from serving to driving indonesia's growth - eibd … 2014... · from serving to driving...

Post on 02-Feb-2018

220 Views

Category:

Documents

3 Downloads

Preview:

Click to see full reader

TRANSCRIPT

From serving to driving Indonesia's growth

R.J. LINO President Director

PT. Pelabuhan Indonesia II (Persero)

Delivering lasting transformation at IPC

EU-INDONESIA BUSINESS DIALOGUE

Jakarta, 19th November 2014

2 | Energizing Trade. Energizing Indonesia

BELAWAN (NEW BELAWAN)

JAKARTA

SURABAYA

MAKASSAR

SORONG

Malahayati

New KalBar Port

Pulau Baai

Tarakan

New Bali

Kendari

Kupang

Ambon Nabire Jayapura

Main Sea-Corridor

Sibolga Dumai

Lombok

Pantoloan

Marauke

Gorontalo

Ternate

Manokwari

Sumber: IPC (2012)

Loop Aceh

Loop Pantai Timur Sumatera

Loop Babel and West Kalimantan

Loop Pantai Barat Sumatera

Loop East Kalimantan

Loop West Nusatenggara

Loop West Sulawesi

Loop East Nusatenggara

Loop North-East Sulawesi and North Maluku

Loop Maluku and South-West Papua

Loop North Papua

SEA TOLL PROGRAMS

Maritime Logistic Sector Reform to Support “Sea Toll” Program:

3 | Energizing Trade. Energizing Indonesia

• Port sector reform

• Shipping sector reform

• Dock yard sector reform

• Navigation Aid sector reform

• Logistic sector reform

• Maritime education sector reform

4 | Energizing Trade. Energizing Indonesia

Port Sector Reform : • World Class Port Operations:

• Reducing Dwelling Time;

• Human Resources Development;

• Build new ports, Development of Existing Ports, and Re-

modelling of Existing Ports.

5 | Energizing Trade. Energizing Indonesia

1. World Class Port Operations

• 24/7 all Pelindo Port (111 Ports)

• Implementation of INAPORT (IT) within 3 months at Tanjung Priok,

Tanjung Perak, Belawan, and Makassar, and followed by other ports

(107)

• Implementation of IT terminal operating system at all domestic

container terminals

• Implementation of truck booking system at Tanjung Priok

• Review port tariff structure and all ports regulations

• Implement basic safety requirement

6 | Energizing Trade. Energizing Indonesia

2. Reducing Dwelling Time

• Reduce average import dwelling time from 6 days to 3 days with 3

days standard deviation at Tanjung Priok, Tanjung Perak, Belawan,

Semarang, and Makassar

• Reduce average domestic dwelling time from 2 – 14 days to 1 days

• Implementation of full INSW (Tradenet and Inaportnet) in Tanjung

Priok

7 | Energizing Trade. Energizing Indonesia

3. Human Resource Development

• IPC Corporate University (maritime, port, and logistic) will be in

operation at the beginning of 2015

• Re-training of 10.000 port employees

8 | Energizing Trade. Energizing Indonesia

4. Development of New Ports:

a. Capacity 10.000 TEU, draft - 15.5 meter :

• Kuala Tanjung - Sumatera Utara (3000 ha industrial area & CDC)

• Sorong - Papua Barat (7500 ha industrial area & CDC)

b. Capacity 5000 TEU, draft - 13.50 meter :

• Tanjung Api Api – South Sumatra (3000 ha industrial area and CDC)

• Kijing - New Deep water Port at West Kalimantan (3000 ha industrial area and CDC)

• South Kalimantan new port close to Laut Island (3000 ha industrial area and CDC)

• New Port Bali ( 1000 ha industrial area and CDC )

• New Dumai (3000 ha industrial area and CDC)

• New Maluku (3000 ha industrial area and CDC)

9 | Energizing Trade. Energizing Indonesia

c. Capacity 3000 TEU, draft -12.50 meter

• South East Sulawesi (1000 ha industrial area and CDC )

• Gorontalo (1000 ha industrial area and CDC)

• Jayapura (1000 ha industrial area and CDC)

• New Aceh (3000 ha industrial area and CDC)

d. Industrial port:

• Bojonegara - Banten (500 ha industrial area)

10 | Energizing Trade. Energizing Indonesia

5. Development of Existing Ports:

a. Capacity 10.000 TEU, draft - 15.5 meter • New Makasar – South Sulawesi • Tanjung Perak – Surabaya

b. Capacity 5000 TEU, draft - 13.5 meter • Teluk Bayur – West Sumatra • P.Baai – Bengkulu • Pantoloan – Central Sulawesi • West Sulawesi • Balik Papan – East Kalimantan

c. Capacity 3000 TEU, draft - 12.50 meter • Lembar – Lombok • Kupang – NTT • Belawan – North Sumatra • Ternate – North Maluku

11 | Energizing Trade. Energizing Indonesia

d. Capacity 1000 TEU, draft - 10 meter • Marokeh – Papua • Tual – Maluku • Saumlaki • Luwuk-Central Sulawesi • Maumere – NTT • Sibolga – North Sumatra • Melaboh – Aceh

e. Develoment of CDC 1000 ha at North Kalibaru, and construction of LNG terminal at north of "Newpriok Project Development"

12 | Energizing Trade. Energizing Indonesia

6. Remodeling Existing Ports:

a. Capacity 5000 TEU, draft - 13.50 meter • Bitung – North Sulawesi

b. Capacity 3000 TEU, draft -12.50 • Ambon - Maluku

c. Conversion of existing Benoa port – Bali : • Cruise hub port and marina

KIJING – International Port in West Kalimantan Development project

OVERVIEW

14 | Energizing Trade. Energizing Indonesia

PHASE 1

15 | Energizing Trade. Energizing Indonesia

PHASE 2

16 | Energizing Trade. Energizing Indonesia

NewPriok Port Development

NewPriok terminal development plan

18 | Energizing Trade. Energizing Indonesia

CT 1

SUPPORTING AREA

CT : Container Terminal PT : Product Terminal

PHASE I (2012 – 2017)

PHASE II (2018 – 2030)

CT1 will start in 2014

Port Access Road Project

19 | Energizing Trade. Energizing Indonesia

Logistics

Center

NewPriok terminal development plan

PILING OF CONTAINER YARD 1A

20 | Energizing Trade. Energizing Indonesia

PILING OF CONTAINER YARD 1A

21 | Energizing Trade. Energizing Indonesia

PILING OF CONTAINER YARD 1A

22 | Energizing Trade. Energizing Indonesia

ACCESS ROAD

23 | Energizing Trade. Energizing Indonesia

ACCESS ROAD

24 | Energizing Trade. Energizing Indonesia

ACCESS ROAD

25 | Energizing Trade. Energizing Indonesia

SLOPE PROTECTION

26 | Energizing Trade. Energizing Indonesia

SLOPE PROTECTION

27 | Energizing Trade. Energizing Indonesia

SLOPE PROTECTION

28 | Energizing Trade. Energizing Indonesia

SLOPE PROTECTION

29 | Energizing Trade. Energizing Indonesia

ACCESS ROAD

30 | Energizing Trade. Energizing Indonesia

KALIBARU ACCESS ROAD

Trase Lama

Trase Baru Daerah

Pemukiman Yang Perlu Di Relokasi

KALIBARU ACCESS ROAD

Tol Cibitung – Cilincing Acquisition Plan

34 | Energizing Trade. Energizing Indonesia

Connecting port and logistic park and industrial area

35 | Energizing Trade. Energizing Indonesia

Logistics

Center

KARAWANG INTERNATIONAL INDUSTRIAL CITY

JABABEKA INDUSTRIAL AREA

KAWASAN BERIKAT NUSANTARA (KBN)

JORR2

36 | Energizing Trade. Energizing Indonesia

Logistics

Center

Panjang

Jayapura

,

21 Required : US$ 7 Billion

Aceh

P.Baai

Jambi

Kupang Lembar

3000 TEU vessels

Belawan Kuala Tanjung

1000 TEU vessels

Meulaboh

Tanjung Api-api

20.000 TEU vessels

Luwuk

Bau-bau

Tarakan

Gorontalo

Sulbar

Kalteng

New Bali

Sumbawa

Sumba

Maumere

Manokwari

Nabire

Kaimana

Merauke

Biak

Masohi

Ternate

Tobelo

Tual Saumlaki

Sibolga

Benoa-Bali dikonfersi menjadi Hub-Port untuk Cruise dan Marina

top related