from ar till output vat planning in fm

Post on 23-Jan-2018

139 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

TRANSCRIPT

AR, input DPR, input DP,

input FP, Output VAT and

FG/Good stock level

planning in FM (one time)

Anatoly Ryabukha

FMCYCOPI_CO: From CO (Revenue + COGS) x 3

times: PB, CB, FB

FMCYCOPI_CO: From CO (Revenue + COGS) x 3

times: PB, CB, FB

PB: BS & P&L by nature (the same in CB, FB)

PB: BS & P&L by nature (the same in CB, FB)

PB: BS & P&L by nature (the same in CB, FB)

PB: BS & P&L by nature (the same in CB, FB)

PB: BS & P&L by nature (the same in CB, FB)

PB: BS & P&L by nature (the same in CB, FB)

PB: BS & P&L by nature (the same in CB, FB)

PB: Indirect CF (the same in CB, FB)

PB: SVA (the same in CB, FB)

PB: SVA (the same in CB, FB)

top related