��آ� ا���ز وا���� ا�ه���NATIONAL GAS INDUSTRIALATION COMPANY

GASCO

١

GASCO

NEW LPG FILLING PLANTS

INTRODUCTION

GASCO intends to build four new

LPG Filling Plants in the areas of� Jizan

٢

� Jizan

� Hail

� Al- Ahsa and

� Tabuk

About the Owner

� Gasco was founded in 1974 by merging 4 LPG filling and distribution

companies under the name of National Gas & Industrialization

company (GASCO).

� It is the only LPG filling and distributor company in Saudi Arabia. It

does not have a direct collaboration in LPG business.

٣

� It sells over 2 million cubic meters of LPG with a turnover of about

1.5 billion Saudi Riyals a year.

� Operate 7 filling plants, two operation departments, one cylinder

maintenance workshop over the Kingdom of Saudi Arabia, a fleet of

400 semi trailers in addition to 100 bobtails for LPG tanks refilling

supported by about 2000 employees of which 85% are Saudi.

About the Consultant

• INGAS is an engineering company based

in France. It provides the consultation and

the engineering work in LPG field

٤

• Today Mr. Xavier Fontova is representing

INGAS

About the Contractor

?????

٥

Locations

•TABUK

•Hail

Existing plants

٦

•Jizan

•Al-Ahsa

New plants

Locations

٧

Area in possession of GASCO in each site is:114,000 m² approximately (380 x 300 m).

Concrete buildings 3000m2Concrete buildings 3000m2

Steel structures 3500m2

Asphalt area 50000m2

Plant Lay Out

٨

Components of

Main AreaMain components of each plant will mainly consist of

the following:

� LPG mounded storage tanks area

� LPG loading and unloading area

٩

� LPG loading and unloading area

� LPG pumps, compressors, pneumatic, firefighting, water

� LPG cylinder filling hall

� Stock yard for handling (Empty and filled LPG cylinders)

� Stock yard (cylinders for maintenance & scrapping)

Scope of Work

Scope of work, including, but not limited to the following:

� Detailed Designing & Engineering

� Manufacturing

� Transportation

١٠

� Transportation

� Installation, Testing and Commissioning

� Training

� Safety & Security

� Documentation

Scope of Work(contd..)

Complete project design as follows:

� Process and Plant Design

� Final P&I and P&F diagrams

� Civil, Mechanical & Electrical works

١١

� Storage tanks

� Piping for LPG, pressurized air, industrial and potable

water

� Electrical works

� Instrument and Machinery

� safety installation & fire fighting

Scope of Work(contd..)

Complete detailed engineering design is required i.e. it should

include, but not limited to the following :

� Plot plans and locations

١٢

� LPG tanks & Water tanks

� All civil works inclusive of structural steel works

� Piping inclusive of all supports and ancillaries

Scope of Work(contd..)

Complete detailed engineering design is required i.e. it should include,

but not limited to the following :

� Electrical inclusive of grounding and protection systems

� PA/GA system

١٣

PA/GA system

� Fire fighting system & CCTV

� Instruments & Machinery

� Painting, coating and protecting of all surfaces

� Adequate air conditioning for Class A & B buildings

Scope of Work(contd..)

Utilities:

� Infrastructure for communication

� Power, control and lighting distribution

� Industrial and potable water system

١٤

� Industrial and potable water system

� Sewers with septic tank and water

treatment

� Plant for black water and dispersing pit for

rainfall and domestic use

Main Entrance

١٥

Main Entrance

١٦

Admin Building

١٧

Cylinder Stock Yard

١٨

Cylinder Stock Yard

١٩

Filling Hall Carousel

٢٠

Filling Hall Carousel

٢١

Loading/Unloading Area

٢٢

Loading/Unloading Area

٢٣

Mounded Tanks

٢٤

Mounded Tanks

٢٥

LPG Pump & Compressor Area

٢٦

Date of Call of

Tenders

• Expected time for call of tenders

• March 2011

٢٧

• March 2011

Thank you for your time and good luck