TRIRIGA Capital Projects
System Requirements
Project Schedule
June 4, 2015
Release 5
Version 1.0
Release 5
Version 1.0 Page ii
Document Revision History
Version Revision Summary Author Date
Release 5
1.0
Managing Project Schedules Paul Tubinis
Erin Gross
Release 5
Version 1.0 Page iii
Contents
1 Project Requirements Overview .......................................................................................... 4
1.1 Background ...................................................................................................................... 4
1.2 Purpose, Scope and Objectives ........................................................................................ 4
1.3 Roles and Responsibilities ............................................................................................... 4
2 Assumptions, Constraints, and Dependencies, .................................................................... 6
2.1 Assumptions ..................................................................................................................... 6
2.2 Constraints ........................................................................................................................ 6
2.3 Dependencies ................................................................................................................... 6
3 Functional Capabilities ........................................................................................................ 6
4 Data Elements ...................................................................................................................... 7
5 Screenshots by Tab Exhibit ................................................................................................. 8
5.1 Schedule Tab .................................................................................................................... 8
5.2 Schedule Tab #2 ............................................................................................................... 9
5.3 Logic from original build for tracking schedule variance ................................................ 9
5.4 Schedule TRIRIGA Work Flow from original configuration ........................................ 11
6 Approvals and Signoff ....................................................................................................... 11
Release 5
Version 1.0 Page 4
1 Project Requirements Overview
ECM presently is using spreadsheets to track the progress of Capital Projects for FDD. ECM had
been given the opportunity in 2011 to use TRIRIGA as the web enabled tool to track Capital
Projects and report to leadership on the status of Capital Projects using a report from TRIRIGA
application to support the monthly IPR process. Approximately 90 projects were input into
TRIRIGA and were actively tracked criteria including cost, schedule and other high level details.
1.1 Background
The requirements were started in February of 2012. It took approximately 6 months for the phase
one functionality to be completed. Due to multiple factors the ability to use TRIRIGA to track
projects was stopped in 2013. The TRIRIGA platform and applications were upgraded and the
entire configuration for ECM to use TRIRIGA to track Capital Projects was no longer available.
This removal of the technology platform for managing Requests for Project and day to day
activities of a project once it has been funded has forced the ECM team to use spreadsheets,
emails and other manual tools and files to manage complex business process associated with
WHS projects.
ECM at any time can have 75-100 projects either in the construction phase or in the investigating
the requests that have been made by the different Agencies.
1.2 Purpose, Scope and Objectives
ECM has a monthly process known as the IPR report that uses gantt chart capabilities to look at
the original baseline date and changes to the project schedule. The data for this report includes
the ability to portray Schedule Variance’ PoP, SPI and other key project points from schedule
maintenance.
1.3 Roles and Responsibilities
POC Agency Role
Greg Parker FSD/PCD/PMO PMO Program Manager
Mike Stebbing FSD/EECM/PCD Stakeholder (SME)
Paul Tubinis NET TRIRIGA (SME)
Faizullah Khattak FSD/FFD/FBSO COR
Adetutu Bosede EISTD Application Development Manager
Aaron Foster EITSD IFSA Project Manager
Erin Gross FBSO TRIRIGA Assistant Business Analyst
Release 5
Version 1.0 Page 5
Release 5
Version 1.0 Page 6
2 Assumptions, Constraints, and Dependencies,
2.1 Assumptions
TRIRIGA application set has the capability to manage complex project data.
2.2 Constraints
2.3 Dependencies
The system must be able to upload documents.
The system Gantt chart capabilities are required to function in the system. At this time this
function does not work in TRIRIGA Business Processes
ECM has a monthly process known as the IPR report that uses gantt chart capabilities to look at
the original baseline date and changes to the project schedule. The data for this report includes
the ability to portray Schedule Variance’ PoP, SPI and other key project points from schedule
maintenance.
3 Functional Capabilities
Req. # Requirement Comments Priority Date
Rvwd
1 Ability to pick project templates
on the schedule tab. There will
be 4 different templates.
2 Ability to have the system check
project status based on a date in
time to support the monthly IPR
process
3 Produce IPR Green, Yellow, Red
Report
Release 5
Version 1.0 Page 7
4 Data Elements Review/
Revise
# Data Element Label Type Required? Format Default
Value
Description
Schedule Tab Probable
move to
when we do
the schedule
5.1 Add a field titled:
“Project % Complete”
Calculated
Probable
move to
when we do
the schedule
5.2 Add a field titled:
“Schedule Variance”
Calculated Values:
TBD
Probable
move to
when we do
the schedule
5.5 Add a field titled:
“SPI”
Calculated Calculations:
Earned Value
Planned Value
Probable
move to
when we do
the schedule
5.6 Add a field titled:
“PoP”
Calculated Calculated from
“Planned Start” to that of
the “Planned End”
Release 5
Version 1.0 Page 8
5 Screenshots by Tab Exhibit
5.1 Schedule Tab
Release 5
Version 1.0 Page 9
5.2 Schedule Tab #2
5.3 Logic from original build for tracking schedule variance
The decision tree for calculating the baseline schedule variance is as follows:
After the upload of the project is initiated (or an upload to update the project) the system runs a
number of work flows in the back ground. One of those workflows runs the following number of
checks against Planning, Design, and Construction tasks associated to the Project.
1. If there is no base line end date in the tasks it maps an "Incomplete Data" value to the
field, if there is a value in all the tasks it move to the next validation;
Release 5
Version 1.0 Page 10
2. If the Project status is Cancelled, Close-Out, or On-hold the field is set to "NOT
APPLICABLE"; if the validation fails, and the Project status is anything but the aforementioned,
it moves to the next validation;
3. If there is no value in the Project Actual Start Date the field is set to "Not
APPLICABLE", if there is a value, it moves to the next validation;
4. If there is a value in the Construction Task's Actual Start date:
4.1 And the Base Line Start Date is less than the Actual Start date the field is mapped
with "DELAYED"
4.2 And the Base Line Start Date is greater than the Actual Start Date the field is
mapped with "ON SCHEDULE"
5. If there is a value in the Design Task Actual End date:
5.1 And the Base Line Start Date is less than the Actual Start date the field is mapped
with "DELAYED"
5.2 And the Base Line Start Date is greater than the Actual Start Date the field is
mapped with "ON SCHEDULE"
6. If there is a Value in the Planning task Actual Start Date:
6.1 And the Base Line Start Date is less than the Actual Start date the field is mapped
with "DELAYED"
6.2 And the Base Line Start Date is greater than the Actual Start Date the field is
mapped with "ON SCHEDULE"
Release 5
Version 1.0 Page 11
5.4 Schedule TRIRIGA Work Flow from original configuration
6 Approvals and Signoff
Digitally signing this document below constitutes my concurrence.
Release 5
Version 1.0 Page 12