fabless dedicated erp · fabless dedicated erp fablesserptm . 2 1 process management issue probe...

Post on 09-Oct-2020

4 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

fabless dedicated ERP FabLessERPTM

2

1 Process Management Issue

Probe

Test

Fab Tape

& Reel

Assembly Warehouse Test

3

2 Process & Reports

4

3 Who needs FabLessERP?

5

4 To Be Smarter

6

5 Winning Factors for Fabless

System link to customer’s rolling forecast and production plan

Building reliable production management system

7

6 Summary of Benefits

8

I. ‘FabLessERPTM’ Overview

II. Block diagram

III. System diagram

IV. Features and Benefits

V. Main functions

VI. Core Technologies

VII. Main features

VIII. Required Setup time

IX. Expectation

Contents

9

Ⅰ FabLessERPTM Overview

10

Ⅱ Block diagram

11

Ⅲ System Diagram

12

Ⅳ Features and Benefits

13

Ⅴ Main functions

14

Ⅵ Core technologies

15

Ⅶ Main features (1/16)

16

Ⅶ Main features (2/16)

17

Ⅶ Main features (3/16)

18

Ⅶ Main features (4/16)

19

Ⅶ Main features (5/16)

20

Ⅶ Main features (6/16)

21

Ⅶ Main features (7/16)

22

Ⅶ Main features (8/16)

23

Ⅶ Main features (9/16)

24

Ⅶ Main features (10/16)

25

Ⅶ Main features (11/16)

26

Ⅶ Main features (12/16)

27

Ⅶ Main features (13/16)

28

Ⅶ Main features (14/16)

29

Ⅶ Main features (15/16)

30

Ⅶ Main features (16/16)

31

Ⅷ Required Setup time

32

Ⅸ Effects

33

Step 1: System Setup, scheduled for 1 month

- FabLessERPTM installation

- After the installation, users have access to the system and input data.

Step 2: System Optimization, scheduled for 2 months

- Customization or optimization of the system to the client’s needs.

Product training for the employees if needed

‘FabLessERPTM’ with OracleDB

Manager : Lee, sun wook (FabLessERP@gmail.com)

+82-10-8724-4282

www.FabLessERP.com

Milestone

top related