Excellence in aeration control -for energy efficient operation & improved process control
Hassan Ragab, Alterous – Partner of BINDER Group
1
© BinderGroup Germany
Existing wastewater treatment plants have following needs:
▪ Treatment capacity – growing population, increaseconnection rate
▪ Effluent quality – re-use for irrigation
▪ Check in needs for • refurbishment of existing equipment
• expansion (new tanks, new technologies e.g. MBBR)
Actual Situation
EGYPT
2
© BinderGroup Germany
Challenges:▪ comparable higher investment costs▪ proper design of components & system integration▪ Skills of operational staff
Chances:▪ high quality effluent (re-use agriculture)▪ digestation o sludge reduces load to biological treatment of 1/3▪ energy efficient operation & very low carbon footprint▪ sustainable investment
Technologies
Wastewater treatment in activated sludge plants
3
© BinderGroup Germany
15%
11%
4%4%
1%Aeration
Solid Handling
WW Pumping &Primary Clarifier
Secondary Clarifier& RAS Pumping
Lighting & Bldgs
Headworks
4
Total Energy Consumption in WWTPs
Data from WEF MOP 32 (2009)
Aeration65%
© BinderGroup Germany
4
We focus on aeration!
5
Blower1
Flow meter2
Control valve3
Control system 6
Sensors (DO, NH4-N, NO3-N) 5
Diffuser, Mixer4
Biological Aeration System
Components Aeration System
Aeration System
© BinderGroup Germany
Target values for efficient systems: <15 kWh/ PE/ year for the aeration system<25 kWh/ PE/ year for the whole plant
6
Valve-Control-Massflow - VACOMASS®▪ Thermal mass flow meters
▪ Jet control valves – Patented, pressure recovery up to 75%
▪ Diaphragm control valves
▪ Aeration controller, flexcontrol including “flex algorithm” with Artificial Intelligence (AI)
Specially designed for biological process in wastewater treatment industry
VACOMASS® Product Line
Patented
© BinderGroup Germany
Patented
WWTP Songshen Phase I (CN)
Stable DO-Control in tank 1, zone M3 (start-up 2018)
13.11.2018 14.11.2018 15.11.2018 16.11.2018 17.11.2018 18.11.2018
DO-ACT mg/l DO-SET mg/l Stroke % 1.7 +/- 0.3 mg/l
7
© BinderGroup Germany
0,1640,174
0,1470,128 0,123 0,120 0,120
0,000
0,050
0,100
0,150
0,200
0,250
3月 4月 5月 6月 7月 8月 9月
Energy consumption of blowers
FINE TUNINGBEFORE START UP
energy consumption reduced for 28.4%
March April May June July August September
WWTP Songshen Phase I (CN)
Reduction in energy consumption of blower
8
© BinderGroup Germany
Total nitrogen concentration in the effluent is reduced for 20%
TIME May June July August September October
AVG 10.66 11.53 10.46 9.93 8.24 8.81
MAX 14.33 13.07 11.63 12.39 10.39 10.91
MIN 8.88 8.90 8.10 6.11 6.26 6.93
9
WWTP Songshen Phase I (CN)
Improvement of effluent quality
© BinderGroup Germany
10
Improvement due to PI2D-AI and ABAC
C-Dosing 22.4 %
COD reduction 24.3 %
NH4 reduction 30.4 %
NO3 reduction 52.9 %
Energy savings 19.0 %5-month comparison
Water inflow 30,000 m³/d2 lines – 2 zones each
WWTP Songshen Phase I (CN)
Reduction of chemical´s consumptionResults: reduction of total nitrogen in the effluent with 19% less energyconsumption plus 22% savings in chemicals
© BinderGroup Germany
▪ Advanced aeration controller• Automatic parameter adjustment through AI
• Eliminates disturbing factors due to load changes
• Control, maintenance and monitoring functions
▪ High control quality• Typical max. DO-deviation +/- 0.3 mg/l
▪ Proven improvement total N• Precise aeration control: 15 – 30 %
▪ Proven energy savings• Precise aeration control: 10 – 40 %• Precise control valve, low Δ p: 5 – 15%• Sliding header pressure: 8 – 10 %• Ammonia-based DO-SET: 8 – 20 %
Process safety
Equipment safety
Energy savings Control quality
Quality features of aeration control
Summary results
Conclusions
© BinderGroup Germany
11
Target value15 kWhr/ PE/ year
Actual reality> 50 kWhr/ PE/ year
12
Worldwide References
Amsterdam (NL)
Vienna (AUT)*
Auckland (NZ)*
Ulm (GER)
Gent (BE)*
Shanghai (CN)*
Dortmund (GER)
Milano (IT)
Hamburg (GER) Berlin (GER)
Arnhem (NL)
Beijing (CN)*
Singapore (SGP)
© BinderGroup GermanyMunich (GER)*
Cleveland (USA)
14
Manuela CharatjanManager Process Engineering
Binder GmbHBuchbrunnenweg 1889081 Ulm, GermanyTel. +49 731 18998 - 39support@bindergroup.infowww.bindergroup.info
Your direct contact to us!
Hassan RagabCEO
ALTEROUS 2008 Al-Batha TowerBuhierah Cornish RoadP.O. Box 60699, Sharjah, UAETel. +971 50 626 9581hassan@alterous.com www.alterous.com
Please feel free to contact us directly
© BinderGroup Germany