full vs emergency closure technical memo
Post on 05-Apr-2018
225 Views
Preview:
TRANSCRIPT
-
7/31/2019 Full vs Emergency Closure Technical Memo
1/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
2/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
3/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
4/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
5/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
6/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
7/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
8/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
9/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
10/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
11/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
12/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
13/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
14/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
15/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
16/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
17/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
18/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
19/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
20/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
21/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
22/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
23/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
24/25
-
7/31/2019 Full vs Emergency Closure Technical Memo
25/25
Considerations for maintaining northboundState Street during construction.
Facilitates the morning peak traffic movements into the city. Allows for commuters to have consistent arrival times for work and school. Supports the downtown business district. Provides access through the construction zone for non-motorized traffic.
Preliminary & Advisory URS CorporationNov 17, 2006
Considerations for maintaining westboundStadium Boulevard during construction.
Maintains the inbound route in the morning commute to Pioneer High School. This aides in
assuring that the start times for the school will be maintained by consistent bus arrivals. Maintains access by both the westbound and eastbound Stadium Avenue traffic to the University parking facilities located east of the stadium and the golf course to the south.
Provides the necessary facilities for non-motorized access through the construction area. No viable alternatives for detouring of non-motorized traffic around construction site. Maintains the westbound truck route and the integrity of truck access to State Street (via
Stimson).
top related