Funding Sustainable Public Transport in Amsterdam

Covenant of Mayors Investment Forum

21 February 2018

Talitha KoekCSR Manager

2|

GVB and the ELENA Investment Programme

GVB: 117 years of Amsterdam public transport

4|

Amsterdam’s rapid growth

Development locations

722 731 742 768 822 871 896

1995 2000 2005 2010 2015 2020 2025

Population growth Amsterdam (‘000 )+/+ 9%

4,55,3

6,7

2005 2010 2014

Tourists (mln/jr)+/+ 9%

Jobs in Amsterdam (‘000)+/+ 3%

375 393 404

154 172 209

2010 2015 2020

Banen Amsterdammers

Banen Forensen

Estimated 1 million daily travellers by 2020

1. Amstelveenlijn

2. Uithoornlijn

3. Vertramming lijn 15 4. IJ-tram

5. IJburg 2e fase8. Oosttangent

7. Westtangent

15. Noord-Buiks.ham

16. Noord-Overhoek

14. Station Sixhaven

10. Sluiten kleine ring

12. Schinkel-fase 2

11. Schinkel-fase 1

6. Oost-West lijn

9. Vertramming lijn 21

13. Vaker rijden

MetroTramBus

6|

We need to facilitate this growth in a sustainable way

Sustainability as strategy: GVB helps the City of Amsterdam toachieve its sustainable goals Providing sustainable mobility for residents and

visitors alike Fewer cars and car miles Keeping the city accesible: fewer traffic jams Cleaner air Less noise pollution More efficient use of public space Cutting CO2-emissions for the city

7

Zero emission buses and ferries are key for clean air and lowering emissions

Our goal: by 2025, our entire fleet is electric (buses, ferries) or hybrid (ferries)

8

Electricity is 100% renewable and starting2019, additional

9

10|

ELENA Investment Programme for GVB Overview

• Runs 4 years, from 1 October 2017 – 1 October 2021• Total Investments € 165.8 Million• Total funding € 3.9 Million, of which €3.5 M from ELENA en €0.4

from GVB

Reducedemissions:

(t CO2 eq/year)

Reducedemissions:(t Nox/year)

Reduced energy usage

(GWh/year)16.600 66.9 102.6

ELENA will help us with 4 projects

Metro: Pinpointing energy efficiency opportunities in themetro system and incorporating these into the operation

Smart City IT: Develop smart IT solutions for first and last mile, making public transport more attractive

Zero Emission Buses: Speed up our learning curve for theintroduction of over 200 zero emission buses

Ferries: Putting 8 more hybrid or electric ferries intooperation, retrofitting 4 more

11

12|

Metro & Regenerative Energy ELENA facts

• Total investment costs € 33.0 Million EUR• Technical Assistance costs € 472,000 EUR

Reducedemissions:

(t CO2 eq/year)

Reducedemissions:(t Nox/year)

Reduced energy usage

(GWh/year)0 0 38.0

13|

ELENA Investment

The Metro & Regenerative Energy investment program aims at

specifying, procuring and deploying a braking energy recovery

system for the metro which will enable GVB to maximize the

recuperation of energy. Investments in both infrastructure and

metro.

Study into measures:

Energy storage at stations

Regenerative Energy in metro

Internal redistribution via the 10 kV grid

Example from National Railways

15|

Smart City IT InfrastructureELENA facts

• Total investment costs € 12.3 Million EUR• Technical Assistance costs € 1,175,000 EUR

Reducedemissions:

(t CO2 eq/year)

Reducedemissions:(t Nox/year)

Reduced energy usage

(GWh/year)N/A N/A N/A

• Total estimation of accumulated modal shift: 5.100 CO2 eq/ year

16|

IntegratedMobility

Snel: snelle en hoogfrequente verbindingen op drukke trajecten

Flexibel: fijnmazig en op afroep beschikbaar aanbod van gedeelde vervoersopties

Gemakkelijk: naadloze integratie van het mobiliteitsaanbod

1

2

3

4Duurzaam:Minimale impact op omgeving en milieu

Travel information is the basis for MaaS

17

•Other PTOs•PTAs•Non-PT partners

•Flexibility•Outgoing & incoming

•Short TTM

•On stops•In vehicles•Short TTM

• Big Data & analysis

• Re-organize• More info

content Information Quality

Information Channels

New PartnershipsOpen Data

Ready for MaaS

18|

Zero Emission BusesELENA facts

• Total investment costs € 87.5 Million EUR• (internal) Technical Assistance costs € 521,672 EUR• (external) Technical Assistance costs € 1,626,000 Million EUR

Reducedemissions:

(t CO2 eq/year)

Reducedemissions:(t Nox/year)

Reduced energy usage

(GWh/year)7,050 15.8 17.4

19

Up to 67 new zero emission buses (long term goal: entire bus fleet)

1. Overall feasibility study to be conducted2. Separate study per batch for most appropriate technology, migration

strategy and procurement methods3. Overall migration strategy towards 2024 in batches, first batch

replacement of ~28 buses

Scope of ELENA project

Feasibility study

20

Where are we now?

21

First batch of 31 OC buses, plus small scale project for 2 battery depot charging buses Based on impact analysis, lead time, bus routes considered Corresponds with municipality and transport authority preferences

Procurement started February 2018 Project structure for first batch: learning project GVB staff employed in project where possible Joint effort with municipality at infrastructure/vehicle interface

Project structure for further migration strategy towards 2024 Tie-in with transport authority strategy for greater Amsterdam

region External staffing and expertise

22|

Plug-in/hybrid ferriesELENA facts

• Total investment costs € 33.0 Million EUR• Technical Assistance costs € 100,000 EUR

Reducedemissions:

(t CO2 eq/year)

Reducedemissions:(t Nox/year)

Reduced energy usage

(GWh/year)4.500 50.2 13.5

The NZK ferrylines:5 vessels up to 80 years oldReplaced by Full Electric by 2022

23

The ferrylines on ‘t IJ: 12 vessels converted to hybrid by 20253 additional hybrid vessels

24

In short: when to finance projects withELENA?

Accelerating investments Adding excellent knowlegde and advice to projects Co-creation outside existing programmes, together

with EIB Starting as early as possible

25

Q&A