FIDESTO PROJECTS PRIVATE LIMITED

FEW GLIMPSES OF THE GOOD CONSTRUCTION PRACTICES BEING ADOPTED BY FIDESTO

Version iv. Aug’18

SITE LOGISTICS & DISPLAYS

Version iv. Aug’18

View of Site with Planned logistics4

Mechanical Cutting and Bending Work for Re-Steel Site Office

Site OfficeSteel cutting area Barricaded

5

View of Main Entrance Gate to Site

Display Boards at Main Entrance with Names & Logos of the Project Team

Display Board at Main Entrance with Local Authorities and Sanction

Details

6

Batching Plant and Concrete Pump: Ease of Conveyance of Concrete and control on

Quality

7

QUALITY CONTROL&

EXECUTION WORK

8

Hassle Free Movement and Branching of Services

Sleeve Fixing in position, before Slab RCC

Sleeve position After De-shuttering

MS Tubes and Props for Maintaining Proper Level of Slab

Slab Shuttering Supported On Acro-Span

Column Shuttering Supported by Props, Waller & Tie Rods

10

Access to Working Slab

Providing tape at shuttering joint to make it leak proof.

11

Kota stone fixed at Staircase Treads are being

covered by PE Sheet

Stacking of Shuttering Material after de-

shuttering completion

Finished Concrete Surface Sleeves for Services

Anti-Termite Treatment Soling work with Proper level and Specs

12

Testing Equipment in Quality Lab

Testing of MS Binding Wire

Checking Soling Stone Size

13

Cube Compressive Strength Test

14

Covering of Tile flooring with PE sheetShear keys in green concrete

Encouraging best quality Equipments

Encouraging latest plumbing techniques

Drip Curing Method adopted to ensure proper and curing

Covering all Door, windows and installed electrical accessories and floor by Tarpaulin sheet before painting work

Using wastage AAC Blocks for temporary closing of openings like lift shafts etc.

Protection of Doors and Windows track by using plywood scrap

Covering the area treated with ATT till soling is started to avoid percolation/

seepage of Water

Curing Tank for Concrete cubes

Plate Vibrator For Compacting Cover Blocks

Making of Cover Blocks at Site 20

Field Dry Density TestSlump Cone Test for Workability of Concrete

21

AAC Block test before unloading at site Checking Viscosity of paint at site

Quality Training Programs Conducted at site

22

Planned and Clutter free Routing of Services above terrace

Providing platform for Maintenance in Services Shaft-using Scrap Material

Providing Bumps at Main Entrance to reduce speed of incoming

vehicle and to prevent the ingress of surface runoff.

Application of crack Bridging paint on the external

surface of the Building

Application of Epoxy Putty on external MS Structural members

followed by Epoxy Primer and paint for its durability.

27

Covering of Tile flooring with PE sheetBeam And Cantilever Support System

Circular Cover blocks For Piling

PCC Below Pile Cap , Pile RCC Protected

Pile Cap Casting

Hard Strata SamplePiling by Rotatory Method

Use of Weber Blokset as mortar for AAC Blockwork laid with MS strip mould

Broom Finish on Slab

Curing

29

30

Plumbing Works in Toilets

Concealed piping

Testing of Concealed pipes

Water Proofing in Toilet Area

31

Base Treatment Brickbat Coba

Final Coat Testing of Waterproofing

32

Cement Board

Material Sampling

External Paint

Electrical Material

Covering of Glass for reducing temperature effect in working

areas

Fire Fighting System Protection from external

weather conditions

Fixing FRP Manhole & Drain Covers instead of Regular

RCC Covers

Double Layer Lift Protection using 6mm thk MDF Board

Covering scaffolding by Tarpaulin sheets during plaster to External

face of Building to avoid nuisance to vicinity/surrounding locality

Creating a difference in floor Levels of Covered areas with respect to the exposed One to avoid Rain water to enter inside

Testing of Sewer line and Storm Water Lines for leakages if any.

38

Shoring being done in excavated portion to protect adjacent Structures

COST OPTIMIZATION

39

Using AAC Block Jali in Façade Cladding

Applying only two coat putty and two coat OBD , directly over the fair

finished concrete surface . No Plaster is required.

Providing optimum Aluminium sections at different locations of an apartment.

I.e. Premium sections for bigger windows/openings and regular sections

for comparatively small openings.

Domal Euro Series 65mm x 27mm for opening size

4350mm x 2225mm

Regular Section 18mm x 40mm for opening size

1500mm x 1500mm

Getting the service Shaft Backlit to enhance the Overall appearance of

the Building with an economical aspect.

Granite Door Frames provided in place of regular wooden door frames, for Wet areas like Toilets and Dry Balconies for durability and Cost reduction.

MATERIAL STACKING

• STEEL

• SHUTTERING MATERIAL

• CEMENT

• AGGREGATE

• AAC BLOCKS

45

Steel Stacking In Racks For Each Dia. Of Bar

Diameter Wise Re- Steel Scrap Yard Bin

Testing of Steel before unloading

46

Stacking of Stirrups on Wooden Plank in Steel Yard.

Stacking of Acro-Span Stacking of MS Props

Stacking of Cement in Go-down

47

Stacking of Stirrups at site

Column Reinforcement 3D Model in Steel Yard

Column Reinforcement 2D Model in Steel Yard

48

Stacking of Fine and Corse Aggregate

Stacking of River Sand with Spillage controlStacking of AAC Blocks

49

50

Applying Anti Corrosive Paint on Steel bars to safeguard from

corrosion

Charts prepared by using Clustered Column to track the

project progress

Use of Rubber Mat below electrical panel

Cleaning of Shuttering Ply & Reinforcement bars prior concreting

Informatory Board kept at Sample flat showcasing the interior designs of

Flats & building Elevations

SAFETY AND HYGIENE

51

Mannequin For Safety PPEs1. Safety Helmet2. Safety Goggles3. Safety Mask4. Reflective Jacket5. Safety Belt6. Safety Shoes

Safety Park

52

Safety Signage On Site

53

Dust Bins Placed at Each FloorFirst Aid Centre on site

54

Provision of Safety Net Around the Building

55

56First Aid Box Available At Site

Provision of Safety Net in Cut out Area

Provision of Safety Net inside the Building

Closure of cut outs in building with Garden cloth

57

Provision of Safety Net around the building

Rope ladder being checked by Safety officer before starting of work

58

Closing of cut-outs Safe Entrance

Double layer life line Safe Access

Safety AwarenessSafety weeks observed at sites

59

Experience Sharing by Workers

Safety- Mass Tool Box Induction

Promotional Activity for Workers motivated to safety

60

Safety AwarenessSafety weeks observed at sites

61

Tree Plantation

At Site

62

Safety Net At Building Top

63

Collection of Nails & waste Binding Wires through Magnet

Celebrating National Safety Weeks on Sites

Safety Awareness

Tree Enclosure For Its Protection

66

Covering Projected Bars to Avoid Accidents

67

Safety Training to Site Team at time of Emergency

Providing Green Net During Plastering To Avoid Dust In Environment

Safety Tag On Passenger Lift Gate

Layout Demarcation of Building Point before Excavation

69

Safety Awareness

Safety Quiz Competition for Staff Safety Tag on Scaffolding

Closure of Cut outs and Open areas

70

Rubber mat provided near electrical panels

Cost effective Staircase safety with double rope

71

Regular Health Check-up of laborers is being done at Site

Emergency Contact Number Display At Site

72Contact Number Of Technicians Labelled

On Panels

World Environment Day

73

Celebration of Engineers’ Day

74

Cleanliness & Plantation in Labor Camp

Landscape Development at Labour Hutment

75

Hygiene : Fogging/Pest controlling to restrict mosquito breeding in labor camp & at site

76

Shoe Racks provided in Labour Colony77

Dustbin provided in Labour Colony & DDT Powder Spreading

RO Plant for Drinking Facility

Hutmet facility provided in Labour Colony

Toilets & Dustin Facility provided in Labour Colony

“We are endeavoring to Provide Services to our Clients and Associates with an

Honest, Dedicated and Professional approach. Lets be Fidesto.”

Message from the Desk of Director :-

Email: projects@fidesto.co.in , Visit us: www.fidesto.co.in

WE CARE!

FIDESTO PROJECTS PRIVATE LIMITED

CORPORATE OFFICE:

AAG04, Ground Floor, Shipra Krishna Azure Commercial Complex, Kaushambi, Ghaziabad (UP), Near Metro Station,Telephone: 0120 – 4329355

REGISTERED OFICE:

A-91, Ground Floor, Anand Vihar, Near Karkardooma Metro Station, Delhi – 110092

top related