final project: bridge building
Post on 23-Feb-2016
47 Views
Preview:
DESCRIPTION
TRANSCRIPT
Final Project:Final Project:Bridge BuildingBridge Building
Lior ShimonovichLior Shimonovichandand
Adam DrozdowskiAdam Drozdowski
Possible DesignsPossible Designs
Suspension
Flatbed
Why we chose flat….Why we chose flat….- StabilityStability- Easier to buildEasier to build- LighterLighter- TimeTime- Material contraintsMaterial contraints
The building processThe building process
-Glue sticks together
The building process (cont’d)The building process (cont’d)
-stick units together by glue
main structure
The building process (cont’d)The building process (cont’d)
The building process (cont’d)The building process (cont’d)
-The polymers were super-glued onto the bridges main structure
-Everything is clamped down
The building process (cont’d)The building process (cont’d)
The building process (cont’d)The building process (cont’d)
The building process (cont’d)The building process (cont’d)
-Road surface
The building process (cont’d)The building process (cont’d)
-More reinforcement
In ConclusionIn Conclusion
Our bridge can hold…