FY 2021-22 Budget PresentationWater Utilities DepartmentWater Business Unit
ID21-456, July 27, 2021
Overview
2ID21-456, July 27, 2021
IntroductionHistory Leadership Education Associations
City of North Las Vegas -
Started as a Meter Reader in
1993, left in 2010 as Water
Systems Supervisor
Servant leader – passionate
about serving my community,
my team and the
organization
Executive Master of Science
in Crisis and Emergency
Management
California Nevada Section
AWWA Chair Water
Distribution
City of Long Beach –
Manager Security and
Emergency Preparedness
2010 to 2013
Build collaborative
partnerships and teams
through honest
communication
Bachelor of Science in
Business Administration
Rocky Mountain Section
AWWA Chair 2019 to 2021
City of Westminster –
Utilities Operations Manager
2013 to 2021
Hold myself and others
accountable for following up
and following through
Colorado - Grade IV
Distribution Certification
Nevada – Grade III
Distribution Certification
AWWA National Chair –
Security and Emergency
Preparedness Programs
Committee 2013 to present
City of Denton – Director,
Water Utilities
2021 to present
Challenge my team to look
beyond the status quo and
embrace emerging
technologies to better serve
our community
Various certification through
the Federal Emergency
Management Institute
AWWA Board of Directors
Class of 2024
ID21-456, July 27, 2021
4
Leadership Team
5
Stephen D. GayDIRECTOR
Water Utilites
VacantASSISTANT DIRECTOR
Operations
Kim MankinAdministration Manager
Pritam DeshmukhASSISTANT DIRECTORAsset Management and
Infrastructure
ID21-456, July 27, 2021
Organizational Chart
6
Director of Water
Utilities
Stephen Gay
Asst Director Water
Utilities – Operations
Vacant
Superintendent
Field Operations
Casey Bowles
Superintendent
Water Production
Hector Ortiz
Superintendent
Water Reclamation
Rusty Willard
Water Utilities
Administration Mgr
Kim Mankin
Asst Director Water
Utilities - Asset Mgmt
and Infrastructure
Pritam Deshmukh
Superintendent
Vertical Infrastructure
Chris Campbell
Water Utilities
Asset Mgmt
Tyler Dawson
Senior Engineer
Stephen Moore
ID21-456, July 27, 2021
FTE Summary
FTEs FY 19-20 FY 20-21 FY 21-22
Water Administration 10 11 12
Utilities Administration
9.5 - -
Production 39 38 38
Distribution 29 27 26
Metering 18 18 18
Laboratory 5 5 5
Sustainability - 5.5 7.5
Total 110.5 104.5 106.5
7
• Net increase of 2 FTEs from Solid Waste Public Outreach to Sustainability
ID21-456, July 27, 2021
FY 2020-21 Focus Areas and Status Updates
▹ Major Maintenance
• Upgrades to Lake Lewisville Water Treatment Plant - To be completed FY 2021
• Raw Waterline Condition Assessment - Completed
▹ Infrastructure Improvements
• Lake Ray Roberts Water Treatment Plant Capacity Re-Rate and Performance Upgrades (20 MGD to 26 MGD) - Under design
• Northwest Booster Pump Station and Transmission Line Design -Completed
• North/South Water Pipeline I35 E to Scripture - Under construction
▹ New Technology – Improve Efficiency
• Advanced Metering Infrastructure (AMI) Assessment – In process
8ID21-456, July 27, 2021
FY 2021-22 Goals
▸ Complete – Lake Ray Roberts Water Treatment Plant Capacity Re-
Rate and Performance Upgrades (20 MGD to 26 MGD)
▸ Complete - Construction of the Northwest Booster Pump Station
and Transmission Line
▸ Complete - Construction of North/South Water Pipeline I35 E to
Scripture
▸ Relocate - Waterlines along I-35 corridor as part of the TXDOT’s
I35E widening project
▸ Revise - Emergency Response and Recovery Plan
▸ Survey - Distribution system to identify lead service lines in
compliance with the Lead and Copper Rule requirements
▸ Implement - Recommendations/if any from AMI study
▸ Develop - Asset Management Program for vertical infrastructure
9ID21-456, July 27, 2021
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
October November December January February March April May June July August September
Gallons X
1000
Axis Title
FY2021 Water Production
5 Year Average FY20 FY21 FY21 Budget
FY 2020-21 Operational Data
10
Storm Uri Impact –
Approx. 31 MG FY20
ID21-456, July 27, 2021
Water Volume Forecast
ID21-456, July 27, 2021
Water - Operational Data
12
Minor Maintenance
Activity FY18-19 FY19-20FY20-21
YTDFY20-21
ProjectedFY 21-22
Goal
FlushingHydrants
10,831 8,578 5,924 9,000 9,000
Replacing Meters
2,878 3,972 945 1,500 *
* AMI/AMR study will help define goal for next yearID21-456, July 27, 2021
Water - Operational Data
13
Major Maintenance (in linear feet)
Horizontal Project Delivery
Improvements
• Resource Allocation: Utilizing the
Capital Projects Team to Deliver
Major Maintenance (Horizontal
Infrastructure) projects
throughout the City.
• Aligning Utility Replacements
with Streets Rehabilitation
Program (part of the new bond
program)
Infrastructure Replacement
FY18-19 FY19-20FY20-21
YTDFY20-21
ProjectedFY 21-22
Goal
In House – W Crews
16,860 10,622 14,622 16,000 16,000
Delivered by Capital Projects
382 19,823 13,368 24,632 25,000
Total 17,242 30,445 27,990 40,632 41,000
ID21-456, July 27, 2021
Budget Highlights
14ID21-456, July 27, 2021
15
Water Financial Assumptions
Volume Forecast
• 2% growth forecasted in out years
• Hunter/Cole rate revenue included starting in FY 2023
Revenue
• 2% growth forecasted in out years
• Continue to utilize impact fee funding to revenue fund projects
• Forecast includes Hunter/Cole rate revenue
Expense
• 3% growth forecasted in out years
• Hunter/Cole expenses included
ID21-456, July 27, 2021
16
Water Revenue Detail
RevenuesFY 2019-20
ActualsFY 2020-21
BudgetFY 2020-21
EstimateFY 2021-22Preliminary
Water Sales Residential $20,375,255 $20,563,184 $20,160,324 $21,519,009
Water Sales Commercial 17,090,211 17,655,278 17,309,387 18,475,937
Water For Resale 1,612,230 1,360,648 2,258,977 1,423,894
Other Water 1,208,423 865,090 654,048 1,892,392
Cost of Service 1,149,991 1,676,882 1,676,882 2,033,275
Interest Operating 302,800 294,000 106,994 300,000
Impact Fee Transfer In 6,605,655 6,605,000 6,605,000 6,605,000
Total Revenue $48,344,565 $49,020,082 $48,771,612 $52,249,507
ID21-456, July 27, 2021
17
Water Expense DetailExpenses
FY 2019-20Actuals
FY 2020-21Budget
FY 2020-21Estimate
FY 2021-22Preliminary
Personnel Services $8,139,916 $8,652,990 $8,038,035 $8,798,948
Materials & Supplies 1,472,974 1,747,819 1,623,604 1,776,571
Maintenance & Repair 1,477,259 1,804,365 1,676,132 2,203,508
Insurance & Miscellaneous 418,454 575,574 575,574 576,253
ROI & Franchise Fees 3,301,557 3,364,225 3,125,135 3,520,601
Operations & Purchased Power 3,112,141 3,763,059 3,495,624 3,806,885
Debt Service 12,879,020 11,064,205 11,064,205 10,835,105
Cost of Service 4,896,659 5,262,865 5,262,865 5,709,734
Capital Outlay 13,838,194 16,709,105 16,709,105 13,700,759
Total $49,536,174 $52,944,207 $51,570,279 $50,928,364
ID21-456, July 27, 2021
18
Water Expense Detail By Division Expenses
FY 2019-20Actuals
FY 2020-21Budget
FY 2020-21Estimate
FY 2021-22Preliminary
Admin $2,166,108 $3,072,695 $2,952,203 $2,841,323
Utility Admin 1,059,645 - - -
Sustainability - 883,592 848,943 975,603
Production 11,982,259 12,616,442 12,121,701 12,679,235
Distribution 6,835,289 11,186,324 10,747,664 7,620,776
Metering 2,407,953 3,293,464 3,164,314 3,222,630
Lab 531,164 619,962 595,651 647,092
Debt Service 12,879,020 11,064,205 11,064,205 10,835,105
Transfers/ROI/Franchise Fees 11,557,418 10,207,523 10,075,598 12,106,600
Total $49,418,856 $52,944,207 $51,570,279 $50,928,364
ID21-456, July 27, 2021
19
Water Ten-Year Forecast
*No forecasted rate increasesID21-456, July 27, 2021
Water FY 2020 FY 2021 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031
Actual Budget Estimate Preliminary Projected Projected Projected Projected Projected Projected Projected Projected Projected
Beginning Water Fund Balance 21,153,243$ 22,344,852$ 22,344,852$ 19,546,185$ 20,867,329$ 20,611,272$ 20,733,942$ 26,094,431$ 30,247,925$ 31,900,494$ 28,654,783$ 24,989,412$ 21,824,127$
Water Revenues
User Charge Revenue
Minimum Charge 9,960,334$ 9,067,166$ 9,067,166$ 9,929,253$ 10,115,638$ 10,305,751$ 11,040,656$ 11,249,270$ 11,462,056$ 11,679,097$ 11,900,480$ 12,126,290$ 12,356,616$
Volumetric Charge 29,099,520 29,938,774 29,190,305 31,489,588 33,469,287 34,138,673 34,821,446 35,517,875 36,583,412 37,315,080 38,061,381 38,822,609 39,599,061
Water Miscellaneous Revenue 2,679,711 3,409,142 3,909,142 4,225,667 4,313,066 4,397,487 4,483,466 4,571,295 4,568,998 4,660,378 4,753,586 4,848,657 4,945,631
Impact Fee Transfer 6,605,000 6,605,000 6,605,000 6,605,000 6,605,000 6,605,000 6,605,000 6,605,000 6,605,000 6,605,000 6,605,000 6,605,000 6,605,000
Total: Revenues 48,344,565$ 49,020,082$ 48,771,612$ 52,249,507$ 54,502,991$ 55,446,912$ 56,950,569$ 57,943,440$ 59,219,465$ 60,259,555$ 61,320,447$ 62,402,556$ 63,506,308$
Use of Reserves 1,191,609$ 3,924,125$ 2,798,667$ -$ 256,058$ -$ -$ -$ -$ 3,245,711$ 3,665,371$ 3,165,286$ 3,007,911$
Total Resources 49,536,174$ 52,944,207$ 51,570,279$ 52,249,507$ 54,759,049$ 55,446,912$ 56,950,569$ 57,943,440$ 59,219,465$ 63,505,266$ 64,985,817$ 65,567,842$ 66,514,218$
Revenue Requirements
Operating Expenditures 14,749,532$ 16,543,807$ 14,913,310$ 16,798,128$ 17,302,072$ 17,821,134$ 18,355,768$ 18,906,441$ 19,473,634$ 20,057,843$ 20,659,578$ 21,279,366$ 21,917,747$
Transfers 4,896,659 5,262,865 5,519,434 5,709,734 5,881,026 6,057,456 6,239,180 6,426,356 6,619,146 6,817,721 7,022,252 7,232,920 7,449,907
Franchise Fee 1,942,028 1,978,956 1,978,956 2,070,942 2,179,246 2,222,221 2,293,105 2,338,357 2,402,273 2,449,709 2,498,093 2,547,445 2,597,784
Return on Investment Fee 1,359,420 1,385,269 1,385,269 1,449,659 1,525,472 1,555,555 1,605,174 1,636,850 1,681,591 1,714,796 1,748,665 1,783,211 1,818,449
Capital Projects (Rate Funded) 9,870,305 13,984,105 13,984,105 10,033,768 10,319,345 8,997,791 4,684,190 4,808,631 7,250,000 7,467,500 7,691,525 7,922,271 8,159,939
Impact Fee Project Revenue Funding 3,839,210 2,725,000 2,725,000 3,500,000 3,000,000 2,725,000 2,725,000 3,500,000 3,500,000 3,500,000 3,500,000 3,500,000 3,500,000
Debt Service 12,879,020 11,064,205 11,064,205 10,835,105 14,120,220 15,513,415 15,255,995 15,741,643 16,208,584 21,066,029 21,434,036 20,870,961 20,638,725
Supplemental Packages - - - 531,028 431,668 431,668 431,668 431,668 431,668 431,668 431,668 431,668 431,668
Total: Revenue Requirements 49,536,174$ 52,944,207$ 51,570,279$ 50,928,363$ 54,759,049$ 55,324,241$ 51,590,080$ 53,789,946$ 57,566,897$ 63,505,266$ 64,985,817$ 65,567,842$ 66,514,218$
Current Revenue Surplus/(Deficit) -$ -$ -$ 1,321,144$ -$ 122,671$ 5,360,488$ 4,153,495$ 1,652,569$ -$ -$ -$ -$
Ending Water Fund Balance 22,344,852$ 18,420,727$ 19,546,185$ 20,867,329$ 20,611,272$ 20,733,942$ 26,094,431$ 30,247,925$ 31,900,494$ 28,654,783$ 24,989,412$ 21,824,127$ 18,816,216$
Capital Project Reserve -$ -$ -$ -$ -$ -$ 5,000,000$ 9,000,000$ 10,000,000$ -$ -$ -$ -$
Rate Increase 0% -2% -2% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Reserves
Minimum Target Fund Balance (120 days) 16,285,865$ 17,406,315$ 16,954,612$ 16,494,116$ 18,599,496$ 19,451,354$ 18,539,206$ 18,877,649$ 19,249,791$ 19,001,945$ 19,379,340$ 19,548,957$ 19,836,279$
Maximum Target Fund Balance (180 days) 24,428,798$ 26,109,472$ 25,431,918$ 24,741,175$ 27,899,244$ 29,177,031$ 27,808,809$ 28,316,474$ 28,874,687$ 28,502,918$ 29,069,010$ 29,323,435$ 29,754,419$
Impact Fee Capital Reserve 9,000,000$ 9,000,000$ 9,000,000$ 9,000,000$ 9,000,000$ -$ -$ -$ -$ -$ -$ -$ -$
Impact Fee Reserve 4,076,000$ 4,076,000$ 4,076,000$ 4,076,000$ 4,076,000$ 4,076,000$ 4,076,000$ 4,076,000$ 4,076,000$ 4,076,000$ 4,076,000$ 4,076,000$ 4,076,000$
Development Plan Lines 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$
20
Water 5-Year Capital Plan
FY 2022 FY 2023 FY 2024 FY 2025 FY 2026
Debt Funded Capital 34,491,460$ 42,362,363$ 33,013,181$ 5,910,987$ 6,700,796$
Revenue Funded Capital 9,310,943 9,596,520 8,274,966 3,961,365 4,085,806
Aid in Construction 265,788 265,788 265,788 265,788 265,788
Impact Fee Funding 3,500,000 3,000,000 2,725,000 2,725,000 3,500,000
Vehicle Replacement Fund 309,855 480,170 454,509 248,506 659,434
Total 47,878,046$ 55,704,841$ 44,733,444$ 13,111,646$ 15,211,825$
Water CIP Summary
ID21-456, July 27, 2021
21
Water 5-Year Capital Plan (cont.)
Major Projects FY 21-22 Amount Funding Type Project Status
Northwest Transmission Lines & Booster Pump
Station$14,900,000 Debt
Design Completed
Bid - October 2021
Ray Roberts Capacity Re-Rate and
Performance Upgrades $11,000,000 Debt
Under Design (30%)
Bid – January 2022
2019 Bond Election Projects $4,095,338 Debt Under Design
Annual Field Service Replacements $2,847,693 Revenue Under Design
Lake Lewisville Treatment Plant Administration
Building$2,500,000 Revenue
Design (90%)
Bid – October 2021
Total $35,343,031
ID21-456, July 27, 2021
Budget Requests
22ID21-456, July 27, 2021
23
Supplemental Package Summary
Package TitleRequested
ByOne-time
CostRecurring
CostFY 2021-22
TotalNotes
System Repair Materials Distribution - $25,000 $25,000 Increased Materials Costs
License Incentives Multiple - $8,500 $8,500 Employee Retention
Fire Hydrant Maint. Distribution - $30,000 $30,000
Increased Effort Impacting Maintenance Workload
Line Locating Distribution - $150,000 $150,000Increased Effort Impacting Maintenance Workload
Street Rehab Distribution - $200,000 $200,000 Streets Workload
Total $413,500 $413,500
ID21-456, July 27, 2021
24
Next Steps
• August 3, 2021 – City Council Budget Workshop
• September 21, 2021 – City Council Adopts Budget, Tax Rate, Rates and Capital
Improvement Plan
ID21-456, July 27, 2021
Questions?
25ID21-456, July 27, 2021