagram MCC (HVAC - E112) 505 967
3F1 3711 Power Panel Board Inside View (HVAC - E113) 505 968
3F1 3712 MCC Control Panel Inside View (HVAC - E114) 505 969
3F1 3713 Power & Control cable Line Diagram and Details of cable tray (HVAC - E115)
505 970
3F1 3714 Single Line Diagram Control Building AC1-P110, Duty & redundant (HVAC - E116)
505 971
3F1 3715 Wiring Diagram Fans & Damper Control Laboratory Room (HVAC - E117)
505 972
3F1 3716 Control & Switches Panels P1 & P2 Laboratory Room (HVAC - E118)
505 973
3F1 3717 Fire Alarm / HVAC Coordination Panel (HVAC - E119)
505 974
Documentation Overview Doc. No.
1CCG50959 Rev. ind.
- List of Documents Techn. Area / DCC
/& AB102 Page
34 (34)
SE-612 83 FINSPONG, Sweden Siemens Industrial Turbomachinery AB
Doc. des.
B690& AB102 /
We
rese
rve
all r
ight
s in
this
doc
umen
t and
in th
e in
form
atio
n co
ntai
ned
ther
ein.
Rep
rodu
ctio
n, u
se o
r dis
clos
ure
to th
ird
Par
ties
with
out e
xpre
ss a
utho
rity
is s
trict
ly fo
rbid
den.
© S
iem
ens
Indu
stria
l Tur
bom
achi
nery
AB
Part Pos./Des. Document title Doc.Id
3F1 3718 20 administration building, UYA Indoor AC units & fresh air duct & grilles (K30-205HVAC-ASB1)
505 975
3F1 3719 20 administration building, UYA Outdoor units, fresh air unit & louvers (K30-205HVAC-ASB2)
505 976
3F1 3720 22 warehouse & 23 Maintenance shop UST Indoor units, exhaust fans & louvers (K30-217HVAC-ASB1)
505 977
3F1 3721 22 warehouse & 23 Maintenance shop UST Outdoor units (K30-217HVAC-ASB2)
505 978
3F1 3722 Control & Switches Panels Ware House (HVAC - ) 505 979
3F1 3723 27/8 security/unloading office Indoor units,fresh air duct,fans,louvers,grilles (K30-236 HVAC-1)
505 980
3F1 3724 AC units, exhaust fan, & louvers Sections/HVAC units (PS-HVAC-ASB1)
505 981
3F2 0101 GQA - Sewage and waste water system 3F2_11_00GQA
3F2 0201 Building Material 3F2_21_00UAB
3F2 0202 Building Material 3F2_22_00UYA_00UAB
3F2 0301 Building installation details 3F2_31_00UAB_00UYA
3F2 0302 Building installation details 3F2_32_00UAB_00UYA
3F2 0401 Electrical installation 3F2_41_00UZA_00UAB_00UYA
3F2 0501 SAC - Air-conditioning (HVAC) 3F2_51_00SAC10