f a f harpe reservation - geddis architects · john brice, aia principal–in-charge winston...

Post on 25-Sep-2020

2 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

DESIGN TEAM

John Brice, AIA

Principal–in-Charge

Winston Collins, AIA

OWNER/CLIENT

Fresh Air Fund

New York, NY

PROJECT DATA

Type of Facility:

Recreation & Camps

Area of Building:

13,210 SF

Total Project Cost: $4.7 Million

Completion Date:

July 2009

FRESH AIR FUND SHARPE RESERVATION Camp Hayden Marks, Fishkill, NY

Architecture . Planning . Interiors

Geddis

Architects

For 125 years, The Fresh Air Fund has provided children from New York City the

opportunity for valuable life lessons at the stunning 2300 acre Sharpe Reserva-

tion in Fishkill, NY. Built in the 1960’s, the original structures of Camp Hayden,

one of its five mountainside camps, were deteriorated and not supportive of

the eclectic educational offerings.

Part of a reconstruction plan, the new dining hall accommodates 320 campers

and staff. The design takes advantage of the sloping site with walk-out class-

rooms for digital art and photography below dining. A twenty foot long wood

screen hides the servery and provides a backdrop for performances. The soar-

ing roof line of the hall recalls the design of the original camp buildings, while

the steel rod and timber trusses evoke an earlier industrial era.

Sustainable design elements include the south facing main roof with a large

area for future photo-voltaic panels and the terraced retaining walls which

work as integrated storm water filters. There are expansive windows, as well as

operable clerestory louvers for enhanced natural

ventilation.

FRESH AIR FUND SHARPE RESERVATION

Camp Hayden Marks, Fishkill, NY

top related