existing 30.00 m (100' - 0) wide road proposed 45.00 m ... site drawing and... · & obtain...

Post on 02-Aug-2020

0 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

ISO_full_bleed_2A0_(1189.00_x_1682.00_MM)

REP BY :

SURVEY NOPLOT NO.PLAN SHOWING THE PROPOSED

BELONGING TO : Mr./Ms./Mrs

DATE : SHEET NO.:

SITUATED AT

LICENCE NO:

Project Title

APPROVAL NO: 1/C21/12058/2018

Supervisor_C

CA/1999/25448

MADHAPUR, Ranga Reddy

641-118/1/9

Layout Plan Details25-07-2018 1 / 2

Mukul Chaudhary

COUNCIL REP. BY SRI. RAJIV BHATNAGARM/s. APPAREL EXPORT PROMOTION

Commercial

BUILDER'S NAME AND SIGNATURE

OWNER'S NAME AND SIGNATURE

ARCHITECT'S NAME AND SIGNATURE

STRUCTURAL ENGINEER'S NAME AND SIGNATURE

Note: All dimensions are in meters.

AREA STATEMENTPROJECT DETAIL : Inward_No             : 1/C12/17696/2017  Plot Use                  : Commercial Project Type             : Building Permission  Plot SubUse                  : Training Institute Nature of Development             : New  PlotNearbyNotifiedReligiousStructure                  : NA SubLocation             : New Areas / Approved Layout Areas  Land Use Zone                  : Commercial zone Village Name             : MADHAPUR  Land SubUse Zone                  : NA Mandal             : SERILINGAMPALLY  Abutting Road Width                  : 45.00

 Plot No                  : 1-118/1/9 Survey No.                  : 64 North side details                  : Existing building - South side details                  : ROAD WIDTH - 30.00 East side details                  : Existing building - West side details                  : Existing building -

AREA DETAILS : SQ.MT.AREA OF PLOT (Minimum) (A) 14180.45Deduction for NetPlot Area

Road Affected Area / Road Widening Area 529.33Total 529.33

NET AREA OF PLOT (A-Deductions) 13651.11AccessoryUse Area 18.00Vacant Plot Area 10745.92

COVERAGEProposed Coverage Area ( 12.51 % ) 1707.12Existing coverage area ( 8.64 % ) 1180.07

Net BUASpecial Net BUA 1707.12

BUILT UP AREA1707.121707.12

MORTGAGE AREA 178.56EXTRA INSTALLMENT MORTGAGE AREA 0.00

Proposed Number of Parkings 0

Approval No. :

Commencement Notice shall be submitted by the applicant before commencement of the building U/s 440 of HMC Act.Completion Notice shall be submitted after completion of the building& obtain occupancy certificate U/s 455 of HMC Act.Occupancy Certificate is compulsory before occupying any building.Public Amenities such as Water Supply, Electricity Connections willbe provided only on production of occupancy certificate.Prior Approval should be obtained separately for any modification inthe construction.Tree Plantation shall be done along the periphery and also in frontof the premises.Tot-lot shall be fenced and shall be maintained as greenery at ownerscost before issue of occupancy certificate.Rain Water Harvesting Structure (percolation pit) shall be constructed.Space for Transformer shall be provided in the site keeping the safetyof the residents in view.Garbage House shall be made within the premisesCellar and stilts approved for parking in the plan should be used exclusively for parking of vehicles without partition walls & rolling shutters and the same should not be converted or misused for any other purpose at any time in future as per undertaking submitted.No. of units as sanctioned shall not be increased without prior approvalof GHMC at any time in futureThis sanction is accorded on surrendering of Road affected portion ofthe site to GHMC free of cost with out claiming any compensation atany time as per the undertaking submitted.Strip of greenery on periphery of the site shall be maintained as perrules.Stocking of Building Materials on footpath and road margin causing obstruction to free movement of public & vehicles shall not be done, failing which permission is liable to be suspended.The permission accorded does not bar the application or provisions ofUrban Land Ceiling & Regulations Act 1976.The Developer / Builder / Owner to provide service road wherever required with specified standards at their own cost.A safe distance of minimum 3.0mts. Vertical and Horizontal Distancebetween the Building & High Tension Electrical Lines and 1.5mts. forLow Tension electrical line shall be maintained.No front compound wall for the site abutting 18 mt. road width shallbe allowed and only Iron grill or Low height greenery hedge shall beallowed.If greenery is not maintained 10% additional property tax shall be imposed as penalty every year till the condition is fulfilled.All Public and Semi Public buildings above 300Sq.mts. shall be constructed to provide facilities to physically handicapped persons as perprovisions of NBC of 2005.The mortgaged builtup area shall be allowed for registration only afteran Occupancy Certificate is produced.The Registration authority shall register only the permitted built-uparea as per sanctioned plan.The Financial Agencies and Institutions shall extend loans facilitiesonly to the permitted built-up area as per sanctioned planThe Services like Sanitation, Plumbing, Fire Safety requirements, lifts,electrical installations etc., shall be executed under the supervisionof Qualified Technical Personnel.Architect / Structural Engineer if changed, the consent of the previousArchitect / Structural Engineer is required and to be intimated to theGHMC.Construction shall be covered under the contractors all risk Insurancetill the issue of occupancy certificate (wherever applicable).As per the undertaking executed in terms of G.O. Ms. No. 541 MA, dt.17-11-2000 (wherever applicable),a. The construction shall be done bythe owner, only in accordance with sanctioned Plan under the strictsupervision of the Architect, Structural Engineer and site engineerfailing which the violations are liable for demolition besides legalaction.b. The owner, builder, Architect, Structural Engineer and siteengineer are jointly & severely responsible to carry out and completethe construction strictly in accordance with sanctioned plan.c. TheOwner, Builder, Architect, Structural Engineer and Site Engineer arejointly and severely are held responsible for the structural stabilityduring the building construction and should strictly adhere to all theconditions in the G.O.d. The Owner / Builder should not deliver thepossession of any part of built up area of the building, by way of Sale/ Lease unless and until Occupancy Certificate is obtained from GHMCafter providing all the regular service connections to each portionof the building and duly submitting the following.(i) Building Completion Certificate issued by the Architect duly certifying that the building is completed as per the sanctioned plan.(ii) Structural StabilityCertificate issued by the Structural Engineer duly certifying that thebuilding is structurally safe and the construction is in accordancewith the specified designs.(iii) An extract of the site registers containing inspection reports of Site Engineer, Structural Engineer andArchitect.(iv) Insurance Policy for the completed building for a minimumperiod of three years.33. Structural Safety and Fire Safety Requirements shall be the responsibility of the Owner, Builder/ Developer, Architect and St. Engineerto provide all necessary Fire Fighting installations as stipulated inNational Building Code of India, 2005 like;

i) To provide one entryand one exit to the premises with a minimum width of 4.5mts. and heightclearance of 5mts.

ii) Provide Fire resistant swing door for the collapsible lifts in all floors.

iii) Provide Generator, as alternatesource of electric supply.

iv) Emergency Lighting in the Corridor/ Common passages and stair case.

v) Two numbers water type fireextinguishers for every 600 Sq.mts. of floor area with minimum of fournumbers fire extinguishers per floor and 5k DCP extinguishers minimum2 Nos. each at Generator and Transformer area shall be provided as perI.S.I. specification No.2190-

1992.

vi) Manually operated and alarmsystem in the entire buildings;

vii) Separate Underground static waterstorage tank capacity of 25, 000 lits. Capacity.

viii) Separate Terrace Tank of 25,000lits capacity for Residential buildings;

ix) HoseReel, Down Corner.

x) Automatic Sprinkler system is to be providedif the basement area exceed 200 Sq.mts.

xi) Electrical Wiring andinstallation shall be certified by the electrical engineers to ensureelectrical fire safety.

xii) Transformers shall be protected with4 hours rating fire resist constructions.

xiii) To create a jointopen spaces with the neighbours building / premises for maneuverabilityof fire vehicles. No parking or any constructions shall be made in setbacks area.The Builder/Developer shall register the project in the RERA websiteafter the launch in July 2018If construction is not commenced within one year, building applicationshall be submitted afresh duly paying required fees.Sanctioned Plan shall be followed strictly while making the construction.Sanctioned Plan copy as attested by the GHMC shall be displayed at theconstruction site for public view.The permission accorded does not confer any ownership rights, At a laterstage if it is found that the documents are false and fabricated thepermission will be revoked U/s 450 of HMC Act 1955.

EXISTING (To be demolished)EXISTING (To be retained)

PROPOSED CONSTRUCTIONABUTTING ROADPLOT BOUNDARY

COLOR INDEX

COMMON PLOTROAD WIDENING AREA

Building Use/Subuse Details

Building Name Building Use Building SubUse Building Type Floor DetailsBLDG (BLOCK 1) NA 1 Ground + 0 upper floorsBLDG (BLOCK 2) NA 1 Ground + 0 upper floors

Required Parking

Building Name Type SubUse Area (Sq.mt.)Units

Required Parking Area (Sq.mt.)Required Proposed

BLDG (BLOCK 1) Assembly Theatre > 0 1 853.56 341.42BLDG (BLOCK 2) Assembly Theatre > 0 1 853.56 341.42

Total : - - - 682.84

Parking Check

Vehicle TypeRequired Proposed

Proposed Area(Sq.mt.)No. Area(Sq.mt.) No. Area(Sq.mt.)

Car - 682.84 0 0.00 2163.81Car - 682.84 0 0.00 2163.81Visitor's Car Parking - 68.28 0 0.00 0.00Visitor's Car Parking - 68.28 0 0.00 0.00Total 751.12 0.00 2163.81

Net Built up Area & Dwelling Units Details

Building No. of Same Bldg Total Built Up Area (Sq.mt.)Proposed Net Built up Area (Sq.mt.) Add Area In Net Built up Area(Sq.mt.)

Total Net Built up Area (Sq.mt.)Assembly Stair

BLDG (BLOCK 1) 1 853.56 853.56 0.00 853.56BLDG (BLOCK 2) 1 853.56 853.56 11.72 865.28Grand Total : 2 1707.12 1707.12 11.72 1718.84

Building :BLDG (BLOCK 1)

Floor Name Total Built Up Area (Sq.mt.)Proposed Net Built up Area (Sq.mt.)

Total Net Built up Area (Sq.mt.)Assembly

Ground Floor 853.56 853.56 853.56Terrace Floor 0.00 0.00 0.00Total : 853.56 853.56 853.56Total Number of Same Buildings : 1Total : 853.56 853.56 853.56

SCHEDULE OF JOINERY:

BUILDING NAME NAME LENGTH HEIGHT NOSBLDG (BLOCK 1) D2 0.75 2.10 04BLDG (BLOCK 1) D1 1.80 2.10 09

SCHEDULE OF JOINERY:

BUILDING NAME NAME LENGTH HEIGHT NOSBLDG (BLOCK 1) V 0.80 2.00 08BLDG (BLOCK 1) V 0.87 2.00 01BLDG (BLOCK 1) W3 1.48 3.00 01BLDG (BLOCK 1) W3 1.79 3.00 01BLDG (BLOCK 1) W1 3.90 2.00 24BLDG (BLOCK 1) W3 4.28 3.00 01

Building :BLDG (BLOCK 2)

Floor Name Total Built Up Area (Sq.mt.)Proposed Net Built up Area (Sq.mt.) Add Area In Net Built up Area (Sq.mt.)

Total Net Built up Area (Sq.mt.)Assembly Stair

Ground Floor 853.56 853.56 0.00 853.56Terrace Floor 0.00 0.00 11.72 11.72Total : 853.56 853.56 11.72 865.28Total Number of Same Buildings : 1Total : 853.56 853.56 11.72 865.28

SCHEDULE OF JOINERY:

BUILDING NAME NAME LENGTH HEIGHT NOSBLDG (BLOCK 2) D2 0.75 2.10 04BLDG (BLOCK 2) D1 1.80 2.10 04

SCHEDULE OF JOINERY:

BUILDING NAME NAME LENGTH HEIGHT NOSBLDG (BLOCK 2) V 0.80 2.00 08BLDG (BLOCK 2) W3 1.22 3.00 01BLDG (BLOCK 2) W3 1.25 3.00 01BLDG (BLOCK 2) W2 2.10 2.00 01BLDG (BLOCK 2) W1 3.90 2.00 23BLDG (BLOCK 2) W3 3.90 3.00 01BLDG (BLOCK 2) W3 4.64 3.00 01

DN

DN

LIFT LIFT

0.23 M Parapet Wall

0.23 M Parapet Wall

0.23 M Parapet Wall

OPEN TERRACE

OPEN TERRACE

TERRACE FLOOR PLAN(BLOCK1)

18.60M

18.60M

9.00M

9.00M

9.00M

9.00M

18.60M

18.6

0M

9.00M

9.00M

9.00M

9.00M

GROUND FLOORPLAN (BLOCK 1)

Store4.6 X 4.6 M

Class room8.77X13.27 M

Stitching room13.27X8.95 M.

up

upToilet (F)

3.47X3.15M

LIFT LIFT

Toilet (M)3.48 X 3 M

Toilet (F)3.48X2.3 M

18.60M

18.60M

9.00M

9.00M

9.00M

9.00M

18.60M

18.60M

9.00M

9.00M

9.00M

9.00M

B

A

A

B

B

A

A

B

Hi-

Tec

h C

ity m

ain

Roa

d

PVR ICON

Hi-

Tec

h C

ity m

ain

Roa

d

Apparel Trainingand Design Center(Existing)

NIFT

Ground FloorLVL+.45 M

RoofLVL+3.45 M

Parapet WallLVL+4.35 M

MumtyLVL+6.0 M

StaircaseLiftStaircase

Lvl +9mLvl ±0m Lvl +18m

FRONT ELEVATION (BLOCK1)G.L.

3.45M

0.45M

0.90M

1.65M

G.L.

Ground FloorLVL+.45 M

RoofLVL+3.45 M

Parapet WallLVL+4.35 M

MumtyLVL+6.0 M

SECTION AA

3.60M

0.45M

0.90M

1.65M

Ground FloorLVL+.45 M

G.L.

RoofLVL+3.45 M

Parapet WallLVL+4.35 M

MumtyLVL+6.0 M

SECTION BB

0.45M

3.45M

0.90M

1.65M

W1

W1

W1 W1

W1 W1

W1

W1

W1

W1

W1 W1

W1

W1

W1 W1 W1 W1

W1

W1

W1

W1

W1

W1

W2W2

D1

D1

D1

D1

D1

D1 D1D1

D1

D2

D2

D2

D2 D2

D2 D2

D2

D2

D2

D3

V

V

V

VV

V

V

V

V V

LOCATION PLAN (NTS)

SECTION AT 'X-X'

COARSE SAND

20MM METAL

800

425

425

G L

40MM METAL

1650

X

230

X

PLAN OF PERCULATION PIT

1650

230

PERCULATION PITPLAN & SECTION DETAIL

Location Plan

W1 W1 W1 W1

W1 W1

W1

W1

W1W1

W1

W1

W1

W1

W1 W1

W1

W1

W1W1

W1 W1 W1 W1

V V

V

V

V

V

V

VV

CLASS ROOM9.14X13.20

STICHING ROOM8.95X13.27

TOILET2.32X3.47

TOILET3.08X3.48

TOILET2.32X3.48

ENTRANCE LOBBY10.01X11.24 LOBBY

4.64X8.40

LOBBY4.64X13.27

STORE4.64X4.64

STORE4.64X4.64

W3 W3

D1

D1

D1

D2

D2

D2

D2

D1

D1

D1 D1

D1

D1

W3

Lift Machine Room

Lift Machine Room

D3

STAIRCASE

STAIRCASE

SPLIT 1

UP

UP

Built Up Area to Mortgage

G.L GROUND FLOOR

PLINTH

NN

N

N

Elevation1

TERRACE FLOOR

BLOCK-1

SITE PLAN

EXISTING BUILDINGBLOCK 1

HA

LL100 sqm R

O A

D

COVERED WALKWAY

EN

TRY

ENTRY

+0.75

COVERED WALKWAY

R O

A D

BLOCK-2PROPOSED

EXISTING 30.00 m (100' - 0") WIDE ROAD

BLOCK-1PROPOSED

PROPOSED 45.00 m (150' - 0") WIDE ROAD

ROAD AFFECTED AREA : 533.33 Sq. Mtrs OR 637.85 Sq. Yds

7

.

5

0

M

5.10M

4.76M

12.23M

17.49M

12.62M

13.89M

13.89M

22.4

1M

5.00M

5.00M

6.66M

5.01M

5.00M

5.00M

5.00M

5.44M

5.00M

5.00M

5.00M

5.00M

5.00M

5.00M

5.00M

TOT - LOT AREA -- 21147.39 Sq. Mtrs.

TOT - LOT AREA -- 3541.41 Sq. Mtrs.

5.00M

5.00M

5.00M

5

.3

7

M

6

.

0

0

M

6

.

0

0

M

13.17M

13.17M

7.54M

5.00M

5.00M

12.20M

5.9

9M

14.2

0M

6.65M

6.1

2M

TOT - LOT AREA -- 1218.92 Sq. Mtrs.

3.01 m

Tot lot

Tot lot

Tot lot

SURFACE PARKING AREA2447.82 Sq. Mtrs.

PARKING

ROAD WIDENING AREA

45.00 m WIDE MAINROAD

PLOT

Green Strip

1.00 m WIDE GREENERYP.P

RAINWATER

HARVESTING

RAINWATER

HARVESTING

PercolatingWell

P.P

RAINWATER

HARVESTING

RAINWATER

HARVESTING

PercolatingWell

P.P

RAINWATER

HARVESTING

RAINWATER

HARVESTING

PercolatingWell

P.P

RAINWATER

HARVESTING

RAINWATER

HARVESTING

PercolatingWell

P.P

RAINWATER

HARVESTING

RAINWATER

HARVESTING

PercolatingWell

P.P

RAINWATER

HARVESTING

RAINWATER

HARVESTING

PercolatingWell

P.P

RAINWATER

HARVESTING

RAINWATER

HARVESTING

PercolatingWell

P.P

RAINWATER

HARVESTING

RAINWATER

HARVESTING

PercolatingWell

P.P

RAINWATER

HARVESTING

RAINWATER

HARVESTING

PercolatingWell

P.P

RAINWATER

HARVESTING

RAINWATER

HARVESTING

PercolatingWell

P.P

RAINWATER

HARVESTING

RAINWATER

HARVESTING

PercolatingWell

P.P

RAINWATER

HARVESTING

RAINWATER

HARVESTING

PercolatingWell

P.P

RAINWATER

HARVESTING

RAINWATER

HARVESTING

PercolatingWell

P.P

RAINWATER

HARVESTING

RAINWATER

HARVESTING

PercolatingWell

P.P

RAINWATER

HARVESTING

RAINWATER

HARVESTING

PercolatingWell

P.P

RAINWATER

HARVESTING

RAINWATER

HARVESTING

PercolatingWell

P.P

RAINWATER

HARVESTING

RAINWATER

HARVESTING

PercolatingWell

P.P

RAINWATER

HARVESTING

RAINWATER

HARVESTING

PercolatingWell

P.PRAIN

WATERHARVESTING

RAINWATER

HARVESTING

PercolatingWell

P.PRAIN

WATERHARVESTING

RAINWATER

HARVESTING

PercolatingWell

P.PRAINWATER

HARVESTING

RAINWATERHARVESTING

PercolatingWell

P.P

RAIN

WATER

HARVESTINGRAIN

WATER

HARVESTING

Percolating

Well

P.P

RAIN

WATER

HARVESTING

RAIN

WATER

HARVESTING

Percolating

Well

P.P

RAIN

WATER

HARVESTINGRAIN

WATER

HARVESTING

Percolating

Well

P.PRAINWATER

HARVESTING

RAINWATERHARVESTING

PercolatingWell

P.PRAINWATER

HARVESTING

RAINWATERHARVESTING

PercolatingWell

1.00 m WIDE GREENERY

1.00 m WIDE GREENERY 1.00 m WIDE GREENERY

1.00

m W

IDE

GR

EE

NE

RY1.00 m WIDE GREENERY

1.00 m WIDE GREENERY

1.00 m WIDE GREENERY

1.00

m W

IDE

GR

EE

NE

RY

1.00

m W

IDE

GR

EE

NE

RY

1.00

m W

IDE

GR

EE

NE

RY

1.00

m W

IDE

GR

EE

NE

RY

1.00

m W

IDE

GR

EE

NE

RY

1.00

m W

IDE

GR

EE

NE

RY

1.00

m W

IDE

GR

EE

NE

RY

1.00 m WIDE GREENERY

1.00

m W

IDE

GR

EE

NE

RY

1.00

m W

IDE

GR

EE

NE

RY

1.00

m W

IDE

GR

EE

NE

RY

1.00

m W

IDE

GR

EE

NE

RY

1.00

m W

IDE

GR

EE

NE

RY

P.P

RAINWATER

HARVESTING

RAINWATER

HARVESTING

PercolatingWell

1.00 m WIDE GREENERY

1.00 m WIDE GREENERY

P.P

RAIN

WATER

HARVESTINGRAIN

WATER

HARVESTING

Percolating

Well

1.00 m WIDE GREENERY

1.00

m W

IDE

GR

EE

NE

RY

1.00

m W

IDE

GR

EE

NE

RY

ENT.GATE

1.50

m H

T C

OM

POU

ND

WA

LL

Green Strip

7

.

5

0

M

N

ExStructure TO BE RETAINED-1

BLDG-1 (BLOCK 1)

BLDG-1 (BLOCK 2)

Distribution transformer

Distribution transformer

PLOT

45.00 m WIDE MAINROAD

ROAD WIDENING AREA

Tot lot

Tot lot

Tot lot

Green Strip

Green Strip

Distribution transformer

Distribution transformer

RAIN

WATER

HARVESTING

RAINWATER

HARVESTING

RAINWATERHARVESTING

RAINWATERHARVESTING

RAIN

WATER

HARVESTING

RAIN

WATER

HARVESTING

RAIN

WATER

HARVESTING

RAINWATERHARVESTING

RAINWATER

HARVESTING

RAINWATER

HARVESTING

RAINWATER

HARVESTING

RAINWATER

HARVESTING

RAINWATER

HARVESTING

RAINWATER

HARVESTING

RAINWATER

HARVESTING

RAINWATER

HARVESTING

RAINWATER

HARVESTING

RAINWATER

HARVESTING

RAINWATER

HARVESTING

RAINWATER

HARVESTING

RAINWATER

HARVESTING

RAINWATER

HARVESTING

RAINWATER

HARVESTING

RAINWATER

HARVESTING

RAINWATER

HARVESTING

RAINWATER

HARVESTING

RAINWATER

HARVESTING

RAINWATER

HARVESTING

Percolating

Well

PercolatingWell

PercolatingWell

PercolatingWell

Percolating

Well

Percolating

Well

Percolating

Well

PercolatingWell

PercolatingWell

PercolatingWell

PercolatingWell

PercolatingWell

PercolatingWell

PercolatingWell

PercolatingWell

PercolatingWell

PercolatingWell

PercolatingWell

PercolatingWell

PercolatingWell

PercolatingWell

PercolatingWell

PercolatingWell

PercolatingWell

PercolatingWell

PercolatingWell

PercolatingWell

PercolatingWell

ENT.GATE

BLDG-1 (BLOCK 2)

BLDG-1 (BLOCK 1)

ExStructure TO BE RETAINED-1

PARKING

70.66

193.3

0

BLDG (BLOCK 1)BLDG HT: 3.60 MT.NO OF FLOORS: 1

BLDG (BLOCK 2)BLDG HT: 3.60 MT.NO OF FLOORS: 1

4.23

0.92

0.94

0.88

6.59

0.83

0.86

0.94

0.97

0.90

0.77

0.79

0.94

0.90

0.85

0.90

0.81

0.89

0.66

0.97

7.08

8.49

0.84

0.80

0.66

8.37

8.42

0.92

0.92

0.98

1.00

0.93

5.88

0.84

0.87

0.94

0.97

0.90

0.78

0.80

0.95

0.91

0.85

0.90

0.82

0.90

0.97

0.72

7.10

8.49

0.87

0.82

0.92

8.36

8.41

0.97

0.94

3.15

2.61

36.60

36.60

36.60

36.60

12.00 Front Margin PLOT

12.00 Front Margin PLOT

134.10

12.00 Front Margin PLOT

12.00 Front Margin PLOT

87.27

48.41

6.00 S

ide1 M

argin

Mar

gin P

LOT

5.99

6.00 S

ide2 M

argin

Mar

gin P

LOT

13.89

6.00 S

ide1 M

argin

Mar

gin P

LOT

6.11

6.00 S

ide2 M

argin

Mar

gin P

LOT

6.00 Rear Margin PLOT15.87 6.00 Rear Margin PLOT

41.62

S1S2

S3S4

S5S6

S7 S8

S9 S10

S11 S12

S1S2

S3S4

S5S6

S7 S8

S9 S10

S11 S12

S1S2

S3S4

S5S6

S7 S8

S9 S10

S11 S12

S1S2

S3S4

S5S6

S7 S8

S9 S10

S11 S12

S1

S2 S3

S4 S5

S6 S7

S8S9

S10S11

S12S1

S2 S3

S4 S5

S6 S7

S8S9

S10S11

S12S1

S2 S3

S4 S5

S6 S7

S8S9

S10S11

S12S1

S2 S3

S4 S5

S6 S7

S8S9

S10S11

S12

21.1721.17

P1 P2

P3

P4

P5

P6

P7

P8

P9

P10

P11

P12P13

P14

P15

15.77(P)

42.98(P)

34.63(P)

12.47(P)

193.3

0(P)

9.16(P)

22.81(P)

38.70(P)

60.25

(P)

58.63

(P)

12.14

(P)

20.99(P)15.67(P)

73.69

(P)

3.04(

P)

183.8

9

12.38

34.59

42.89

15.50

2.83

68.01

18.90

14.03

13.97

20.96

65.84

0.98

13.18

42.08

34.22

11.57

179.4

3

2.39

2.39

4.77

38.94

42.12

10.00

2.39

11.29

43.23

40.06

2.00

9.00

9.00

14.28

23.58

20.77

11.24

44.64

29.76

21.70

18.23

22.11

6.53

5.43

15.42

21.22

21.17

13.18

42.47

33.90

11.52

16.96

38.30

46.94

45.99

22.07

43.36(RW)

27.16(RW)

8.90(

RW)

9.16(RW)

22.81(RW)

38.70(RW)

8.80(

RW)

10.68

10.64

3.003.00

3.003.00

112.15

33.35

17.89

6.68

9.98

4.83

6.19

49.90

63.59

84.98

118.3795.36

78.1656.54

33.23

12.50

15.02

28.37

40.12

28.00

3.57

109.2

9

37.85

17.37

18.92

99.09

90.87

5.56

28.07

32.76

17.36

6.96

9.34

4.83

6.59

50.52

64.25

85.67

119.0896.07

78.8757.24

33.89

12.61

14.63

27.90

39.65

27.89

3.57

109.6

8

38.33

17.55

18.39

99.48

91.17

5.12

28.56

12.49

22.54

(NOT TO SCALE)

ISO_full_bleed_2A0_(1189.00_x_1682.00_MM)

REP BY :

SURVEY NOPLOT NO.PLAN SHOWING THE PROPOSED

BELONGING TO : Mr./Ms./Mrs

DATE : SHEET NO.:

SITUATED AT

LICENCE NO:

Project Title

APPROVAL NO: 1/C21/12058/2018

Supervisor_C

CA/1999/25448

MADHAPUR, Ranga Reddy

641-118/1/9

Layout Plan Details25-07-2018 2 / 2

Mukul Chaudhary

COUNCIL REP. BY SRI. RAJIV BHATNAGARM/s. APPAREL EXPORT PROMOTION

Commercial

BUILDER'S NAME AND SIGNATURE

OWNER'S NAME AND SIGNATURE

ARCHITECT'S NAME AND SIGNATURE

STRUCTURAL ENGINEER'S NAME AND SIGNATURE

Note: All dimensions are in meters.

AREA STATEMENTPROJECT DETAIL : Inward_No             : 1/C12/17696/2017  Plot Use                  : Commercial Project Type             : Building Permission  Plot SubUse                  : Training Institute Nature of Development             : New  PlotNearbyNotifiedReligiousStructure                  : NA SubLocation             : New Areas / Approved Layout Areas  Land Use Zone                  : Commercial zone Village Name             : MADHAPUR  Land SubUse Zone                  : NA Mandal             : SERILINGAMPALLY  Abutting Road Width                  : 45.00

 Plot No                  : 1-118/1/9 Survey No.                  : 64 North side details                  : Existing building - South side details                  : ROAD WIDTH - 30.00 East side details                  : Existing building - West side details                  : Existing building -

AREA DETAILS : SQ.MT.AREA OF PLOT (Minimum) (A) 14180.45Deduction for NetPlot Area

Road Affected Area / Road Widening Area 529.33Total 529.33

NET AREA OF PLOT (A-Deductions) 13651.11AccessoryUse Area 18.00Vacant Plot Area 10745.92

COVERAGEProposed Coverage Area ( 12.51 % ) 1707.12Existing coverage area ( 8.64 % ) 1180.07

Net BUASpecial Net BUA 1707.12

BUILT UP AREA1707.121707.12

MORTGAGE AREA 178.56EXTRA INSTALLMENT MORTGAGE AREA 0.00

Proposed Number of Parkings 0

Approval No. :

Commencement Notice shall be submitted by the applicant before commencement of the building U/s 440 of HMC Act.Completion Notice shall be submitted after completion of the building& obtain occupancy certificate U/s 455 of HMC Act.Occupancy Certificate is compulsory before occupying any building.Public Amenities such as Water Supply, Electricity Connections willbe provided only on production of occupancy certificate.Prior Approval should be obtained separately for any modification inthe construction.Tree Plantation shall be done along the periphery and also in frontof the premises.Tot-lot shall be fenced and shall be maintained as greenery at ownerscost before issue of occupancy certificate.Rain Water Harvesting Structure (percolation pit) shall be constructed.Space for Transformer shall be provided in the site keeping the safetyof the residents in view.Garbage House shall be made within the premisesCellar and stilts approved for parking in the plan should be used exclusively for parking of vehicles without partition walls & rolling shutters and the same should not be converted or misused for any other purpose at any time in future as per undertaking submitted.No. of units as sanctioned shall not be increased without prior approvalof GHMC at any time in futureThis sanction is accorded on surrendering of Road affected portion ofthe site to GHMC free of cost with out claiming any compensation atany time as per the undertaking submitted.Strip of greenery on periphery of the site shall be maintained as perrules.Stocking of Building Materials on footpath and road margin causing obstruction to free movement of public & vehicles shall not be done, failing which permission is liable to be suspended.The permission accorded does not bar the application or provisions ofUrban Land Ceiling & Regulations Act 1976.The Developer / Builder / Owner to provide service road wherever required with specified standards at their own cost.A safe distance of minimum 3.0mts. Vertical and Horizontal Distancebetween the Building & High Tension Electrical Lines and 1.5mts. forLow Tension electrical line shall be maintained.No front compound wall for the site abutting 18 mt. road width shallbe allowed and only Iron grill or Low height greenery hedge shall beallowed.If greenery is not maintained 10% additional property tax shall be imposed as penalty every year till the condition is fulfilled.All Public and Semi Public buildings above 300Sq.mts. shall be constructed to provide facilities to physically handicapped persons as perprovisions of NBC of 2005.The mortgaged builtup area shall be allowed for registration only afteran Occupancy Certificate is produced.The Registration authority shall register only the permitted built-uparea as per sanctioned plan.The Financial Agencies and Institutions shall extend loans facilitiesonly to the permitted built-up area as per sanctioned planThe Services like Sanitation, Plumbing, Fire Safety requirements, lifts,electrical installations etc., shall be executed under the supervisionof Qualified Technical Personnel.Architect / Structural Engineer if changed, the consent of the previousArchitect / Structural Engineer is required and to be intimated to theGHMC.Construction shall be covered under the contractors all risk Insurancetill the issue of occupancy certificate (wherever applicable).As per the undertaking executed in terms of G.O. Ms. No. 541 MA, dt.17-11-2000 (wherever applicable),a. The construction shall be done bythe owner, only in accordance with sanctioned Plan under the strictsupervision of the Architect, Structural Engineer and site engineerfailing which the violations are liable for demolition besides legalaction.b. The owner, builder, Architect, Structural Engineer and siteengineer are jointly & severely responsible to carry out and completethe construction strictly in accordance with sanctioned plan.c. TheOwner, Builder, Architect, Structural Engineer and Site Engineer arejointly and severely are held responsible for the structural stabilityduring the building construction and should strictly adhere to all theconditions in the G.O.d. The Owner / Builder should not deliver thepossession of any part of built up area of the building, by way of Sale/ Lease unless and until Occupancy Certificate is obtained from GHMCafter providing all the regular service connections to each portionof the building and duly submitting the following.(i) Building Completion Certificate issued by the Architect duly certifying that the building is completed as per the sanctioned plan.(ii) Structural StabilityCertificate issued by the Structural Engineer duly certifying that thebuilding is structurally safe and the construction is in accordancewith the specified designs.(iii) An extract of the site registers containing inspection reports of Site Engineer, Structural Engineer andArchitect.(iv) Insurance Policy for the completed building for a minimumperiod of three years.33. Structural Safety and Fire Safety Requirements shall be the responsibility of the Owner, Builder/ Developer, Architect and St. Engineerto provide all necessary Fire Fighting installations as stipulated inNational Building Code of India, 2005 like;

i) To provide one entryand one exit to the premises with a minimum width of 4.5mts. and heightclearance of 5mts.

ii) Provide Fire resistant swing door for the collapsible lifts in all floors.

iii) Provide Generator, as alternatesource of electric supply.

iv) Emergency Lighting in the Corridor/ Common passages and stair case.

v) Two numbers water type fireextinguishers for every 600 Sq.mts. of floor area with minimum of fournumbers fire extinguishers per floor and 5k DCP extinguishers minimum2 Nos. each at Generator and Transformer area shall be provided as perI.S.I. specification No.2190-

1992.

vi) Manually operated and alarmsystem in the entire buildings;

vii) Separate Underground static waterstorage tank capacity of 25, 000 lits. Capacity.

viii) Separate Terrace Tank of 25,000lits capacity for Residential buildings;

ix) HoseReel, Down Corner.

x) Automatic Sprinkler system is to be providedif the basement area exceed 200 Sq.mts.

xi) Electrical Wiring andinstallation shall be certified by the electrical engineers to ensureelectrical fire safety.

xii) Transformers shall be protected with4 hours rating fire resist constructions.

xiii) To create a jointopen spaces with the neighbours building / premises for maneuverabilityof fire vehicles. No parking or any constructions shall be made in setbacks area.The Builder/Developer shall register the project in the RERA websiteafter the launch in July 2018If construction is not commenced within one year, building applicationshall be submitted afresh duly paying required fees.Sanctioned Plan shall be followed strictly while making the construction.Sanctioned Plan copy as attested by the GHMC shall be displayed at theconstruction site for public view.The permission accorded does not confer any ownership rights, At a laterstage if it is found that the documents are false and fabricated thepermission will be revoked U/s 450 of HMC Act 1955.

EXISTING (To be demolished)EXISTING (To be retained)

PROPOSED CONSTRUCTIONABUTTING ROADPLOT BOUNDARY

COLOR INDEX

COMMON PLOTROAD WIDENING AREA

Building Use/Subuse Details

Building Name Building Use Building SubUse Building Type Floor DetailsBLDG (BLOCK 1) NA 1 Ground + 0 upper floorsBLDG (BLOCK 2) NA 1 Ground + 0 upper floors

Required Parking

Building Name Type SubUse Area (Sq.mt.)Units

Required Parking Area (Sq.mt.)Required Proposed

BLDG (BLOCK 1) Assembly Theatre > 0 1 853.56 341.42BLDG (BLOCK 2) Assembly Theatre > 0 1 853.56 341.42

Total : - - - 682.84

Parking Check

Vehicle TypeRequired Proposed

Proposed Area(Sq.mt.)No. Area(Sq.mt.) No. Area(Sq.mt.)

Car - 682.84 0 0.00 2163.81Car - 682.84 0 0.00 2163.81Visitor's Car Parking - 68.28 0 0.00 0.00Visitor's Car Parking - 68.28 0 0.00 0.00Total 751.12 0.00 2163.81

Net Built up Area & Dwelling Units Details

Building No. of Same Bldg Total Built Up Area (Sq.mt.)Proposed Net Built up Area (Sq.mt.) Add Area In Net Built up Area(Sq.mt.)

Total Net Built up Area (Sq.mt.)Assembly Stair

BLDG (BLOCK 1) 1 853.56 853.56 0.00 853.56BLDG (BLOCK 2) 1 853.56 853.56 11.72 865.28Grand Total : 2 1707.12 1707.12 11.72 1718.84

Building :BLDG (BLOCK 1)

Floor Name Total Built Up Area (Sq.mt.)Proposed Net Built up Area (Sq.mt.)

Total Net Built up Area (Sq.mt.)Assembly

Ground Floor 853.56 853.56 853.56Terrace Floor 0.00 0.00 0.00Total : 853.56 853.56 853.56Total Number of Same Buildings : 1Total : 853.56 853.56 853.56

SCHEDULE OF JOINERY:

BUILDING NAME NAME LENGTH HEIGHT NOSBLDG (BLOCK 1) D2 0.75 2.10 04BLDG (BLOCK 1) D1 1.80 2.10 09

SCHEDULE OF JOINERY:

BUILDING NAME NAME LENGTH HEIGHT NOSBLDG (BLOCK 1) V 0.80 2.00 08BLDG (BLOCK 1) V 0.87 2.00 01BLDG (BLOCK 1) W3 1.48 3.00 01BLDG (BLOCK 1) W3 1.79 3.00 01BLDG (BLOCK 1) W1 3.90 2.00 24BLDG (BLOCK 1) W3 4.28 3.00 01

Building :BLDG (BLOCK 2)

Floor Name Total Built Up Area (Sq.mt.)Proposed Net Built up Area (Sq.mt.) Add Area In Net Built up Area (Sq.mt.)

Total Net Built up Area (Sq.mt.)Assembly Stair

Ground Floor 853.56 853.56 0.00 853.56Terrace Floor 0.00 0.00 11.72 11.72Total : 853.56 853.56 11.72 865.28Total Number of Same Buildings : 1Total : 853.56 853.56 11.72 865.28

SCHEDULE OF JOINERY:

BUILDING NAME NAME LENGTH HEIGHT NOSBLDG (BLOCK 2) D2 0.75 2.10 04BLDG (BLOCK 2) D1 1.80 2.10 04

SCHEDULE OF JOINERY:

BUILDING NAME NAME LENGTH HEIGHT NOSBLDG (BLOCK 2) V 0.80 2.00 08BLDG (BLOCK 2) W3 1.22 3.00 01BLDG (BLOCK 2) W3 1.25 3.00 01BLDG (BLOCK 2) W2 2.10 2.00 01BLDG (BLOCK 2) W1 3.90 2.00 23BLDG (BLOCK 2) W3 3.90 3.00 01BLDG (BLOCK 2) W3 4.64 3.00 01

GROUND FLOORPLAN (BLOCK 2)

DN

DN

LIFTLIFT

TERRACE FLOOR PLAN(BLOCK2)

18.60M

18.60M

9.00M

9.0

0M

9.00M

9.0

0M

18.60M

18.60M

9.00M

9.00M

9.00M

9.00M

Library13.27X18.14 M

Toilet(F)3.2X2.9 M

Toilet(M)3.2X2.5M

Store4.6X8.8M

LIFT LIFT

Lecture theaterroom13.27X18.14 M

Stage13.14X4.87 M

up

up

Toilet(F)3.2X2.9 M

Toilet (M)3.2X2.2 M

C

C

D D

18.60M

9.00M

9.00M

9.00M

9.00M

18

.60M

18.60M

9.00M

9.00M

9.00M

9.00M

18

.60M

Ground FloorLVL+.45 M

RoofLVL+3.45 M

Parapet WallLVL+4.35 M

MumtyLVL+6.0 M

G.L.

StaircaseLiftStaircase

FRONT ELEVATION (BLOCK2)

0.45M

3.45M

0.90M

1.65M

Ground FloorLVL+.45 M

RoofLVL+3.45 M

Parapet WallLVL+4.35 M

MumtyLVL+6.0 M

G.L.

SECTION CC

0.45M

3.60M

0.90M

1.65M

Ground FloorLVL+.45 M

G.L.

RoofLVL+3.45 M

Parapet WallLVL+4.35 M

MumtyLVL+6.0 M

SECTION DD

0.45M

3.45M

0.90M

1.65M

W1 W1 W1 W1

W1

W1

W1

W1

W1

W1W1

W1

W1

W1

W1

W1 W1 W1 W1

W1

W1

W1

W2W2

W3

D1

D1

D1

D1

D1D1

D2

D2D2

D2

D2 D2

D2

D2

D2

D2

D2

VV

V

V

V

V

V

V

Lvl +18m Lvl +9m Lvl ±0m

SECTION AT 'X-X'

COARSE SAND

20MM METAL

800

425

425

G L

40MM METAL

1650

X

230

X

PLAN OF PERCULATION PIT

1650

230

PERCULATION PITPLAN & SECTION DETAIL

W1 W1 W1W1

W1 W1 W1W1

W1 W1

W1 W2

W1

W1

W1

W1 W1

W1

W1

W1

W1

W1

W1

W1

VV

V

V

V

V

V

V

ENTRANCE LOBBY10.27X13.64

W3W3

D1

D1

D1

D1

D1

D2

D2

D2

D2

W3W3

LiftLift Machine Room

Lift Machine Room

D3

STAIRCASE

STAIRCASE

SPLIT 1

STAIRCASE

DN

UP

UP

OPEN TERRACE

OPEN TERRACE

GROUND FLOOR

TERRACE FLOOR

STAIRCASEHEADROOM

PLINTHG.L

N

NBLOCK-2

top related